West African Resources Ltd · ASX:WAF

West African Resources — Diggers and Dealers 2020

21 slides from West African Resources's conference presentation, Oct 13, 2020

  1. Slide 1: Diggers and Dealers – West African Resources Ltd

    Dig g ers an d Dealers 13 Octo b er 2020 WEST AFRICAN RESOURCES LTD AFRICA’S NEWEST UNHEDGED GOLD PRODUCER

  2. Slide 2: Important Notice and Disclaimer

    IMPORTANT NOTICE . IMPORTANT NOTICE AND DISCLAIMER This presentation contains “forward-looking information” within the meaning of securities legislation, including information relating to Information in this presentation that relates to mineral resources is based on, and fairly represents, informati

  3. Slide 3: West Africa's Newest Gold Producer

    WEST AFRICA'S NEWEST GOLD PRODUCER UNHEDGED GOLD PRODUCTION  Transformational period from 2016 to 2020 - four years from discovery to first gold  Targeting annual production 217koz gold over next five years at AISC <US$600/oz  3.1 million ounces of gold in Mineral Resources1  1.7 million ounces

  4. Slide 4: Capital Structure and Analyst Coverage

    CAPITAL STRUCTURE AND ANALYST COVERAGE . ASX: WAF Analyst Coverage2 Total Ordinary Shares on Issue 876.1m Euroz Andrew Clayton Options and performance rights on issue 12.9m Hartleys Mike Millikan Top 20 Shareholders 78% Macquarie Andrew Bowler Cash at 30 September 2020 US$73.5m Sprott Brock Salier G

  5. Slide 5: Experienced Board and Management

    EXPERIENCED BOARD AND MANAGEMENT . BOARD OF DIRECTORS SENIOR MANAGEMENT RICHARD HYDE STEWART FINDLAY MATTHEW WILCOX PADRAIG O’DONOGHUE Executive Chairman & Non-Executive Director Chief Development Chief Financial Officer & Chief Executive Officer Banking & Finance Officer Company Secretary Founder,

  6. Slide 6: West African Project Locations

    WEST AFRICAN PROJECT LOCATIONS . 6

  7. Slide 7: Sanbrado Gold Operation – Key Project Metrics

    SANBRADO GOLD OPERATION KEY PROJECT METRICS  Conventional high-grade underground and open-pit mining  Conventional 2.2Mtpa SABC CIL plant, LOM recoveries 93%  Contract underground and open pit mining  MRE of 3.1 Moz Au 2.4 Moz Au (Indicated) 0.7 Moz Au (Inferred)  Probable Reserve of 1.7 Moz Au

  8. Slide 8: Production Q3 2020

    PRODUCTION Q3 2020 R A M P I N G U P TO F U L L G O L D P R O D U C T I O N AT S A N B R A D O 894,000t processed at 1.7 g/t Au (49,000oz) - Open pits 871,770t at 1.5 g/t Au (41,500oz) - Underground 22,230t at 10.5 g/t Au (7,500oz) 93.3% plant recovery, 45,720 oz recovered 45,400oz gold poured 4

  9. Slide 9: M1 South Deposit

    M1 SOUTH DEPOSIT 2020 DEEP DRILLING PROGRAM  15,000m drilling program, US$5m budget  Focus 600m to 950m below surface  Targeting 4 – 5 year extension to UG mine life  Results so far: - TAN20-DD233: 32m at 4.9 g/t gold from 854.5m - TAN20-DD234: 0.5m at 23.9 g/t gold from 842.5m - TAN20-DD235: 7m

  10. Slide 10: Sanbrado Gold Operation – Annual Production

    SANBRADO GOLD OPERATION ANNUAL PRODUCTION – APRIL 2019 DFS + UG POTENTIAL AFTER Y6 400,000  M1 South OP 2 years, M5 OP 10 years 350,000  M1 South UG 6.5 years, Y1-6 average 100Koz gold  Deep drilling M1 South underway 300,000  Toega not included – update Q4 2020 250,000 Contained Au [oz] 200,000

  11. Slide 11: Sanbrado Regional

    SANBRADO REGIONAL G E T T I N G B A C K TO E X P L O R AT I O N WAF consolidating land around Sanbrado 1,250km2 prospective greenstone belts and structures +50km strike of Markoye Fault Advanced kilometre scale targets; - Meguet - Moktedu - Manesse - Nakomgo (Toega) - V3 (New) Aggressive explor

  12. Slide 12: Toega Deposit – Scale and Mine Life

    TOEGA DEPOSIT SCALE AND MINE LIFE WAF acquiring Toega from B2Gold and GAMS for US$45 million in staged payments Located within trucking distance (14km) of Sanbrado Existing NI43-101 Inferred Resource is 1.1Moz gold at 2.1 g/t Au, with excellent exploration upside Expected to increase the Sanbrad

  13. Slide 13: Toega Gold Deposit

    TOEGA GOLD DEPOSIT 250km2 exploration permit Main focus Toega Gold Deposit Kilometre scale targets Advanced exploration targets at V10 and Toogo Analogous geological settings to Sanbrado 13

  14. Slide 14: Toega Deposit – Scale and Mine Life

    TOEGA DEPOSIT SCALE AND MINE LIFE Toega mineralized zone; - 1,200m strike - 430m wide - 400m deep - open along strike and at depth Conventional metallurgy; 86.2% CIL recoveries Current foreign estimate based on 37,000m RC and diamond drilling 65% of drilling less than 50m x 50m Feasibility stud

  15. Slide 15: Toega Deposit – Long Section

    TOEGA DEPOSIT L O N G S E C T I O N – W I D E A N D T H I C K M I N E R A L I S AT I O N 15

  16. Slide 16: Sanbrado Gold Operation – E&S Commitments

    SANBRADO GOLD OPERATION E & S COMMITMENTS Environmental and Social  Implementing ESMS aligned with ISO 140001 and ISO 45001  Comprehensive review and update of project E&S documentation WAF NEWcommunity team meeting local farmers WATER WELLS during COVID-19 global pandemic  Growing our E&S depart

  17. Slide 17: Near-Term Catalysts

    NEAR-TERM CATALYSTS R A M P I N G U P TO WA R D S F U L L P R O D U C T I O N 2 0 2 1 Completed build and commissioning Q1 2020  Commenced underground ore development Q1 2020  Completed commissioning and first gold pour Q1 2020  Commenced deep drilling at M1 South Q2 2020  Commercial gold produc

  18. Slide 18: Why Invest

    WHY INVEST W E S T A F R I C A N R E S O U R C E S LT D A S X : WA F • Quality board and management team aligned with shareholders TEAM • Sanbrado built US$20m under budget and ahead of schedule ESG • Implementing ESMS aligned with ISO 140001 and ISO 45001 GOLD EXPOSURE • Unhedged +200koz per annum

  19. Slide 19: Mineral Resources and Reserves – Sanbrado

    MINERAL RESOURCES AND RESERVES SANBRADO Cutoff Indicated Resource Inferred Resource Total SANBRADO (Au g/t) Grade Grade Grade GOLD PROJECT MINERAL Tonnes Au Oz Tonnes (Au Au Oz Tonnes Au Oz (Au g/t) (Au g/t) RESOURCES g/t) April 2019 M1 South U/G >180mRL 3 1,000,000 21.9 697,000 300,000 11.2 117,000

  20. Slide 20: Mineral Resources and Reserves – Toega

    MINERAL RESOURCES AND RESERVES TO E G A Cutoff Indicated Resource Inferred Resource Total TOEGA (Au g/t) Grade Grade Grade GOLD PROJECT MINERAL Tonnes Au Oz Tonnes (Au Au Oz Tonnes Au Oz (Au g/t) (Au g/t) RESOURCES g/t) January 8, 2018 Toega O/P 0.6 17,530,000 2.01 1,130,000 17,530,000 2.01 1,130,00

  21. Slide 21: West African Resources Ltd

    WEST AFRICAN RESOURCES LTD W EST AF RICA’S NEW EST UNHE DG E D GOL D PRODU C E R w w w. w e s t a f r i c a n r e s o u r c e s . c o m A S X : WA F