Slide 1: 2019 Half-Year Results
August 2019 2019 Half-Year Results 01 October 2018
Slide 2: 2019 1H highlights
Highlights 2019 1H highlights Free cash flow generation ($m) 1. 400 Significant 300 debt 200 reduction $ >300 100 182 0 2019 1H 2019F 2. 3. 4. 5. Record 1H Zama Tolmount New licence production successfully on schedule, capture appraised below budget August 2019 P1
Slide 3: Delivery against 2019 targets
Highlights Delivery against 2019 targets Record 84.1 kboepd; very high Group operating efficiency Production Guidance of 75-80 kboepd reiterated Premier’s next growth project progressing under budget DELIVER Tolmount On schedule for first gas end 2020 Strengthening $182m free cash flow generation; 3
Slide 4: Strengthened commitment to ESG
Highlights Strengthened commitment to ESG Climate Change Examples of actions being taken to reduce future emissions Committee established Tolmount will be powered by a gas micro- Climate Change Policy turbine aligned with TCFD recommendations Solan will be gas powered following P3 completion
Slide 5: Financial priorities and highlights
Finance Financial priorities and highlights Priorities $121m 2019 1H net profit Continued debt reduction, targeting leverage ratio of 1.5x Maintain low cost base and capital discipline 43% of 2019 2H hedged at Fund selected projects without compromising balance sheet $69/bbl Protect downside
Slide 6: 2019 1H Financials
Finance 2019 1H Financials Higher Catcher production delivered a step up in operating cash flow and profits 2019 1H 2018 1H Realised pricing Production (kboepd) 84.1 76.2 2019 1H 2018 1H Operating cost/boe 10.3 11.3 Oil (pre hedge) ($/bbl) 67.4 66.5 Lease costs/boe 6.3 5.9 Oil (post hedge) ($/bbl) 6
Slide 7: Maintaining financial discipline and flexibility
Finance Maintaining financial discipline and flexibility Capital discipline Active hedging programme P&D expenditure focused on high return, Supported higher cash margins in 1H quick payback projects Protects debt reduction and capital investment Financing partnerships to reduce balance prog
Slide 8: Cash flow performance
Finance Cash flow performance Year end 2019 net debt is expected to be c. $2bn, representing: >$700 million – Accounting leverage ratio of 2x EBITDAX Expected debt – Covenant leverage ratio of 2.3x reduction 2018-191 – FCF yield of 48% – FCF/Net debt of 16% Substantial outperformance against 201
Slide 9: Strong 1H performance
Production Strong 1H performance Catcher (50% op) Huntington (100% op) Elgin Franklin (5.2% non-op) 35.1 kboepd (net) 6.8 kboepd (net) 6.5 kboepd (net) 99% operating efficiency Scale squeeze Interventions, infills Plateau extended to 2021 Power Buoy installed Field life extended to
Slide 10: Top tier operating efficiency
Production Top tier operating efficiency UK operating efficiency UKCS operating efficiency trend % UKCS operating efficiency 95 improved for sixth PMO UK OE consecutive year 71 73 74 75 64 65 PMO 3 year average (2016-2018) 80% 60 compared to UKCS of 74% PMO 2019 1H UK operating efficiency of 9
Slide 11: Incremental investments generating $650m NPV
Production Incremental investments generating $650m NPV Approved investments Converting resources Asset Activity Timing into the production Elgin Franklin Infill programme Ongoing base Chim Sáo Well intervention campaign 2019 Ravenspurn North 2 Infill wells 2019/20 Solan Third development well (P3
Slide 12: Delivers a new base profile
Production Delivers a new base profile Investment characteristics – Low cost, rapid payback projects (typically less than 1 year) – High return on capital (IRR>20%) – Robust at low oil prices Maintains production at 75-80 kboepd out to 2024 Indicative production profile Growth projects Awaiting
Slide 13: Tolmount – on track
Development Tolmount – on track Gross Gross resource Net Capex Payback Peak Production 500 Bcf $120 m <1 year 58 kboepd Tolmount: Premier’s next UK growth project kboepd (net, Premier 50% op.) Tolmount Tolmount East 20 0 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Platform construction Pi
Slide 14: Tolmount East – drilling ahead
Development Tolmount East – drilling ahead Spudded 8 August; results expected Targeting up to October 2019 300 Bcf gross Testing extension to Tolmount structural closure above gas water contact On success, tied back to Tolmount for first gas in 2023 – Benefits from low tariff structure – Quick
Slide 15: Block 7 Zama oil field successfully appraised
Development Block 7 Zama oil field successfully appraised Sales process underway for Premier’s 25% interest in Block 7 – Highly-marketable asset – Materially strengthens balance sheet Optimal time to monetise – Appraisal campaign completed – Significant resource upgrade P50-P10 resource (gross)
Slide 16: Disciplined approach to exploration and appraisal
Exploration Disciplined approach to exploration and appraisal 650 mmboe of net prospective unrisked resource to be drilled in the next three years Target under-explored, emerging plays in proven hydrocarbon provinces Alaska – Expanded South Andaman Sea position – Successful entry into the Alaska N
Slide 17: Material acreage position in Mexico beyond Block 7
Exploration Material acreage position in Mexico beyond Block 7 Block 30 (Sureste Basin) (Premier 30%, non op) Block-wide 3D seismic survey completed Wahoo flat spot similar to Zama Drilling activity targeted for end 2020/early 2021 Significant follow on potential Blocks 11 & 13 (Burgos Basin
Slide 18: Andaman Sea: low cost entry, new regional play
Exploration Andaman Sea: low cost entry, new regional play Expanded position in the South Andaman Sea Multi-TCF gas play gross potential – Low upfront costs – No well commitments 3D survey completed; encouraging initial results – Prospectivity of DHIs on 2D seismic confirmed – Further upside ide
Slide 19: Alaska: prolific super basin, renewed industry interest
Exploration Alaska: prolific super basin, renewed industry interest Cost effective entry into an emerging play in a proven oil province Alaska North Slope Historical focus has been on the deeper Jurassic/Triassic Ellesmerian Play Under-explored conventional Cretaceous Brookian play unlocked thro
Slide 20: Area A, Alaska North Slope
Exploration Area A, Alaska North Slope Malguk-1 discovery (1991) Jurassic/Triassic target 251 feet of conventional light oil pay >1bn bbls STOIIP found in the Torok sandstones in the shallower Brookian Play but not flow tested Appraisal well (Q1 2020) Test reservoir deliverability of Torok san
Slide 21: Sea Lion – the opportunity
Development Sea Lion – the opportunity World scale development Conventional new build FPSO/subsea development – Substantially de-risked – Best available technology Tier 1 supply chain in place – Value engineering complete – Vendor funding agreed Project optimised – Reserves increased to 250
Slide 22: Key takeaways and 2H outlook
Summary Key takeaways and 2H outlook Key takeaways • Strong positive free cash flow driving debt reduction • Much improved credit metrics, in line with peers • Multiple opportunities for low cost investment in producing assets • Portfolio management to crystallise development asset value • Building
Slide 23: August 2019
August 2019 www.premier-oil.com Premier Oil Plc 23 Lower Belgrave Street London SW1W 0NR T: +44 (0)20 7730 1111 E: premier@premier-oil.com