International Graphite Limited · ASX:IG6

International Graphite — 121 Investor Conference London 2026

20 slides from International Graphite's conference presentation, May 2026

  1. Slide 1: High-performance graphite for advanced manufacturing

    High-performance graphite for advanced manufacturing 121 Investor Conference – London May 2026

  2. Slide 2: Two world class processing facilities

    Two world class processing facilities Meeting demand for a new supply of advanced materials in profitable markets Two downstream graphite process plants operating and generating revenue by 2027:  Italy Porto Marghera Graphite Hub Construction ready  Australia Collie Graphite Hub Construction under

  3. Slide 3: High performance industrial products

    High performance industrial products The fastest road to revenue in today’s graphite market p3

  4. Slide 4: Joining forces with an industry leader

    Joining forces with an industry leader To establish the premier graphite processing hub in Europe Our partner Alkeemia SpA is a major European chemical producer and manufacturer of hydrofluoric acid (HF), the only commercially proven reagent for high value graphite purification. Alkeemia has recentl

  5. Slide 5: Porto Marghera Graphite JV

    Porto Marghera Graphite JV Partnering with an industry leader cuts cost, risk and time to market p5

  6. Slide 6: Strategic location at Porto Marghera

    Strategic location at Porto Marghera A permitted and serviced site in one of Italy’s biggest industrial hubs p6

  7. Slide 7: Why this JV works

    Why this JV works Built-in advantages that no greenfields project can match  Construction ready: Permitted chemical manufacturing  Established industrial infrastructure: Reduced capital site and advanced design compress construction time intensity through shared use of existing facilities, service

  8. Slide 8: Onsite purification for JV products

    Onsite purification for JV products Alkeemia’s planned capacity is exclusive to the Porto Marghera hub  Separate LOI in place for Alkeemia to provide toll purification services*  Initial plant throughput 200t/y ramping up to 20,000t/y by 2030  IG6 allocated up to 50% of plant’s start-up capacity

  9. Slide 9: Building on IG6 expertise

    Building on IG6 expertise Collie Graphite Hub, Western Australia  Six years of downstream development experience from R&D to qualification-scale  1,216 kg of concentrate processed into  micronised and spheroidised product  Thousands of feasibility hours invested in upstream and downstream facili

  10. Slide 10: Collie Micronising Facility, WA

    Collie Micronising Facility, WA Commercial processing plant sets a new Australian benchmark p10

  11. Slide 11: Collie Micronising Facility

    Collie Micronising Facility In construction. Operating revenue from 2027 FUNDING Capital cost to mechanical completion (including contingency) $8.0M Sources of Funds Spend to 30 April 2026 $1.4M WA Govt Collie Industrial Transition Fund $3.5M Forecast R&D rebates $1.5M Construction finance being sou

  12. Slide 12: Graphite concentrate feedstock

    Graphite concentrate feedstock Consistent forecast growth in supply and availability at current spot prices GROWTH IN PROD UC T ION OF NATU R AL F LAKE GR APH ITE GR APH ITE C ONC ENT RAT E SPOT PR ICE PRODUCTION CONSUMPTION SOURCES NON CHINA Source: IEA Commodities Outlook 2024, independent researc

  13. Slide 13: Graphite demand today

    Graphite demand today Industrial products are profitable while anode demand will grow Industrial demand is growing  Graphite demand expected to reach CAGR of 12% by 2040 Thousands of Metric Tonnes  Industrial graphite demand forecast to grow at CAGR of 3-5%  Battery anode demand, driven by EV and

  14. Slide 14: Springdale, Western Australia

    Springdale, Western Australia A globally significant graphite deposit – 100% owned CAPEX Concentrate Output A$76M 46,000 t/y High Grade Quality Mineral Battery grade Resource 99.95% purity 28Mt@9%TGC Multi decade Low Opex mine life With huge US$450 – 485/t exploration potential p14

  15. Slide 15: Springdale metallurgical performance

    Springdale metallurgical performance Concentrate suitable for high value applications x  Bulk flotation ~115 kg of Springdale concentrates from drill core returned an average grade of 94.7% TGC  Micronising and spheroidising (milling) testwork to date has resulted in two spheroidised products with

  16. Slide 16: The right people and partners

    The right people and partners Expert team and world leading graphite industry partners give us the edge Phil Hearse Andrew Worland CHAIRMAN AND FOUNDER MANAGING DIRECTOR AND CEO  Metallurgical engineer  Corporate finance  50 years of minerals processing  30 years of mining, trading and executive

  17. Slide 17: Focus on execution and delivery

    Focus on execution and delivery Low risk strategy primed for success Permitting. Feedstock. Processing Construction. Minimal for building Abundant mine sources. technology. Basic construction and construction. Waste Commodity trader supply Proven processes. standard equipment. management through agr

  18. Slide 18: Investment highlights

    Investment highlights Meeting the demand for advanced materials in profitable markets Focused on project execution and delivery Graphite Immediate World class Access to IP Pathway consumers production – joint venture – and expertise to anode want new, two plants Alkeemia JV partnering with through i

  19. Slide 19: About this document

    ABOUT THIS DOCUMENT: This document has been prepared by International Graphite Limited (the "Company” or “International Graphite”). No representation, expressed or implied, or warranty as to the accuracy or completeness of the information contained herein is made by any party and nothing contained h

  20. Slide 20: International Graphite Limited

    INTERNATIONAL GRAPHITE Limited Andrew Worland Aidan Nania Managing Director / CEO Executive Director aworland@ig6.com.au anania@ig6.com.au

International Graphite — 121 Investor Conference London 2026 on 6ix