Bf Utilities Ltd. · NSE:BFUTILITIE
Bf Utilities — Investor Presentation (March 2010)
24 slides from Bf Utilities's investor presentation, March 2010
Slide 1: BF Utilities
$SULO
Slide 2: Disclaimer
Disclaimer The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments. This presentation contains forward-looking statements. Forward-looking statements in this presentation are subject to number of risks and uncertain
Slide 3: BF Utilities: Overview
BF Utilities : Overview 3
Slide 4: Overview of the Kalyani Group
Overview of the Kalyani Group Kalyani Group is one of the leading industrial houses in India, focusing on the following sectors: Engineering Steel Automotive & Non-Automotive Components Renewable Energy & Infrastructure and Specialty Chemicals Bharat Forge Limited, the flagship company of the group,
Slide 5: BF Utilities: Snapshot of Key Projects
BF Utilities: Snapshot of Key Projects BF Utilities Limited Bangalore Mysore Infrastructure Corridor (BMIC) Project Hubli - Dharwad Road Project Sole manager to execute the BMIC project 30km bypass road connecting the twin cities of Hubli and One of the largest integrated infrastructure development
Slide 6: Corporate Structure
Corporate Structure BF Utilities* (Market Cap - $768MM)** 100% 74.5% 69.53% NHDL Wind Mill NICE (Hubli-Dharwad (18.33MW) Bypass) 64.8% 100% 100% NECE Part of Section A, Various Utilities (Part of Section A) Section B & C Power Water Telecom Road & Expressway & Five Townships Bundled Utilities Interc
Slide 7: BMIC Overview
BF UTILITIES LIMITED
Slide 8: World Class Infrastructure Project
World Class Infrastructure Project Nandi Infrastructure Corridor Enterprise Ltd. (NICE) is implementing the Bangalore Mysore Infrastructure Corridor (BMIC) Project, a world class integrated infrastructure development project, which consists of : A 164 km tolled expressway connecting Bangalore and My
Slide 9: Close Proximity to Bangalore
Close Proximity to Bangalore With Bangalore’s population approaching 8.5 million, it is believed that implementation of the BMIC Project holds the key to addressing the infrastructure problems of the city. Growth Patterns in Bangalore BMIC Project Location Overview Devanahalli Towards Devanahalli He
Slide 10: Section – A Infrastructure Development Nearly Complete
Section – A Infrastructure Development Nearly Complete Project Overview The project entails development of 62 km of Toll Road and one Township near Bidadi 9.1km Link Road linking city centre to Outer Peripheral Road 41km Outer Peripheral Road linking Hosur Road to Tumkur Road 12km Expressway up to B
Slide 11: Significant Value in Section B and C
Significant Value in Section B and C The project entails development of 99 km of Toll road, four self- Project Overview sustained townships and 3 kms of Elevated road at Bangalore Side Expressway from Bidadi to Mysore Development of up to 400MW of power plants with exclusive right to transmit and di
Slide 12: Superior Toll Road Specifications and Planning
Superior Toll Road Specifications and Planning Superior specifications / planning with room for Current Toll Collection (Rs. Million) revenue upside 40 36.5 34.8 35 31.0 32.0 Major expenses on the toll road already incurred 30 26.9 27.8 28.5 26.3 25.5 25.3 25 22.6 Stable income from toll linked with
Slide 13: Townships: Significant Value Creation Potential
Townships: Significant Value Creation Potential Large contiguous and well connected land bank available in a Tier 1 city in India Township to serve demographic needs of the area, provide decongested living experience Infrastructure first, development later model Unlike SEZs where the land is leased
Slide 14: Other Key Assets
BF UTILITIES LIMITED
Slide 15: Hubli-Dharwad Bypass Road
Hubli-Dharwad Bypass Road Project 30km bypass road connecting the twin cities of Overview Hubli and Dharwad in North Karnataka to Dharwad End Dharwad Goa Toll Plaza avoid city traffic and congestion Crossing End 1 Located right in the middle of the Pune- Toll Plaza 2 Bangalore stretch (835km) of the
Slide 16: Wind Energy Farm
Wind Energy Farm 18.33 MW wind farm spread over an expanse of 300 acres at Thosegar in Satara district, Maharashtra Power generated utilized by Bharat Forge Ltd. at its Pune plant Consists of 51 wind energy generators (WEGs) of 230KW and 11 WEGs of 600KW Out of the total capacity, 14.65MW of eligibl
Slide 17: Appendix
Appendix 17
Slide 18: BF Utilities: Overview of Toll Road Assets
BF Utilities: Overview of Toll Road Assets Toll Road Assets Section Kms Current Status Company Link Road 9.1 Completed NECE Peripheral Road 41.0 Nearly completed NECE Expressway till Bidadi 12.0 Under construction NECE Expressway from Bidadi to Mysore 102.1 To start in Oct / Dec 2010 NICE (incl. ele
Slide 19: NECE Overview
NECE Overview 19 BF Utilities Limited
Slide 20: NECE Location Map
NECE Location Map 20 BF Utilities Limited
Slide 21: NECE Toll Road Specifications and Planning
NECE Toll Road Specifications and Planning Total length of the road – 62km; total project cost – Rs 20.4 billion. Cost/Km is high compared to a typical highway project due to International quality standards followed for the road construction; and The Resettlement & Rehabilitation (R&R) package costs
Slide 22: NECE Toll Rates Summary
NECE Toll Rates Summary Government Sanctioned Rates (As per Toll Agreement, for the Year 2010) Section km Car Bus Truck LCV MAV 2W Hosur Road-Bannerghata Road 7.9 25 67 44 26 47 10 Bannerghata Road-Kanakapura Road 6.8 21 58 37 22 40 9 Kanakapura Road - Mysore Road 8.2 26 70 45 27 49 10 Mysore Road-M
Slide 23: Actual Photos of BMIC Project
Actual Photos of BMIC Project 23 BF Utilities Limited
Slide 24: Thank You
Thank You 24