Pennon Group PLC · LSE:PNN

Pennon — Investor Presentation (September 2013)

73 slides from Pennon's investor presentation, September 2013

  1. Slide 1: Group Overview September 2013

    Group Overview September 2013

  2. Slide 2: Disclaimers

    Pennon Group Plc (“Pennon Group”) Disclaimers For the purposes of the following disclaimers, references to this "document" shall mean this presentation pack and shall be deemed to include references to the related speeches made by or to be made by the presenters, any questions and answers in relatio

  3. Slide 3: Pennon Group Plc Overview

    Pennon Group Plc Overview Who we are • Pennon Group Plc is an environmental utility infrastructure company at the top end of the FTSE 250 which owns South West Water Limited and Viridor Limited. The Group has assets of around £4.7 billion and a workforce of over 4,500 people Group Strategy • Our str

  4. Slide 4: Investment Characteristics

    Pennon Group Plc Investment Characteristics • Top end of FTSE 250 • Clearly focussed strategy • Steady growth with exposure to resource/cyclical upswings • Index-linked asset base • Defensive • Strong SRI credentials • Top ranked Utility in “Britain‟s Most Admired Companies”(1) awards in 3 areas - Q

  5. Slide 5: Notable SRI Achievements

    Pennon Group Plc Notable SRI Achievements • Member of FTSE4Good and FTSE Environmental Opportunities Index Series (responsible investment indices) • In top 12% of EA‟s Carbon Reduction Commitment (CRC) League Table • Member of 2012 Global 100, one of the one hundred most sustainable companies in the

  6. Slide 6: Summary Financial Results

    Pennon Group Plc Summary Financial Results 2012/13 2011/12 Change £m £m Group revenue 1,201.1 1,233.1 (2.6%) Group operating profit (1) 246.3 268.8 (8.4%) - SWW 215.2 204.7 5.1% - Viridor 30.8 63.7 (51.6%) Viridor PBIT plus joint ventures(1) 45.9 75.2 (39.0%) Group profit before tax(1) 198.2 200.5 (

  7. Slide 7: Exceptional Items

    Pennon Group Plc Exceptional Items 2012/13 2011/12 £m £m Operating costs Impairment of property, plant and equipment (78.2) - Environmental and landfill restoration provisions (90.1) - Onerous contracts and other (20.6) - (188.9) - Net finance income 12.5 - Charge before tax (176.4) - Tax credit 36.

  8. Slide 8: Cash Flow

    Pennon Group Plc Cash Flow 2012/13 2011/12 £m £m Cash inflow from operations 384.6 389.9 Net interest paid (49.8) (61.3) Dividends paid (77.9) (69.1) Tax paid (18.5) (41.4) Capital expenditure(1) (421.8) (273.6) Acquisitions and investment in joint ventures (14.3) (42.6) Loan repayments and dividend

  9. Slide 9: Net Borrowings

    Pennon Group Plc Net Borrowings As at 31 March 2013 2012 £m £m Loans and finance leases - over one year 2,505 2,204 - under one year 139 326 2,644 2,530 Less: cash and cash deposits (635) (425) Net borrowings 2,009 2,105 Net gearing(1) 65.4% 71.9% SWW debt/RCV 54.9% 56.1% ► Gearing reduced ► Net bor

  10. Slide 10: Viridor EfW Capex – Impact on Net Debt

    Pennon Group Plc Viridor EfW Capex(1) – Impact on Net Debt Cumulative Remaining spend Total spend to to project project 31 March 2013 completion spend EfW projects under construction £m £m £m Runcorn II 149 67 216 Oxford (Ardley) 106 104 210 Exeter 35 12 47 Cardiff 119 104 223 Glasgow 11 144 155 420

  11. Slide 11: Net Interest Analysis

    Pennon Group Plc Net Interest Analysis(1) 2012/13 2011/12 £m £m Interest payable (85.2) (94.3) Capitalised interest payable (13.6) (3.0) Interest receivable on shareholder loans to joint ventures 9.3 7.5 Other interest receivable 16.6 11.9 Net interest payable (72.9) (77.9) Average rate of interest

  12. Slide 12: Efficient Financing Strategy

    Pennon Group Plc Efficient Financing Strategy • Mix of fixed, floating and index-linked rate borrowings locks in benefit of low interest rates versus OFWAT assumptions c24% of SWW current debt index-linked to 2041-2057 • At least 50% of SWW net debt fixed for K5 in line with Group policy weighted av

  13. Slide 13: Liquidity

    Pennon Group Plc Liquidity • Total of £1,150m cash/committed facilities at 31 March 2013 cash balances of £635m (includes c£143m deposits with Letter of Credit providers and lessors) undrawn facilities of £515m • Committed funding in place for South West Water up to end of K5 £156m will mature over

  14. Slide 14: Taxation

    Pennon Group Plc Taxation(1) 2012/13 2011/12 £m £m Current tax 43.3 30.9 Deferred tax 1.4 23.6 Deferred tax reduction on change of (13.6) (26.4) corporation tax rate 31.1 28.1 ► Current tax charge 22% (2011/12 - 15%) ► 2011/12 current tax charge reflected substantial accelerated pension deficit cont

  15. Slide 15: Dividends

    Pennon Group Plc Dividends • Final dividend up 7.7% to 19.70p • Full year dividend up 7.3% to 28.46p, reflecting annual RPI of 3.3% to 31 March 2013 • Sector-leading progressive dividend policy: 4% real increase to end of K5 period (March 2015) • Scrip dividend alternative 15

  16. Slide 16: South West Water

    aT —""["i rrr SOUTH WEST WATER Delivering PureWater PureService and a PureEnvironment 16

  17. Slide 17: South West Water Regional Context

    South West Water Regional Context 17

  18. Slide 18: Key Business Statistics

    South West Water Key Business Statistics • 1.68m resident population; 10m annual visitors • Water and sewerage undertaker serving a region of nearly 10,300 km2 • 15,200 km of water distribution mains; 15,600 km of sewers • 29 drinking water treatment works; 641 waste water treatment works • 75% dome

  19. Slide 19: South West Water Environmental Context

    South West Water Environmental Context 19

  20. Slide 20: Stakeholders and Regulators

    South West Water Stakeholders and Regulators Customers Quality Regulators Economic Regulators • Environment Agency (EA) • Water Services Regulation Authority • Drinking Water (OFWAT) South West Water Inspectorate (DWI) • Competition • Department of Commission Environment, Food and Rural Affairs (DEF

  21. Slide 21: Financial Performance Summary

    South West Water Financial Performance Summary 2012/13 2011/12 Change £m £m Revenue 498.6 474.0 5.2% Operating profit 215.2 204.7 5.1% Profit before tax(1) 152.1 141.5 7.5% (1) Before exceptional items 21

  22. Slide 22: Revenue

    South West Water Revenue 520.0 1.5 0.9 (8.1) 38.1 (7.8) 498.6 500.0 480.0 474.0 £m 460.0 440.0 420.0 400.0 Mar-12 Tariff increase New connections Other Demand Meter option Mar-13 switchers ► Tariff increase of 7.7% (inc RPI) ► 2.9% reduction in metered customer demand – impacted by wet weather ► 75%

  23. Slide 23: Operating Costs

    South West Water Operating Costs 300.0 1.3 0.8 (3.5) 1.5 290.0 2.8 (2.0) 3.9 283.4 9.3 280.0 269.3 270.0 £m 260.0 250.0 240.0 230.0 220.0 Opex transfers Private Sewers Efficiency Mar-12 Mar-13 Cost increases Bad debts Restructuring non-recurring & Depreciation & (inc. inflation savings cost of sales

  24. Slide 24: Operating Cost Efficiency

    South West Water Operating Cost Efficiency • Good operational cost control • Delivering efficiency ahead of FD assumptions K5 CUMULATIVE OPERATING COST EFFICIENCIES TO MARCH 2013 • Cumulative K5 efficiency of £18.6m – over 70% of required efficiency delivered Energy Admin and K5 to date support equi

  25. Slide 25: Capital Programme

    South West Water Capital Programme • Maintenance focused investment programme K5 CUMULATIVE CAPITAL EXPENDITURE TO MARCH 2013 • Expenditure £116.5m (2011/12 £130.8m) Enhanced focus on compliance and reliability Service Levels Supply & Quality K5 to date Demand PUROS enabling K5 to date £19m K5 to da

  26. Slide 26: Shareholder Value

    South West Water Shareholder Value 3100 3000 2900 2800 RCV £m 2700 RCV(1) 2600 2500 2400 2300 2010 2011 2012 2013 2014 2015 • RCV of £2,916m at 31 March 2013 • Debt/RCV gearing 55% – growth in RCV exceeding the growth in net borrowings (1) Outturn prices for K5 based on forecast RPI (3.0% 2013/14 an

  27. Slide 27: Operational Highlights: Delivering the Regulatory Contract - I

    South West Water Operational Highlights: Delivering the Regulatory Contract - I • Outstanding drinking water quality maintained – 99.97%(1) • 16th consecutive year without water restrictions (17th forecast for 2013/14) • Leakage target achieved target met every year since introduction • Customer Ser

  28. Slide 28: Operational Highlights: Delivering the Regulatory Contract - II

    South West Water Operational Highlights: Delivering the Regulatory Contract - II • Best ever waste water treatment compliance follows targeted investment in 98 sites over past 18 months • Pollution control extreme weather key factor increased minor incidents significant reduction in serious incident

  29. Slide 29: 2012/13 Ofwat KPI performance

    South West Water 2012/13 Ofwat KPI performance • Water Pollution incidents Cat 1-3 • Waste Water Treatment numeric compliance Improved • Total Leakage Ml/d • Supply interruptions • Security of supply Water • Serviceability pollution incidents index Cat 1-3 measures (x4) • Greenhouse gas emissions ST

  30. Slide 30: Political and Regulatory Developments - I

    South West Water Political and Regulatory Developments - I • Government support for household customer bills welcomed £50 annual domestic bill reduction average bill reduced by 7.4% no impact on SWW financial/regulatory position • Draft Water Bill measured pace of change facilitating market reform a

  31. Slide 31: Political and Regulatory Developments - II

    South West Water Political and Regulatory Developments - II Preparing for PR14 - I • New process • Risk-based approach • Ofwat Chairman‟s lecture 5th March 2013 at Royal Academy of Engineering governance, transparency, sharing outperformance • „WaterFuture‟ Customer Challenge Panel established 18 mo

  32. Slide 32: Political and Regulatory Developments - III

    South West Water Political and Regulatory Developments - III Preparing for PR14 – II • Excellent governance & transparency • Track record of efficiency re-investment in previous K periods • Sharing outperformance with customers & accelerating capital expenditure • Investing c£60m improving services

  33. Slide 33: Political and Regulatory Developments - IV

    South West Water Political and Regulatory Developments - IV Key investment drivers for PR14 • Tougher bathing water and shellfish water regulations • Resilience against extreme weather – networks and treatment facilities • Enhanced capital maintenance • Flood and pollution prevention – catchment-bas

  34. Slide 34: PR14 Timetable

    South West Water PR14 Timetable 2012 2013 2014 Winter Spring Summer Autumn Winter Spring Summer Autumn Winter CONSULTATION Distribution and DELIVERY promotion of 25-year vision Draft Plan for ASSESSMENT (Ofwat) customer consultation Business DRAFT FINAL Plan DETERMINATION DETERMINATION Submission Pu

  35. Slide 35: South West Water Summary

    South West Water Summary • Focus on efficient service delivery • Operational and financial performance remains strong • Well prepared for PR14 and legislative changes Successful and robust operational strategy underpinned by strong financial performance 35

  36. Slide 36: Transforming waste

    Viridor Transforming waste”

  37. Slide 37: Viridor Strategy: Transforming Waste

    Viridor Strategy Transforming Waste • Viridor‟s strategy is to transform waste, adding value through recycling and renewable energy generation • From 2007/08 until first half 2011/12 fast growth in recycling profits more than offset decline in annual landfill profits • As noted previously recyclate

  38. Slide 38: External Context

    Viridor External Context • Current weakness in UK and world economy exacerbating long term sector trends pressures on local authority and other customers to reduce costs • Landfill market declining long term being replaced by recycling and by EfW as capacity becomes available • Recycling market in U

  39. Slide 39: UK Waste Market Projections

    Viridor UK Waste Market Projections (Tonnes m) 2010/11 2015/16 2020/21 Total Market Viridor Total Market Total Market Landfill 43 4.7 20 5 Energy from Waste 6 0.3 10 20 Recycling(1) 28 1.8 35 35 Total 77 6.8 65 60 Source: DEFRA; UK Landfill Tax Bulletin; Viridor analysis and estimates ► Viridor and

  40. Slide 40: Viridor Financial Performance Summary

    Viridor Financial Performance Summary(1) 2012/13 2011/12 Change £m £m % Revenue(2) 703.8 761.1 (7.5) EBITDA 77.9 110.3 (29.4) PBIT 30.8 63.7 (51.6) PBIT plus joint ventures(3) 45.9 75.2 (39.0) PBT 36.5 57.6 (36.6) (1) Excluding exceptional charges (2) Including landfill tax (3) Interest receivable o

  41. Slide 41: Financial Highlights

    Viridor Financial Highlights(1) • Revenue decreased by £57.3m (7.5%) to £703.8m recycling and landfill • EBITDA decreased by £32.4m (29.4%) to £77.9m • PBIT plus joint ventures decreased by £29.3m (39.0%) to £45.9m increased contribution from joint ventures with contracts stable more than offset by

  42. Slide 42: Exceptional Charges

    Viridor Exceptional Charges • In response to ongoing landfill trends and its own EfW development programme (including EfW plants at its Ardley, Beddington and Dunbar landfills) Viridor has reviewed its long term site lives post 2020 Viridor is expected to have a network of 3 strategically located la

  43. Slide 43: Profit Contribution by Activity

    Viridor Profit Contribution by Activity(1) 2012/13 2011/12 £m £m Recycling 10.7 33.0 Landfill 19.0 22.8 Landfill gas power generation 23.8 25.3 Joint ventures 15.1 11.5 Contracts and other 25.2 25.3 Collection 4.3 7.4 Total contribution 98.1 125.3 Indirect costs (including pensions, insurance, bid c

  44. Slide 44: Operational Highlights - Recycling

    Viridor Operational Highlights - Recycling • Average revenue per tonne £99 significantly down on last year‟s figure of £118 impacted by last year‟s strong first half (£36m impact) prices have recovered a little from their lows of October to December 2012 • Annual volumes increased slightly to 1.9m t

  45. Slide 45: Recyclate Revenues Per Tonne

    Viridor Recyclate Revenues Per Tonne Weighted Average(1) 140 • Viridor strategy is to maximise 120 recyclate quality and hence 100 revenue and margin per tonne but not immune to world £ PER TONNE 80 market conditions 60 • Key sensitivity: £10 per tonne 40 change in revenue per tonne on c2m tonnes pa

  46. Slide 46: Operational Highlights - Landfill

    Viridor Operational Highlights - Landfill • Volumes down 397kt (12.7%) to 2,717kt in line with the market • Average gate fees up 8.1% to £25.34 per tonne • Landfill tax increased to £72 per tonne (passed through to customer) rises to £80 per tonne April 2014 • Costs up 8.1% to £20.26 per tonne impac

  47. Slide 47: Operational Highlights - Landfill Gas Power Generation

    Viridor Operational Highlights - Landfill Gas Power Generation • Volumes up 7.3% to 618GWh (576GWh last year) reflecting intensive management focus at peak • Average prices fell slightly reflecting lower ROBOR(1) long term upward trend in brown energy prices • Average costs up 10.5% to £43.74 per MW

  48. Slide 48: Operational Highlights – Joint Ventures

    Viridor Operational Highlights – Joint Ventures • JVs‟ contribution (interest receivable on shareholder loans and share of PAT) increased 31% to £15.1m (2011/12 - £11.5m) Lakeside • The first of our EfW projects continues to perform very strongly • Contribution of £7.2m (2011/12 £5.1m) reflecting co

  49. Slide 49: Operational Highlights – Contracts and Collection

    Viridor Operational Highlights – Contracts and Collection • Contracts 16 municipal contracts around the UK (including Lancashire, Glasgow, Lakeside, Manchester, Somerset, W Sussex PFI and (last full year) Bedfordshire) Thames Water overall profit contribution stable • Collection profit contribution

  50. Slide 50: Progress on PPP/EfW 2012/13

    Viridor Progress on PPP/EfW 2012/13 • Financial close achieved for the Glasgow Design Build Finance Operate project (July 2012); planning application for the associated Recycling and Renewable Energy Centre approved (January 2013) • Financial close achieved for the South London Waste Partnership PPP

  51. Slide 51: Overview of current and pipeline Energy from Waste facilities

    Viridor Overview of current and pipeline Energy from Waste facilities

  52. Slide 52: EfW Plants

    Viridor EfW Plants Site Capital Gross Capacity Status Base Load Expected Start of Operations End (2) Cost (1) Municipal Contract Commissioning Tonnes Electricity (000) MW Lakeside( 3) 150 410 37 Operational Merchant May 2010 2033 Bolton N/A 120 9 Operational Gt M‟chester 2001 2034 Runcorn I(3) 236 3

  53. Slide 53: Projected UK EfW Capacity

    Viridor Projected UK EfW Capacity 30 30 Tonnes (m) 14 6 3.2 0 2010 2020 All current 2020 likely 2020 Viridor including proposals joint ventures • Above figures are theoretical capacity • Likely capacity takes account of available base load municipal contracts (necessary for financing) and actual/exp

  54. Slide 54: Viridor 2012/13 Summary

    Viridor 2012/13 Summary • PBIT plus joint ventures down 39.0% continued growth in joint ventures outweighed by decline in recycling and landfill • Exceptional costs primarily reflecting updated assessment of landfill site lives and provisions • Recyclate prices have fallen from their first half 2011

  55. Slide 55: Pennon Group Plc

    PENNON GROUP PLC

  56. Slide 56: Pennon Group Plc Summary

    Pennon Group Plc Summary • Strategy clearly focused on: water and sewerage services recycling, renewable energy and waste management • £439m invested in key infrastructure supporting the development of the UK economy • South West Water focus on efficient service delivery operational and financial pe

  57. Slide 57: Appendices

    PENNON GROUP PLC Appendices

  58. Slide 58: Net Borrowings Analysis as at March 2013

    Pennon Group Plc Net Borrowings Analysis as at 31 March 2013 £m Finance leasing 1,263 Bank bilaterals - RCFs/term loans 485 EIB 232 Index-linked bond 2057 247 Bond 2040 132 Private placements 163 Convertible bond 120 Unsecured loan notes 1 Other 1 Total gross debt 2,644 Less: Cash/liquid investments

  59. Slide 59: Fair Value non-current Borrowings

    Pennon Group Plc Fair Value non-current Borrowings As at 31 March 2013 As at 31 March 2012 Book Fair Diff Book Fair Diff Value Value £m Value Value £m £m £m £m £m Finance Leases 1,221.7 1,053.3 168.4 1,243.5 1,088.1 155.4 Bank and other loans 410.0 410.0 0.0 139.3 139.3 0.0 Private Placement 162.3 1

  60. Slide 60: Pensions as at March 2013

    Pennon Group Plc Pensions as at 31 March 2013 • Gross pension deficit of £110m (March 2012 - £99m) £85m net of tax (March 2012 - £75m) March 2013 March 2012 • Pension schemes‟ assets £580m £517m Pension schemes‟ liabilities £690m £616m £110m = £85m net of tax £99m = £75m net of tax ► Market volatili

  61. Slide 61: Ofwat PR14 process timeline

    ASE PHASE 2: PHASE 3: Clarification Restricted Communications Risk-based Review Categorisation Financial model Conduct risk based review Results of risk-based Produce final determinations | Publish final published t review announced | determinations (mid-end Sep) (4 Apr) PD @ (by 12 Dec) Exploring b

  62. Slide 62: Lakeside EfW - Summary

    Viridor Lakeside EfW - Summary • Waste capacity and supply: 410kt (all merchant). Supply split between Viridor, Grundon and Lakeside • Energy: 37MWe • Capital expenditure: £150m • Build profile: Start – November 2005. End – May 2010 (Expected 36 months, actual 54 months) • Operating life: 25 years •

  63. Slide 63: Bolton EfW - Summary

    Viridor Bolton EfW - Summary • Waste capacity and supply: 120kt (all supplied via the Greater Manchester PFI) • Energy: 9MWe • Capital expenditure: n/a • Build profile: As an incinerator: start – 1970s, end – 1970s. Energy recovery: start – 1998, end – 2001 • Operating life: 2034 concession ends • C

  64. Slide 64: Runcorn I EfW - Summary

    Viridor Runcorn I EfW - Summary • Waste capacity and supply: 375kt (up to 325kt from GM PFI, remainder merchant) • Energy: 28MWe and 51MWth • Capital expenditure: £236m • Build profile: Start – April 2009. Expected start of commissioning: H2 2013/14 • Operating life: 25 years • Construction contract

  65. Slide 65: Runcorn II EfW - Summary

    Viridor Runcorn II EfW - Summary • Waste capacity and supply: 375kt (all merchant) • Energy: 42MWe • Capital expenditure: £216m • Build profile: Start – September 2010. Expected start of commissioning: H2 2014/15 • Operating life: 25 years • Construction contractor: Keppel Seghers • Operating contra

  66. Slide 66: Exeter EfW - Summary

    Viridor Exeter EfW - Summary • Waste capacity and supply: 60kt (all contracted with Devon County Council) • Energy: 3MWe • Capital expenditure: £47m • Build profile: Start – October 2011. Expected start of commissioning: H1 2014/15 • Operating life: 30 year concession • Construction contractor: TIRU

  67. Slide 67: Ardley EfW - Summary

    Viridor Ardley EfW - Summary • Waste capacity and supply: 300kt (c150kt contracted for 25 years with Oxfordshire County Council via Oxfordshire PPP) • Energy: 24 MWe • Capital expenditure: £210m • Build profile: Start date - December 2011. Expected start of commissioning: H1 2014/15 • Operating life

  68. Slide 68: Cardiff (Trident Park) EfW - Summary

    Viridor Cardiff (Trident Park) EfW - Summary • Waste capacity and supply: 350kt (170kt preferred bidder Prosiect Gwyrrd) • Energy: 28MWe • Capital expenditure: £223m • Build profile: Start – 2012. Expected start of commissioning: H2 2014/15 • Operating life: 25 years • Construction contractor: CNIM/

  69. Slide 69: Glasgow Recycling & Renewable Energy Centre - Summary

    Viridor Glasgow Recycling & Renewable Energy Centre (GRREC) - Summary • Waste capacity and supply: 200kt (Up to 200kt contracted with 175kt guaranteed minimum from Glasgow City Council) • Energy: 15MWe • Capital expenditure: £155m • Build profile: Start – May 2013. Expected start of commissioning: H

  70. Slide 70: Peterborough EfW - Summary

    Viridor Peterborough EfW - Summary • Waste capacity and supply: 80kt (c55kt contracted for 30 years with Peterborough City Council via Peterborough PPP) • Energy: 7.25 MWe • Capital expenditure: £72m financed by local authority • Build profile: Start date - Summer 2013. Expected start of commissioni

  71. Slide 71: South London (Beddington) EfW - Summary

    Viridor South London (Beddington) EfW - Summary • Waste capacity and supply: 275kt (c200kt contracted for 25 years with London boroughs of Croydon, Kingston, Merton and Sutton via SLWP PPP) • Energy: 26 MWe • Capital expenditure: £199m • Build profile: Planning permission achieved in May 2013. Earli

  72. Slide 72: Avonmouth EfW - Summary

    Viridor Avonmouth EfW - Summary • Waste capacity and supply: 350kt (all merchant) • Energy: 28MWe • Capital expenditure: £233m • Build profile: TBA (planning permission achieved) • Operating life: 25 years • Construction contractor: TBA • Operating contractor: Viridor • Plant ownership: 100% Viridor

  73. Slide 73: Dunbar EfW - Summary

    Viridor Dunbar EfW - Summary • Waste capacity and supply: 300kt (all merchant) • Energy: 23MWe and 17MWth • Capital expenditure: £195m • Build profile: TBA (planning permission achieved) • Operating life: 25 years • Construction contractor: TBA • Operating contractor: Viridor • Plant ownership: 100%

Pennon Group — Investor Presentation (September 2013) on 6ix