Barrick Mining Corporation · TSX:ABX

Barrick Mining — Technical Presentation (April 2014)

21 slides from Barrick Mining's technical presentation, Apr 8, 2014

  1. Slide 1: Zaldívar Site Visit

    Bienvenido! Zaldívar Site Visit April 8, 2014 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain information contained or incorporated by reference in this presentation, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes

  2. Slide 2: Agenda

    Agenda 1. SAFETY BRIEFING 2. OVERVIEW OF COPPER GROUP 3. SITE AND TOUR OVERVIEW 4. CORPORATE RESPONSIBILITY 5. FUTURE OPPORTUNITIES 3 Agenda 1. SAFETY BRIEFING 2. OVERVIEW OF COPPER GROUP 3. SITE AND TOUR OVERVIEW 4. CORPORATE RESPONSIBILITY 5. FUTURE OPPORTUNITIES 4

  3. Slide 3: Zaldívar Safety Performance

    Zaldívar Safety Performance Total Reportable ƒ Second lowest TRIF among Injury Frequency Rate 26 Barrick sites in 2013 0.8 ƒ Over 4 million hours (11 0.7 0.67 months) without a 0.6 reportable injury 0.53 0.5 0.4 0.3 86% 0.2 0.09 0.1 0 2011 2012 2013 5 Agenda 1. SAFETY BRIEFING 2. OVERVIEW OF COPPER

  4. Slide 4: Global Copper Group

    Global Copper Group ƒ A dedicated senior leadership team was appointed in late 2012 ƒ Small company approach, lean, clarity of roles ƒ Focused exclusively on optimizing copper assets to maximize free cash flow and risk adjusted returns Zaldívar Lumwana JabalSayid 7 Copper Group Leadership Team ƒ Mar

  5. Slide 5: Location

    Agenda 1. SAFETY BRIEFING 2. OVERVIEW OF COPPER GROUP 3. SITE AND TOUR OVERVIEW 4. CORPORATE RESPONSIBILITY 5. FUTURE OPPORTUNITIES 9 Location Zaldívar Antofagasta PACIFIC OCEAN Atacama Cerro Casale CHILE ARGENTINA Pascua-Lama Veladero La Serena Coquimbo San Juan San Juan 0 miles 100 200 300 400 500

  6. Slide 6: Zaldívar Highlights

    Zaldívar HIGHLIGHTS 9 Large copper deposit close to port 9 Low-cost, competitive producer 9 Significant remaining mine life 9 Strong reputation with government and regulators 11 Zaldívar Copper 12

  7. Slide 7: C1 Cash Cost Rankings

    Chilean Copper Mines ൞ Cost Ranking 2012 Total Direct Costs $ US/lb sold $5.00 $4.00 $3.00 Average: $2.45 $1.80 $2.00 $1.00 $0.00 Source: Informe Financiero de la Minería – Cesco Chile: http://www.cesco.cl/ 13 Global 2013 C1 Cash Costs Copper Mines - Composite C1 Cash Costs Grouped by Mine C1 Cash C

  8. Slide 8: 2013 Copper Reserves & Resources

    2013 Copper Reserves & Resources(1,2) Tons Grade Contained lbs Zaldívar (000s) (g/t) (millions) P&P Reserves 555,060 0.540 5,997 M + I Resources 166,519 0.450 1,500 Inferred Resources 10,570 0.591 125 (1) See final slide #1 (2) Reserve and resource calculations based on $3.00/lb and $3.50/lb, respec

  9. Slide 9: Zaldívar Site Layout

    Zaldívar Site Layout Secondary N LeachPad SX/EWPlant Tailings TertiaryCrusher Dynamic LeachPad Dump Leach Waste Dumps PrimaryCrusher 0 1 2 3 4 5km 17 Zaldívar Tour Stops Secondary N LeachPad SX/EW Pl SX/EWPlant Tailings TertiaryCrusher Dynamic L hP d LeachPad Dump Leach Waste Office Dumps YouAreHere

  10. Slide 10: Open Pit Mining

    Open Pit Mining ƒ Conventional truck/shovel operation ƒ Ore body lies within a large tertiary porphyry copper system inclusive of the Escondida deposit 2013 Tonnesperday 207,000 Grade 0.50%Cu MiningCost $1.98pertonne ƒ 2013 strip ratio: ~0.61:1 19 Planned Mine Stages A/B B A B A/B A/B A: Areas Mined

  11. Slide 11: Mining Fleet and Equipment

    Mining Fleet and Equipment 3 P&H 4100 Shovels 2 Marathon L1800/L1850 loaders 1 Caterpillar 994D loader 3 Atlas Copco/Drilltech drills 17 Dresser 830E trucks 15 Komatsu 830E-AC trucks 6 Terex MT4400 trucks 1 Caterpillar 793B trucks 1 Liebherr R954 excavator 9 D375 A-5 Komatsu bulldozers 2 Caterpillar

  12. Slide 12: Processing Circuit

    Processing Circuit LEACH PAD DYNAMIC STACKER PRIMARY HEAP LEACH PAD ELECTROWINNING PLANT COPPER CATHODES READY FOR SALE 23 Process Flowsheet MINE PRIMARY & SECONDARY CRUSHING CRUSHING SILO TERTIARY CRUSHER CYCLONES FLOTATION THICKENER THICKENER LEACH PAD EMERGENCY TAILINGS DUMP STOCKPILE THICKENER S

  13. Slide 13: Cathode Marketing

    Cathode Marketing ƒ Zaldívar sells copper 2013 Zaldívar cathode via the London GradeBreakdown Metal Exchange (LME) 1High Grade 88% ƒ The LME rates purity of copper based on a 2 Standard Grade 9% three grade scale 3 OffGrade 2% ƒ Zaldívar’s proportion of Scrap 1% high grade material produced is one o

  14. Slide 14: Environmental Innovation

    Agenda 1. SAFETY BRIEFING 2. OVERVIEW OF COPPER GROUP 3. SITE AND TOUR OVERVIEW 4. CORPORATE RESPONSIBILITY 5. FUTURE OPPORTUNITIES 27 Environmental Innovation ƒ Due to Zaldívar’s unique, high altitude desert location, environmental stewardship is a key focus. Initiatives include: ƒ Use of bio-mass

  15. Slide 15: Corporate Social Responsibility

    Corporate Social Responsibility 29 Zaldívar Community Relations ƒ Implementing Barrick Community Relations Management System – 70% completed, expected by end of 2014 ƒ Established Community Relations Program – Local Supplier Training and Development Program, focusing on vulnerable peoples – Micro-en

  16. Slide 16: Future Opportunities

    Agenda 1. SAFETY BRIEFING 2. OVERVIEW OF COPPER GROUP 3. SITE AND TOUR OVERVIEW 4. CORPORATE RESPONSIBILITY 5. FUTURE OPPORTUNITIES 31 Future Opportunities ƒ Significant opportunities exist to optimize or extend Zaldívar’s remaining mine life ƒ Focus is on evaluating brownfield growth opportunities

  17. Slide 17: Crusher Fines Processing

    Crusher Fines Processing Develop a feasible leaching process to recover copper from the oxide fines collected from tertiary crushing Opportunity ƒ ~13M tonnes of fines grading 0.7% Cu are currently stockpiled ƒ ~8M tonnes grading 0.5% Cu are expected for remaining LOM ƒ Estimated additional producti

  18. Slide 18: Primary Deep Sulfides

    Primary Deep Sulfides Exploit primary deep sulfides beneath existing Zaldívar pit Opportunity ƒ 6.6 Blbs of additional sulfide material that is not currently part of reserves or resources, requires expanded processing capacity(1) ƒ Significant extension to mine life via 1 B incremental tonnes gradin

  19. Slide 19: Copper Market Outlook

    Appendix COPPER MARKET OUTLOOK 37 Price, Production Costs & Stocks 1990-2018 Historically,pricefloorforcopperhas beenthe90th percentileofC1cost (2014forecast~$2.25/lb) Average Metal Stocks Source: Wood Mackenzie 38

  20. Slide 20: Copper Grade Outlook

    Copper Grade Outlook IndustryHeadGradeTrends(WeightedbyPaidCopper) 39 Positive Copper Outlook ƒ Structural change in demand supported by urbanization of emerging markets, i.e. China/India ƒ In the long term, the industry will be challenged to mount a sufficient supply response due to: – aging, lower

  21. Slide 21: Footnotes

    Footnotes 1. Calculated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. For a breakdown, see pages 27-37 of Barrick’s Form 40-F. 2. C1 cash costs pper pound p and C3 fullyy allocated cash costs per p pound p are non-GAAP financial performance

Barrick Mining — Technical Presentation (April 2014) on 6ix