Jupiter Energy Limited · ASX:JPR

Jupiter Energy — Investor Presentation (March 2022)

16 slides from Jupiter Energy's investor presentation, March 2022

  1. Slide 1: Corporate Presentation

    Corporate Presentation March 2022

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation contains forward-looking statements that are subject to risk factors associated with the oil and gas industry. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by a variety of variables which could cause actual r

  3. Slide 3: Table of Contents

    TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Current and future development

  4. Slide 4: Board of Directors and Management

    BOARD OF DIRECTORS AND MANAGEMENT Directors Geoff Gander Alexey Kruzhkov Baltabek Kuandykov Alexander Kuzev Mark Ewing Chairman/CEO NED - Cyprus NED – Kazakhstan NED - Moscow NED - Australia Kazakhstan & President – Jupiter KZ Australia o Focused on Kazakh business o 40 years’ experience in local an

  5. Slide 5: Overview of Jupiter Energy

    OVERVIEW OF JUPITER ENERGY Operations started in 2008 on the 100% owned 18-month outlook: licence area under Contract 2275 and Contract 4803-UVS ME (Akkar East Production Contract) o Commercial Production from the Akkar East and Akkar North (East Block) fields under “Preparatory Period” Licence rest

  6. Slide 6: Progress from 2008-2021

    PROGRESS FROM 2008-2021 KEY PROJECTS DISCOVERIES OIL PRODUCTION FUNDING DURING 2022-23 3D seismic data acquired for the 2010/11: NIL 1Q 2022 – Project Plan designed Listed on the ASX entire licence area plus 2011/12: 4,000 tonnes/28,000 to achieve 100% gas utilization on 2010: Cornerstone investment

  7. Slide 7: Table of Contents

    TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Current and future development

  8. Slide 8: Location of the Licence Area

    LOCATION OF THE LICENCE AREA North Akkar Total reserves for the Mangistau basin are estimated to be in excess of 5 billion barrels including two large oil fields, Uzen and Zhetybai

  9. Slide 9: Reserves and Production Summary

    RESERVES AND PRODUCTION SUMMARY Restricted Commercial Production: Akkar North – East Block (1 well) and Akkar East (3 wells) are approved to produce under Preparatory Period Licence restrictions with any gas produced during production needing to be used on the field for heating, power and the like (

  10. Slide 10: Licence Details

    LICENCE DETAILS 100% GAS UTILISATION BLOCK 31 EXPLORATION LICENCE PRODUCTION LICENCE INFRASTRUCUTRE Permit issued in December 2006 and Completed on all 3 oilfields 25 years for commercial discoveries – Detailed Project Plan has been acquired by Jupiter in June 2008 commenced in 2020 submitted to the

  11. Slide 11: Table of Contents

    TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Current and future development

  12. Slide 12: Current Field Development

    CURRENT FIELD DEVELOPMENT License area of “MMG” JSC Prospect of the reserves’ increase in North Akkar the area of well #54 by 2.8mln. tons oilfield Akkar North (Eastern block) С1+С2 geol./recov. reserves Akkar North 2976/642thous.tons Joint Full Field Development Project with MMG JSC in progress Akk

  13. Slide 13: Current Status of Field Development

    CURRENT STATUS OF FIELD DEVELOPMENT Akkar North (East Block) & East Akkar: 6 wells @ 1-2km apart; All oil produced from the Triassic (T2B) horizon; T2A and Jurassic has shows in all wells, but the Company has not produced from intervals other than T2B; Final Reserve Reports for Akkar E and Akkar N (

  14. Slide 14: Next Phase of Development – 100% Gas Utilisation

    NEXT PHASE OF DEVELOPMENT – 100% GAS UTILISATION PLANNED INFRASTRUCTURE OFFTAKE OPPORTUNITY TIMING PRODUCTION OUTLOOK Detailed 100% Gas Utilisation Cost effective electricity has Detailed 100% Gas Utilisation 25 year Production Licence Plan lodged with Kazakh a number of potential Plan submitted in

  15. Slide 15: Further Development Potential

    FURTHER DEVELOPMENT POTENTIAL 10-20 mmbbls 10+ mmbbls

  16. Slide 16: Contact Details

    CONTACT DETAILS Geoff Gander Chairman & CEO Jupiter Energy Limited +7 701 221 8907 (KZ) +61 417 914 137 (AU) geoff@jupiterenergy.com www.jupiterenergy.com

Jupiter Energy — Investor Presentation (March 2022) on 6ix