  1. Slide 1: Investor Morning, Sydney 6 April 2011

    Beach Energy Limited For personal use only ‘Investor Morning’ Sydney - 6 April 2011 Beach Energy Limited, Investor Morning – 6 April 2011 Slide 1

  2. Slide 2: Welcome

    For personal use only Welcome Chris Jamieson Investor Relations Manager Beach Energy Limited, Investor Morning – 6 April 2011 Slide 2

  3. Slide 3: Welcome and housekeeping

    Welcome and housekeeping Time Topic Presenter For personal use only 8:30-9:00 am Registration 9:00-9:05am Welcome Chris Jamieson 9:05-9:25am Strategic overview Reg Nelson 9:25-9:40am Operational overview Neil Gibbins 9:40-9:55am Positioned for growth in Eastern Australian gas markets Steve Masters 9

  4. Slide 4: Strategic overview

    For personal use only Strategic overview Reg Nelson Managing Director Beach Energy Limited, Investor Morning – 6 April 2011 Slide 4

  5. Slide 5: Compliance statements

    Compliance statements For personal use only Disclaimer • This presentation contains forward looking statements that are subject to risk factors associated with oil, gas, geothermal and related businesses. It is believed that the expectations reflected in these statements are reasonable but they may

  6. Slide 6: Beach Energy Limited - A unique value proposition

    Beach Energy Limited - A unique value proposition For personal use only Beach Energy Limited, Investor Morning – 6 April 2011 Slide 6

  7. Slide 7: Operational overview

    For personal use only Operational overview Neil Gibbins Chief Operating Officer Beach Energy Limited, Investor Morning – 6 April 2011 Slide 7

  8. Slide 8: Safety priority

    Safety priority Safety takes precedence in all operations For personal use only • Low Supervision Classification for Production Operations (SA) by PIRSA • HSE Strategic Planning – 3 year plan • Continued support for APPEA Stand Together for Safety campaign • Over 18 months without a recordable injur

  9. Slide 9: Key growth pillars

    Key growth pillars For personal use only • High margin Cooper Basin: • Western Flank • Egypt: Material oil • Western Desert opportunities • Gulf of Suez • East African Rift: • Tanzania Large scale gas • Cooper Basin conventional resource to reserves • Cooper Basin shale and tight gas conversion oppo

  10. Slide 10: Large Resource base to build Reserves

    Large Resource base to build Reserves For personal use only 2P Reserves 2P Reserves & Contingent Resources 66 MMboe* 363 MMboe* 2P Reserves are a fraction of the total resource base Cooper / Eromanga Other Cooper / Eromanga 2P Other Material resource additions likely for Cooper Basin gas activity *

  11. Slide 11: Solid production platform

    Solid production platform Beach Operated Western Flank Oil For personal use only • FY11 guidance of ~ 7 MMboe* Gross Expected Ultimate Recovery (MMbbl) 12 • Consistent Cooper Basin production performance 10 • Short-term opportunities for 8 production growth given: – Better land access for activities

  12. Slide 12: A one in forty year flood event

    A one in forty year flood event For personal use only Typical conditions 2010 flood event Anticipating better conditions for the Cooper Basin in 2011 Beach Energy Limited, Investor Morning – 6 April 2011 Slide 12

  13. Slide 13: FY11 capital requirements

    FY11 capital requirements HY11 FY11 Forecast For personal use only $million $million Development capital Cooper Basin 32.1 90.2 BMG 0.8 0.8 Egypt 0.8 5.7 Total development capital 33.7 96.7 Exploration capital Australasia 8.7 52.0 Unconventional 16.8 44.1 International and new ventures 6.8 19.1 Tota

  14. Slide 14: Key catalysts for 2011

    Key catalysts for 2011 For personal use only Multiple near-term catalysts with material re-rating potential Beach Energy Limited, Investor Morning – 6 April 2011 Slide 14

  15. Slide 15: Positioned for growth in Eastern Australian gas markets

    For personal use only Positioned for growth in Eastern Australian gas markets Steve Masters Chief Commercial Officer Beach Energy Limited, Investor Morning – 6 April 2011 Slide 15

  16. Slide 16: Prolific acreage position

    Prolific acreage position For personal use only Beach owns a strategic suite of assets and infrastructure, positioning it to supply gas for generations to come Beach Energy Limited, Investor Morning – 6 April 2011 Slide 16

  17. Slide 17: Australian pipeline growth

    Australian pipeline growth Pre - 1995 Post - 1995 For personal use only • Approx 10,500 km • Approx 20,000 km • Point-to-point pipelines • Interconnected pipelines • Majority government owned • Privatisation Source: APA investor presentation, April 2010 Beach Energy Limited, Investor Morning – 6 Apr

  18. Slide 18: Eastern Australian gas markets are growing

    Eastern Australian gas markets are growing • Current domestic gas demand For personal use only ~ 700 PJ per annum: – ~ 100 PJ from Cooper Basin • Domestic gas demand expected to grow to ~ 1100 PJ by 2025*: – Driven by power generation – Higher demand scenarios possible • Gladstone based LNG projects

  19. Slide 19: Excellent prospects to increase Cooper Basin supply

    Excellent prospects to increase Cooper Basin supply Uncontracted Demand by Country - Based on For personal use only Likely Supply • Strong predicted growth in Eastern 100 Australian gas demand 80 60 • Strong predicted growth in Asian LNG mtpa 40 demand 20 • Excellent channels to markets 0 2010 2011

  20. Slide 20: Excellent prospects to increase East Coast gas supply

    Excellent prospects to increase East Coast gas supply For personal use only • Strong existing customer Existing relationships customers – extension • Developing new customers and contracts opportunities Existing customers – • Cooper Basin is likely to become Export LNG incremental contracts increasi

  21. Slide 21: The impact of eastern Australian LNG projects

    The impact of eastern Australian LNG projects For personal use only Australian East Coast 2P Reserves* • Two projects have achieved FID committing > 16 mtpa capacity 7.0% BG Group 2.3% 18.7% Santos / PETRONAS 4.2% • BG Group has recently / TOTAL / Kogas Origin Energy announced it is marketing for 9.

  22. Slide 22: Beach is an attractive supply option for gas customers

    Beach is an attractive supply option for gas customers For personal use only • Growing Cooper Basin reserves and contingent resources base • Opportunities to add to reserves and resources in other basins close to markets • Potential to develop scalable gas developments to suit various customer requi

  23. Slide 23: SACB/SWQ JV – Significant long-term resource potential

    For personal use only SACB/SWQ JV – Significant long-term resource potential Gordon Moseby General Manager - Business Review and Planning Beach Energy Limited, Investor Morning – 6 April 2011 Slide 23

  24. Slide 24: SACB/SWQ JV – Its importance to Beach

    SACB/SWQ JV – Its importance to Beach • Equity interests of approximately For personal use only 20% for the SACB JV and 23% for the SWQ JV • A significant land holding of 26,800 km2 • Situated in a proven and prolific basin • Cooper Basin cumulative gross production to date of approximately 6 Tcf •

  25. Slide 25: SACB/SWQ JV – Its importance to Beach

    SACB/SWQ JV – Its importance to Beach For personal use only • A diversified product stream delivering gas, gas liquids and oil to multiple markets • Synergies with other Beach operational areas • Significant infrastructure made up of: – Wells accessing Permian strata – Gathering systems across the t

  26. Slide 26: SACB/SWQ JV – Ultimate potential is significant

    SACB/SWQ JV – Ultimate potential is significant For personal use only Source: Santos Remaining gross unrisked resource potential of over 4 billion barrels of oil equivalent Beach Energy Limited, Investor Morning – 6 April 2011 Slide 26

  27. Slide 27: SACB/SWQ JV – Resource to reserves conversion

    SACB/SWQ JV – Resource to reserves conversion For personal use only • Current 2P reserves of 63 MMboe* • 2C resources of 262 MMboe* • Resource to reserves conversion of 12.0 MMboe (net to Beach) recently announcement by Santos • Implies a 170% 2P reserves replacement ratio for FY11 * As at 30 June 2

  28. Slide 28: SACB/SWQ JV – Resource conversion drivers

    SACB/SWQ JV – Resource conversion drivers Resource to reserves conversion For personal use only driven by: • Infill drilling (denser well spacing) • More focused fraccing of individual zones • Multiple wells per pad delivering lower unit costs • More efficient wellbore hydraulics => lower abandonmen

  29. Slide 29: SACB/SWQ JV - GLNG Project supply opportunity

    SACB/SWQ JV - GLNG Project supply opportunity For personal use only • Discussions ongoing between SACB JV and Santos for the supply of 750 PJ to Santos’ GLNG Project*: – Beach’s share of supply would be ~ 152 PJ – 15 year contract - proposed to commence in 2014 – Oil-linked gas pricing • Highlights

  30. Slide 30: SACB/SWQ JV - Summary

    SACB/SWQ JV - Summary For personal use only • Significant remaining resource potential • New technology is unlocking this potential • Reserves growth significantly exceeds current production levels • Proposed GLNG contract would underpin gas production until 2030 • Continued long-term growth is fore

  31. Slide 31: Questions?

    For personal use only Questions? …..and then morning tea Beach Energy Limited, Investor Morning – 6 April 2011 Slide 31

  32. Slide 32: The Cooper Basin shale gas potential

    For personal use only The Cooper Basin shale gas potential Mark Pitkin Coordinator - Unconventional Resources Beach Energy Limited, Investor Morning – 6 April 2011 Slide 32

  33. Slide 33: A commanding Cooper Basin shale gas acreage position

    A commanding Cooper Basin shale gas acreage position • PEL-218 (Permian JV) potential shale gas in For personal use only place 40-80 Tcf • Similar properties to successful US shale plays • Encounter-1 drilled late 2010: – Target zone 30% thicker than anticipated – Gas saturated with no water through

  34. Slide 34: The importance of REM section for shale & tight gas

    The importance of REM section for shale & tight gas For personal use only • Thick target section • Gas charged • Over-pressured • Favourable mineralogy Key attributes confirmed to date provide significant encouragement Beach Energy Limited, Investor Morning – 6 April 2011 Slide 34

  35. Slide 35: Nappamerri Trough – thick Early Permian shale sequence

    Nappamerri Trough – thick Early Permian shale sequence Shale play: For personal use only • Roseneath 80-200 metre thick • Epsilon ~100 metre shale • Murteree ~80 metre thick Over-pressured tight gas play: • Epsilon – mid and basal zones sandier • Patchawarra – multiple sands Other tight gas in secti

  36. Slide 36: Over-pressured at REM level

    Over-pressured at REM level Normally pressured: For personal use only Pressure (psi) 0 0 2000 4000 6000 8000 10000 • Water gradient to surface • All Formations outside Trough • 0.43 psi/ft 1000 Over-pressured: Regional pressure data – over-pressures confined to • Exploration wells – in Trough Depth

  37. Slide 37: Favourable mineralogy

    Favourable mineralogy For personal use only 40-60% Clay: 100 0 Barnet Haynesville Eagle Ford Utica • Similar to Barnett and Haynesville Nappamerri 80 20 Barnet Eagle Ford 10-20% Carbonate: Haynesville Utica • Carbonate in the form of siderite Sil % 60 40 Nappamerri ica ys +o Cla the 25-50% Quartz: 4

  38. Slide 38: Comparison to US plays

    Comparison to US plays For personal use only Haynesville Parameter PEL 218 Permian REM Barnett (Texas) (Louisiana) Depth (metres) 2,900 – 3,500 1,650 – 3,000 3,050 – 3,950 Shale thickness 120 – 260 75 – 150 60 – 90 (metres) Total Organic Carbon 3–5 5 4 Av% Pressure Gradient 0.72 0.55 0.85 (psi/ft) G

  39. Slide 39: Vertical well exploration program - key objectives

    Vertical well exploration program - key objectives For personal use only Goals: • Determine gas in place volumes • Design fracture stimulation program • Understand gas flow potential • Book gas resource • Prioritise targets for development Importance of early coring effort: • Develop log-core correl

  40. Slide 40: Key results from Encounter-1

    Key results from Encounter-1 For personal use only • Target section thicker than expected at 393 metres and therefore more volume • Target section gas saturated and over-pressured • No water bearing permeable sections intersected in, above or below target zone • ‘Deep Basin’ gas potential confirmed

  41. Slide 41: Shale drilling - Cost reduction driven by technology

    Shale drilling - Cost reduction driven by technology For personal use only • Advancements in multi-stage fracture stimulation techniques has driven cost efficiencies in US oil and gas developments • Pad drilling is enabling further equipment cost efficiencies • Advances in technology are delivering:

  42. Slide 42: Shale gas exploration – Stage indicative timeline

    Shale gas exploration – Stage 1 indicative timeline For personal use only Proof of concept: 2010 – 2011 Drill and core Holdfast-1 & Fracture BOOK GAS Pilot Encounter-1 stimulate wells Flow test RESOURCE Production vertical ~ 8 zones/well Wells exploration wells Q4 2010/ Q2 2011 Q2 2011 Q2/Q3 2011 Q3

  43. Slide 43: Next steps

    Next steps For personal use only With successful proof of concept: • Design pilot horizontal wells targeting highest yield zones in REM • Drill further vertical delineation wells across acreage • Expand production pilot to multiple wells • Seek to monetise early production via existing facilities •

  44. Slide 44: Dominant Western Flank oil acreage position

    For personal use only Dominant Western Flank oil acreage position Mike Dodd Exploration and Development Manager Beach Energy Limited, Investor Morning – 6 April 2011 Slide 44

  45. Slide 45: Cooper Basin – Western Flank Oil

    Cooper Basin – Western Flank Oil Western Flank oil is a core contributor For personal use only to Beach due to: • High net back per barrel • Beach holding strong equity positions • Quick drill and tie-in periods • Established infrastructure and surety of delivery • High flow rates from wells • Good

  46. Slide 46: Impress Energy acquisition

    Impress Energy acquisition For personal use only • Beach will have 100% ownership of Impress Energy through compulsory acquisition • Impress holds a 40% interest in highly prospective Western Flank oil acreage • On 21 February, Senex Energy (Operator) announced an upgrade to 2P reserves in the Growl

  47. Slide 47: Western Flank Drilling Program

    Western Flank Drilling Program Beach operated For personal use only • Five exploration wells in PEL 91 (Beach 40%) • Eleven wells in PEL 92 (Beach 75%), seven exploration and four development • Targeting exploration prospects of 0.5 - 5.5 million barrels of oil (gross) • Success at first two wells,

  48. Slide 48: Namur Sandstone

    Namur Sandstone PARSONS-1 Namur Sandstones plays: For personal use only • Widespread high net to gross braided channel environment • Subtle structures delineated on 3D seismic data • Very high permeability • Parsons-3 clean up flow 5,200 bopd Parsons-1 Namur Beach Energy Limited, Investor Morning –

  49. Slide 49: Birkhead Formation Channel Sand

    Birkhead Formation Channel Sand Growler 3 For personal use only Birkhead Sandstones plays: • Deposited in meandering channels • Do not necessarily rely on structural traps – can be extensive accumulations • Can be imaged on seismic data Beach Energy Limited, Investor Morning – 6 April 2011 Slide 49

  50. Slide 50: Birkhead Formation Channel Sand

    Birkhead Formation Channel Sand For personal use only Source – Senex, 2011 Birkhead channels can be imaged on seismic, significantly reducing risk Beach Energy Limited, Investor Morning – 6 April 2011 Slide 50

  51. Slide 51: 2011 Drilling Program – Expected outcomes

    2011 Drilling Program – Expected outcomes For personal use only Reserve additions • 6 million barrels of oil net to Beach • Increased pipeline capacity Beach operated production • 4,500+ barrels of oil per day net to Beach Non-operated production • 1,000+ barrels of oil per day net to Beach Oil prod

  52. Slide 52: ‘Big oil’ potential, Tanzania

    For personal use only ‘Big oil’ potential, Tanzania Danny Burns International and New Ventures Manager Beach Energy Limited, Investor Morning – 6 April 2011 Slide 52

  53. Slide 53: Tanzania – Attracting the majors

    Tanzania – Attracting the majors For personal use only • Various phases of exploration undertaken since 1952 with very few exploration wells drilled • Early wells drilled with poor quality or inadequate seismic control • Tanzania has now attracted attention of the large players, eg: – Shell – Statoi

  54. Slide 54: Rift systems - Gulf of Suez vs Lake Tanganyika

    Rift systems - Gulf of Suez vs Lake Tanganyika Gulf of Suez: Gulf of Suez Lake Tanganyika For personal use only • Rift valley system • Area approximately 9,000km2 • 800+ exploration wells drilled • 9.5 billion barrels of oil discovered Lake Tanganyika • Rift valley system • Area approximately 32,900

  55. Slide 55: Rift systems - Lake Albert, Uganda

    Rift systems - Lake Albert, Uganda • Tullow identified this East African rift For personal use only basin opportunity in 2001 • Lake Albert area approximately 5,300km2 • The Lake Albert rift basin is part of a string of Pliocene-Miocene age rift basins that cut through East Africa • Lake Albert char

  56. Slide 56: Rift systems - Lake Tanganyika, Tanzania

    Rift systems - Lake Tanganyika, Tanzania • Beach 100% For personal use only • Underexplored area with high potential • Lake Tanganyika South acreage is approximately 7,000 km2 • Potential for large (> 200 MMbbl) discoveries: – Natural oil seeps on Lake Tanganyika indicate a working petroleum system

  57. Slide 57: Lake Tanganyika natural oil seeps

    Lake Tanganyika natural oil seeps For personal use only Beach Energy Limited, Investor Morning – 6 April 2011 Slide 57

  58. Slide 58: Lake Tanganyika South vs Lake Albert - Analogy

    Lake Tanganyika South vs Lake Albert - Analogy Lake Tanganyika South Seismic Line – 2D Lake Albert Seismic Line – 3D For personal use only 1.5 sec - 2.0 sec - 2.5 sec - Deeper water in Lake Tanganyika Source: Beach Energy Ltd – Project Probe data Source: Tullow Oil plc – EAPCE, 2011 Beach Energy Lim

  59. Slide 59: Lake Tanganyika South – play types

    Lake Tanganyika South – play types For personal use only • Typical rift graben/half graben geometries • Seismic indicates large structures with bounding faults • Play types are: – Stratigraphic traps – Fault traps – Three way structured traps against basement – Anticlinal traps • These are similar t

  60. Slide 60: Lake Tanganyika South – Beach exploration program

    Lake Tanganyika South – Beach exploration program For personal use only • Eleven year PSA structured into phases of 4 + 4 + 3 years • Phase 1 minimum commitment expenditure of ~ US$7 million • One exploration well required in Phase 2 & Phase 3 Phase 1 planned exploration • Seismic reprocessing of pr

  61. Slide 61: Egypt – Established and growing portfolio

    For personal use only Egypt – Established and growing portfolio Simon Brealey Exploration New Ventures Beach Energy Limited, Investor Morning – 6 April 2011 Slide 61

  62. Slide 62: Egypt overview

    Egypt overview For personal use only • Beach interests range 15 – 22% • An established and growing portfolio • Exposure to prolific and emerging hydrocarbon basins: – Portfolio of near-term development & exploration opportunities • North Shadwan expected to produce first oil in 2011 • Abu Sennan* fo

  63. Slide 63: Abu Sennan concession

    Abu Sennan concession For personal use only • Beach 22%* • 3D seismic coverage over whole concession which has been the key to success for Apache in the surrounding tenements • Initial four well program underway, with the potential for at least ten wells • ZZ-4 well appraising the existing discovery

  64. Slide 64: Gulf of Suez

    Gulf of Suez For personal use only • Beach 20% interest • High potential Gulf of Suez acreage • Three existing oil discoveries: – NS 377 and 385 (‘near shore fields’) – NS 394 ‘Burtocal’ • First oil expected in 2011 • North Shadwan delays due to pipeline operator sign off on oil mix in pipeline • Ad

  65. Slide 65: Mesaha concession

    Mesaha concession For personal use only • Beach interest 15%* • One of the largest concession areas in Egypt at 57,000km2 • Wildcat basin with the right ingredients • Possible rift basin similar to Gulf of Suez/Lake Albert/Lake Tanganyika • Potential for very large oil fields (~ 100 MMbbl+) • 2D sei

  66. Slide 66: Closing remarks

    For personal use only Closing remarks Reg Nelson Managing Director Beach Energy Limited, Investor Morning – 6 April 2011 Slide 66

  67. Slide 67: Strong and diverse growth potential

    Strong and diverse growth potential For personal use only Current share price does not reflect Beach’s growth portfolio Beach Energy Limited, Investor Morning – 6 April 2011 Slide 67

  68. Slide 68: Contact information

    Contact information Beach Energy Limited – Head office For personal use only 25 Conyngham Street Glenside SA 5065 Tel: +61 8 8338 2833 Fax: +61 8 8338 2336 Website: www.beachenergy.com.au Chris Jamieson Investor Relations Manager Tel: +61 8 8338 2833 Mob: +61 8 (0)487 173 244 Email: chris.jamieson@b