TransGlobe Energy — Investor Presentation (February 2014)
29 slides from TransGlobe Energy's investor presentation, February 2014
Slide 1: Corporate Presentation February 2014
Corporate Presentation February 2014
Slide 2: Cautionary Statement
Cautionary Statement This presentation includes certain information deemed to be "forward-looking information" or "forward-looking statements" within the meaning of applicable Canadian and United States securities laws. All information other than information of historical fact is forward-looking inf
Slide 3: TransGlobe Energy Corporation
TransGlobe Energy Corporation Shares outstanding as at January 31, 2014 Basic 74,624,394 Fully Diluted* ~75,600,000 Insider Ownership ~10% Market Capitalization at $7.28 as at January 31, 2014 $541 MM Working Capital (30/09/2013) $318 MM Debt (30/09/2013) ($124) MM Enterprise Value ~ $347 MM January
Slide 4: Production and Reserves
Production and Reserves Average Daily Production P + P Reserves (Bopd) (MMBbl) 25,000 60 Yemen Egypt Canada Yemen Egypt Canada 20,500* 48.7 50 20,000 45.3 18,303 44.2 17,457 40 15,000 12,132 30.4 30 9,960 24.2 10,000 8,970 19.8 7,342 20 16.4 4,991 5,093 5,220 11.6 5,000 10.4 10.5 3,796 10 7.0 2,570
Slide 5: Funds Flow and Reserves / share
Funds Flow and Reserves / share Funds Flow from Operations per Funds Flow from Operations Share (US$MM) $200 $2.50 (US$MM/Share Diluted) *Forecasted at $100 Brent to year end 2013 and 2014 $160 $2.00 $120 $1.50 $80 $1.00 2.04 154 146 1.79 135 1.60 120 1.09 $40 75 $0.50 0.96 0.89 0.77 0.74 54 65 0.63
Slide 6: 2013 Reserves
2013 Reserves By Area MMBbl NPV10 2013 2P Reserves (MMBbl) Total Proved (1P) Egypt 28.8 $449 East Block S-1 Block 32 Ghazalat 9% 1% Yemen 2.8 $46 3% (1P) 31.6 $495 West Total Proved plus Probable (2P) Bakr West 39% Egypt 40.8 $549 Gharib Yemen 4.5 $65 48% (2P) 45.3 $615 Total Proved plus Probable pl
Slide 7: 2014 Guidance
2014 Guidance Production 20,000 – 21,000 Bopd Mid-point 20,500 Bopd Egypt – West Gharib, West Bakr, East Ghazalat NW Gharib / South Alamein not currently forecast for 2014 Company Yemen – Block S-1 on production 50% of 2014 plus Block 32 assessing the Funds Flow of $146MM ($1.93/share) n
Slide 8: 2014 Capital Guidance
2014 Capital Guidance TransGlobe Net Capital ($MM) Development Exploration Gross Well Count Concession Wells Projects Wells Seismic Total Dev Expl Total Eastern Desert $50.1 $9.3 $13.2 $14.7 $87.3 30 13 43 Western Desert $1.5 $1.0 $3.8 $0.0 $6.3 2 3 5 Egypt Totals $51.6 $10.3 $17.0 $14.7 $93.6 32 16
Slide 9: Egypt Land Holdings
Egypt Land Holdings West GROSS ACRES Gharib/ West Bakr 1.3 million NW,SW,SE 40 Gharib South 335 Alamein 356 465 102 East South Ghazalat Ghazalat 9
Slide 10: West Gharib
West Gharib 100% Working Interest, Operated 2014 Plan 9 wells Waterflood optimization Hoshia ASP flood simulation/lab work Facility centralization and upgrades YTD drilled 2 wells 2 oil wells (100% success) Production in January 2014 Currently drilling at Arta 11,556 Bopd 10
Slide 11: West Bakr
West Bakr 100% Working Interest, Operated 2014 Plan 17 wells Waterflood optimization Facility upgrades and optimization YTD drilled 1 well 1 oil well K (100% success) Production in January 2014 5,908 Bopd 11
Slide 12: Eastern Desert Drilling History
Eastern Desert Drilling History 40 2007-2014 West Bakr Current Drilling Totals 30 Producing Wells West Gharib Oil Wells 135 20 West Gharib 81 D&A Wells 19 10 West Bakr 39 Success Rate 88% 0 2007 2008 2009 2010 2011 2012 2013 Total 120 Gross Operated Wells West Gharib West Bakr Eastern Desert Totals
Slide 13: Eastern Desert Inventory
Eastern Desert Inventory Location Inventory Potential Drilling Locations Concession App/Dev Expl West Gharib 9 3 West Bakr 32 4 NW Gharib 46 33 SW Gharib - 4 SE Gharib - 2 Eastern Desert Totals 87 46 13
Slide 14: Eastern Desert - New Concessions
Eastern Desert - New Concessions 100% Working Interest, Operated Effective November 7, 2013 Planning large seismic program for 2014/15 in Egypt NW Gharib Total program ~ 1,800 km² 3-D & 300 km 2-D Eastern Desert ~ 1,000 km² 3-D & 300 km 2-D Western Desert ~ 800 km² 3-D NW Gharib 2014 P
Slide 15: NW Gharib
NW Gharib 100% Working Interest, Operated 2014 Plan Submitted 18 wells for approval 2 rigs (starting Q2, Q3) Initial wells targeting existing 3-D area around Arta/East Arta 71 million barrels of prospective resource* initially identified 58 million barrels of prospective resource* to be
Slide 16: South Alamein
South Alamein 100% Working Interest, Operated Boraq 2014 Plan Contingent on Boraq access West Manar Taef 2013 Drilled West Manar in Jan 2014 (d&a) Drilled Taef in Nov 2013 (d&a) 16
Slide 17: East Ghazalat
East Ghazalat 50% Working Interest, Non-Operated 2014 Plan 5 wells North Dabaa Safwa Field 4 shallow Discovery wells (2E and 2D) 1 deeper exploration well in North Dabaa area Drilling EG#3, Production in January 752 Bopd (376 Bopd to shallow expl TransGlobe) well 17
Slide 18: South Ghazalat
South Ghazalat 100% Working Interest, Non-Operated North Dabaa 2014/2015 Plan Discovery Commence 800 km² 3-D seismic program on SW portion of block S Ghazalat - 1,883 square kilometers (465,000 acres) Company to acquire extensive 3D seismic over area prior to drilling 2 exploration commitment we
Slide 19: Yemen
Yemen Block S-1/ 75 (25% Working Interest); Block 32/ 72 (13.81%/20% Working Interest) 2014 Plan Salsala Exploration Well Block S-1 on production 50% during 2014 (Guidance) Block 32 3 wells in 2014 Salsala appraisal (2 wells) and early development Tasour development well 19
Slide 20: Roadmap to 40,000 Bopd
Roadmap to 40,000 Bopd Based on currently identified opportunities and upside predictions, TransGlobe is targeting a production rate of 40,000 Bopd within four years 50,000 Peak Production (Bopd) 40,000 Boraq assumed to be deferred to mid-2015 Production (bopd) Egypt Exploration (Bid Round 8,000 – 1
Slide 21: In Closing
In Closing 2014 Production guidance 20,000 – 21,000 Bopd 2014 Funds flow guidance of $146 million at 20.5 Mbopd and $100/Brent Potential to reach 40,000 Bopd within four years Fully funded from cash flow and working capital Top tier management team 21
Slide 22: Appendix
TransGlobe Energy CORPORATION = Appendix TSX: TGL / NASDAQ: TGA
Slide 23: Contact Information
Contact Information Steve Langmaid Telephone: 403.444.4787 Email: investor.relations@trans-globe.com For additional information please visit Website: www.trans-globe.com 23
Slide 24: 2013 A/R Collections
2013 A/R Collections Total Collections in 2013 were ~$275 million (2012, ~$157 mm) Months outstanding have decreased to ~7 months $000’s Mths $000’s Bopd A/R Balance versus Months Outstanding* A/R Balance versus Production / day* $300,000 12 $300,000 8.5 Mth Avg. 18,000 $250,000 10 $250,000 7 Mt
Slide 25: Three Year (2011 – 2013) Finding and Development Costs
Three Year (2011 – 2013) Finding and Development Costs Top Tier F&D and Recycle Ratios 3 Yr Weighted 2P 2013E 2012 2011 Average Netback* $19.64 / Bbl $22.08 / Bbl $26.24 / Bbl $22.19 / Bbl $/Bbl F&D $34.78 / Bbl** $4.46 / Bbl $7.07 / Bbl $10.02 / Bbl FD&A $47.96 / Bbl** $7.36 / Bbl $5.24 / Bbl $10.2
Slide 26: Executives and Directors
Executives and Directors Robert G. Jennings - Director, Chairman Ross G. Clarkson - Director, President and CEO Lloyd W. Herrick - Director, VP and COO Geoffrey C. Chase - Director Fred J. Dyment - Director Gary S. Guidry - Director Erwin L. Noyes - Director Randy C. Neely - VP, Fina
Slide 27: Analyst Coverage
Analyst Coverage Christopher Brown, Canaccord Genuity, Calgary, Canada David Phung, Credit Suisse Securities, Calgary, Canada David Dudlyke, Dundee Securities, London, UK Stephane Foucaud, First Energy Capital Corp., London, UK David Popowich, Macquarie Securities, Calgary, Canada Al Sta
Slide 28: Concession Summary
Concession Summary Working Concession Size (acres) Year Concession First Production Jan 2014 Concession Interest Gross Net Acquired Type Date Production West Gharib 100% 28,904 28,904 2007 Development January 2000 11,556 NW Gharib 100% 162,000 162,000 2013 Exploration N/A SW Gharib 100% 48,000 48,00
Slide 29: West Bakr – K Field
West Bakr – K Field New Approach in Legacy Field Successful deviated drilling has accessed new reserves in deeper pools Recent wells have identified unswept intervals with additional upside potential 29
TransGlobe Energy — Investor Presentation (February 2014) on 6ix