TransGlobe Energy Corporation

TransGlobe Energy — Investor Presentation (February 2014)

29 slides from TransGlobe Energy's investor presentation, February 2014

  1. Slide 1: Corporate Presentation February 2014

    Corporate Presentation February 2014

  2. Slide 2: Cautionary Statement

    Cautionary Statement This presentation includes certain information deemed to be "forward-looking information" or "forward-looking statements" within the meaning of applicable Canadian and United States securities laws. All information other than information of historical fact is forward-looking inf

  3. Slide 3: TransGlobe Energy Corporation

    TransGlobe Energy Corporation Shares outstanding as at January 31, 2014 Basic 74,624,394 Fully Diluted* ~75,600,000 Insider Ownership ~10% Market Capitalization at $7.28 as at January 31, 2014 $541 MM Working Capital (30/09/2013) $318 MM Debt (30/09/2013) ($124) MM Enterprise Value ~ $347 MM January

  4. Slide 4: Production and Reserves

    Production and Reserves Average Daily Production P + P Reserves (Bopd) (MMBbl) 25,000 60 Yemen Egypt Canada Yemen Egypt Canada 20,500* 48.7 50 20,000 45.3 18,303 44.2 17,457 40 15,000 12,132 30.4 30 9,960 24.2 10,000 8,970 19.8 7,342 20 16.4 4,991 5,093 5,220 11.6 5,000 10.4 10.5 3,796 10 7.0 2,570

  5. Slide 5: Funds Flow and Reserves / share

    Funds Flow and Reserves / share Funds Flow from Operations per Funds Flow from Operations Share (US$MM) $200 $2.50 (US$MM/Share Diluted) *Forecasted at $100 Brent to year end 2013 and 2014 $160 $2.00 $120 $1.50 $80 $1.00 2.04 154 146 1.79 135 1.60 120 1.09 $40 75 $0.50 0.96 0.89 0.77 0.74 54 65 0.63

  6. Slide 6: 2013 Reserves

    2013 Reserves By Area MMBbl NPV10 2013 2P Reserves (MMBbl) Total Proved (1P) Egypt 28.8 $449 East Block S-1 Block 32 Ghazalat 9% 1% Yemen 2.8 $46 3% (1P) 31.6 $495 West Total Proved plus Probable (2P) Bakr West 39% Egypt 40.8 $549 Gharib Yemen 4.5 $65 48% (2P) 45.3 $615 Total Proved plus Probable pl

  7. Slide 7: 2014 Guidance

    2014 Guidance  Production 20,000 – 21,000 Bopd  Mid-point 20,500 Bopd  Egypt – West Gharib, West Bakr, East Ghazalat  NW Gharib / South Alamein not currently forecast for 2014 Company  Yemen – Block S-1 on production 50% of 2014 plus Block 32 assessing the  Funds Flow of $146MM ($1.93/share) n

  8. Slide 8: 2014 Capital Guidance

    2014 Capital Guidance TransGlobe Net Capital ($MM) Development Exploration Gross Well Count Concession Wells Projects Wells Seismic Total Dev Expl Total Eastern Desert $50.1 $9.3 $13.2 $14.7 $87.3 30 13 43 Western Desert $1.5 $1.0 $3.8 $0.0 $6.3 2 3 5 Egypt Totals $51.6 $10.3 $17.0 $14.7 $93.6 32 16

  9. Slide 9: Egypt Land Holdings

    Egypt Land Holdings West GROSS ACRES Gharib/ West Bakr 1.3 million NW,SW,SE 40 Gharib South 335 Alamein 356 465 102 East South Ghazalat Ghazalat 9

  10. Slide 10: West Gharib

    West Gharib 100% Working Interest, Operated  2014 Plan  9 wells  Waterflood optimization  Hoshia ASP flood simulation/lab work  Facility centralization and upgrades  YTD drilled 2 wells  2 oil wells (100% success) Production in January 2014  Currently drilling at Arta 11,556 Bopd 10

  11. Slide 11: West Bakr

    West Bakr 100% Working Interest, Operated  2014 Plan  17 wells  Waterflood optimization  Facility upgrades and optimization  YTD drilled 1 well  1 oil well K (100% success) Production in January 2014 5,908 Bopd 11

  12. Slide 12: Eastern Desert Drilling History

    Eastern Desert Drilling History 40 2007-2014 West Bakr Current Drilling Totals 30 Producing Wells West Gharib Oil Wells 135 20 West Gharib 81 D&A Wells 19 10 West Bakr 39 Success Rate 88% 0 2007 2008 2009 2010 2011 2012 2013 Total 120 Gross Operated Wells West Gharib West Bakr Eastern Desert Totals

  13. Slide 13: Eastern Desert Inventory

    Eastern Desert Inventory Location Inventory Potential Drilling Locations Concession App/Dev Expl West Gharib 9 3 West Bakr 32 4 NW Gharib 46 33 SW Gharib - 4 SE Gharib - 2 Eastern Desert Totals 87 46 13

  14. Slide 14: Eastern Desert - New Concessions

    Eastern Desert - New Concessions 100% Working Interest, Operated  Effective November 7, 2013  Planning large seismic program for 2014/15 in Egypt NW Gharib  Total program ~ 1,800 km² 3-D & 300 km 2-D  Eastern Desert ~ 1,000 km² 3-D & 300 km 2-D  Western Desert ~ 800 km² 3-D  NW Gharib  2014 P

  15. Slide 15: NW Gharib

    NW Gharib 100% Working Interest, Operated  2014 Plan  Submitted 18 wells for approval  2 rigs (starting Q2, Q3)  Initial wells targeting existing 3-D area around Arta/East Arta  71 million barrels of prospective resource* initially identified  58 million barrels of prospective resource* to be

  16. Slide 16: South Alamein

    South Alamein 100% Working Interest, Operated Boraq  2014 Plan  Contingent on Boraq access West Manar Taef  2013  Drilled West Manar in Jan 2014 (d&a)  Drilled Taef in Nov 2013 (d&a) 16

  17. Slide 17: East Ghazalat

    East Ghazalat 50% Working Interest, Non-Operated  2014 Plan  5 wells North Dabaa Safwa Field  4 shallow Discovery wells (2E and 2D)  1 deeper exploration well in North Dabaa area  Drilling EG#3, Production in January 752 Bopd (376 Bopd to shallow expl TransGlobe) well 17

  18. Slide 18: South Ghazalat

    South Ghazalat 100% Working Interest, Non-Operated North Dabaa  2014/2015 Plan Discovery  Commence 800 km² 3-D seismic program on SW portion of block S Ghazalat - 1,883 square kilometers (465,000 acres) Company to acquire extensive 3D seismic over area prior to drilling 2 exploration commitment we

  19. Slide 19: Yemen

    Yemen Block S-1/ 75 (25% Working Interest); Block 32/ 72 (13.81%/20% Working Interest)  2014 Plan Salsala Exploration Well  Block S-1 on production 50% during 2014 (Guidance)  Block 32  3 wells in 2014  Salsala appraisal  (2 wells) and early development  Tasour development well 19

  20. Slide 20: Roadmap to 40,000 Bopd

    Roadmap to 40,000 Bopd Based on currently identified opportunities and upside predictions, TransGlobe is targeting a production rate of 40,000 Bopd within four years 50,000 Peak Production (Bopd) 40,000 Boraq assumed to be deferred to mid-2015 Production (bopd) Egypt Exploration (Bid Round 8,000 – 1

  21. Slide 21: In Closing

    In Closing  2014 Production guidance 20,000 – 21,000 Bopd  2014 Funds flow guidance of $146 million at 20.5 Mbopd and $100/Brent  Potential to reach 40,000 Bopd within four years  Fully funded from cash flow and working capital  Top tier management team 21

  22. Slide 22: Appendix

    TransGlobe Energy CORPORATION = Appendix TSX: TGL / NASDAQ: TGA

  23. Slide 23: Contact Information

    Contact Information Steve Langmaid Telephone: 403.444.4787 Email: investor.relations@trans-globe.com For additional information please visit Website: www.trans-globe.com 23

  24. Slide 24: 2013 A/R Collections

    2013 A/R Collections  Total Collections in 2013 were ~$275 million (2012, ~$157 mm)  Months outstanding have decreased to ~7 months $000’s Mths $000’s Bopd A/R Balance versus Months Outstanding* A/R Balance versus Production / day* $300,000 12 $300,000 8.5 Mth Avg. 18,000 $250,000 10 $250,000 7 Mt

  25. Slide 25: Three Year (2011 – 2013) Finding and Development Costs

    Three Year (2011 – 2013) Finding and Development Costs Top Tier F&D and Recycle Ratios 3 Yr Weighted 2P 2013E 2012 2011 Average Netback* $19.64 / Bbl $22.08 / Bbl $26.24 / Bbl $22.19 / Bbl $/Bbl F&D $34.78 / Bbl** $4.46 / Bbl $7.07 / Bbl $10.02 / Bbl FD&A $47.96 / Bbl** $7.36 / Bbl $5.24 / Bbl $10.2

  26. Slide 26: Executives and Directors

    Executives and Directors  Robert G. Jennings - Director, Chairman  Ross G. Clarkson - Director, President and CEO  Lloyd W. Herrick - Director, VP and COO  Geoffrey C. Chase - Director  Fred J. Dyment - Director  Gary S. Guidry - Director  Erwin L. Noyes - Director  Randy C. Neely - VP, Fina

  27. Slide 27: Analyst Coverage

    Analyst Coverage  Christopher Brown, Canaccord Genuity, Calgary, Canada  David Phung, Credit Suisse Securities, Calgary, Canada  David Dudlyke, Dundee Securities, London, UK  Stephane Foucaud, First Energy Capital Corp., London, UK  David Popowich, Macquarie Securities, Calgary, Canada  Al Sta

  28. Slide 28: Concession Summary

    Concession Summary Working Concession Size (acres) Year Concession First Production Jan 2014 Concession Interest Gross Net Acquired Type Date Production West Gharib 100% 28,904 28,904 2007 Development January 2000 11,556 NW Gharib 100% 162,000 162,000 2013 Exploration N/A SW Gharib 100% 48,000 48,00

  29. Slide 29: West Bakr – K Field

    West Bakr – K Field New Approach in Legacy Field  Successful deviated drilling has accessed new reserves in deeper pools  Recent wells have identified unswept intervals with additional upside potential 29

TransGlobe Energy — Investor Presentation (February 2014) on 6ix