Alligator Energy Ltd · ASX:AGE

Alligator Energy — 18th GMUSG Conference & Trade Expo 2022

9 slides from Alligator Energy's conference presentation, Aug 18, 2022

  1. Slide 1: 18th GMUSG Conference & Trade Expo

    For personal use only ASX: AGE 18th GMUSG Conference & Trade Expo Andrea Marsland-Smith, COO AUGUST 2022

  2. Slide 2: Disclaimer

    Disclaimer Disclaimer For personal use only This presentation contains projections and forward looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving

  3. Slide 3: Alligator Energy – Corporate

    Alligator Energy – Corporate Our aim is to discover, source and economically extract these needed commodities with an innovative approach, For personal use only with either zero or minimal impact, and with positive value and experience for our stakeholders and communities. • Active in uranium explor

  4. Slide 4: The Samphire Uranium Project - Whyalla

    The Samphire Uranium Project - Whyalla • Historical inferred uranium resource For personal use only - 14.9 Mlbs @ 300ppm cutoff U3O8 at a grade of 654 ppm** (similar to Boss Resources’ Honeymoon Project planned restart average grade). • AGE currently advancing project through: - Resource enhancement

  5. Slide 5: ISR Mining

    ISR Mining 101 2 For personal use only 30m Upper Limb 1 Roll Nose Protore Redox Front Lower Limb 3 4 Roll-front in an open cut mine – Texas 5 GMUSG Conference| 16-18 August 2022 | ASX:AGE

  6. Slide 6: The Samphire Uranium Project: Exploration & development potential

    The Samphire Uranium Project For personal use only Exploration & development potential • Walk up drill targets for extension of known mineralisation at Blackbush − A number of open positions not adequately tested by previous drilling show potential for extensions of the known mineralisation. • Plumb

  7. Slide 7: Samphire Project: Planned Activities and Workflow – 2022/23

    Samphire Project: Planned Activities and Workflow – 2022/23 For personal use only Strong potential for a lower development cost profile − Close to Whyalla (not reliant on an entire FIFO workforce) inc. service providers − Competitive wellfield drilling development costs due to shallow nature of the

  8. Slide 8: The Samphire Uranium Project - Labour and Services

    The Samphire Uranium Project - Labour and Services Services For personal use only • LV & HV maintenance • Aircon • Cleaning • Engineering and Fabrication • Laboratory • Medical • Dangerous Goods Transport • General Freight • Borehole Logging Labour • Administration • Warehouse • Polywelding • Electr

  9. Slide 9: Dr Andrea Marsland-Smith COO

    For personal use only Dr Andrea Marsland-Smith COO +61 (0) 7 3839 3904 ams@alligatorenergy.com.au www.alligatorenergy.com.au 9

Alligator Energy — 18th GMUSG Conference & Trade Expo 2022 on 6ix