GIYANI METALS CORP. [Insert Sub Title - Capital First Letter of Each Word] HIGH PURITY MANGANESE DEVELOPMENT OPPORTUNITY LOW CAPEX April 2021 LOW OPEX BATTERY-GRADE MANGANESE SAFE JURISDICTION TSX.V:EMM
Slide 2: Cautionary Note: Forward Looking Statements
CAUTIONARY NOTE Forward Looking Statements [Insert Sub Title - Capital First Letter of Each Word] This presentation contains forward-looking statements and factual information that are current as of the date the presentation was originally delivered. When used in this presentation, words such as “ma
Slide 3: Compliance Statement: Qualified Persons
COMPLIANCE STATEMENT Qualified Persons [Insert Sub Title - Capital First Letter of Each Word] The scientific, technical, and economic information contained in this presentation relating to the K.Hill Manganese Project are based upon a technical report prepared by Mr. Michael John Beare BEng, CEng, M
Slide 4: Investment Summary Highlights
INVESTMENT SUMMARY Highlights [Insert Sub Title - Capital First Letter of Each Word] • Manganese oxide deposit in Botswana, a supportive mining investment jurisdiction • Robust project economics: 80% IRR and C$442M Post tax NPV10 • Low project capex of C$159M • Feasibility Study due Q3 2021 • Experi
Slide 5: Project Portfolio: Land Package in a Favourable Jurisdiction
PROJECT PORTFOLIO Land Package in a Favourable Jurisdiction [Insert Sub Title - Capital First Letter of Each Word] OWNERSHIP Francistown Zimbabwe 100% interest in an extensive land package covering 2,641km2 in south-eastern Botswana PROJECT PIPELINE Europe & Botswana 3 battery-amenable manganese Pro
Slide 6: K.Hill, Otse & Lobatse: Battery-Grade Manganese Oxide Deposits
PROJECT PORTFOLIO K.Hill, Otse & Lobatse: Battery-Grade [Insert Sub Title Manganese - Capital FirstOxide LetterDeposits of Each Word] Legend K.HILL Railway • Adjacent to the town of Kanye – 45,000 inhabitants Jwaneng Mine (Debswana) Sealed Road • 5km from Trans Kalahari highway connecting South Afri
Slide 7: Project Milestones Achieved
PROJECT MILESTONES ACHIEVED Highlights [Insert Sub Title - Capital First Letter of Each Word] Sep. 2018: Completion of Dec. 2019: Commencement Aug. 2020: Completed high Dec. 2020: Received Mar. 2021: Completed K.Hill K.Hill maiden Mineral of K.Hill Feasibility Study & purity manganese market approva
Slide 8: Non-Metallurgical Manganese
MANGANESE Used in Steel, Specialty[Insert Alloys,Sub Fertilizers, Chemicals Title - Capital and of First Letter Batteries Each Word] MANGANESE ORE AND MANGANESE METAL • 86% of globally mined manganese ore is used in steel making1 • Total global manganese ore consumed in 2018 was 20 Mt1 • Refined / H
Slide 9: Battery Chemistries
BATTERY CHEMISTRIES In The Future Cathode Chemistries Will- Capital [Insert Sub Title Be Differentiated First Letter ofByEach Application Word] Present Future – custom chemistries by application Various NCA NCM811 / LMNO NCM523 NCM622 LFP Ex-China fixed route, short- dominated by NCM long-range vehi
Slide 10: Manganese in Li-ion Batteries
MANGANESE IN LI-ION BATTERIES Manganese containing [Insert cathode Subchemistries willFirst Title - Capital dominate Letter ofthe Eachmarket Word] 2020 2025 2030 NCM LMO LMNO LCO NCA LFP Other Manganese Demand in Lithium-ion Batteries 32,500 140,000 320,000 tonnes tonnes tonnes Source: Benchmark Min
Slide 11: Manganese in Lithium-ion Batteries: Where is the Supply?
MANGANESE IN LITHIUM-ION BATTERIES Where is the Supply? [Insert Sub Title - Capital First Letter of Each Word] • The market balance of high purity manganese required for batteries is forecast to be in a growing deficit • Few announcements have been made of new capacity planned to meet demand Battery
Slide 12: K.Hill Resource Estimate (2020)
K.HILL RESOURCE ESTIMATE (2020) 1.7Mt at 25.7% Manganese [InsertOxide – with Sub Title Significant - Capital Upside First Letter Potential of Each Word] K.Hill Mineral Resource Estimation by Domain Domain Category Tonnes MnO Al2O3 SiO2 Fe2O3 LOI millions % % % % % High-Grade Upper Mn Shale Inferred
Slide 13: K.Hill Project PEA
K.HILL PROJECT PEA Robust Economics Over[Insert a 10 Year Project Sub Title Life First Letter of Each - Capital Word] HIGHLIGHTS1 • Pre tax NPV10 of C$573M (US$431M)2 • After tax NPV10 of C$442M (US$332M)2 • After tax IRR of 80% • C$159M (US$118M)2 Capex • C$6M (US$5M)2 closure cost • Payback within
Slide 14: Making High Purity Manganese
MAKING HIGH PURITY MANGANESE Simple and Low Cost of[Insert Acid Dissolution and Solvent Sub Title - Capital Extraction First Letter of Each Word] Acid DEMONSTRATION PLANT TetraTech appointed for design and engineering of scaled ROM 3-Stage Grinding down Demo Plant, based in Botswana. Operations expe
Slide 15: Demonstration Plant
Demonstration Plant Product sample for potential [Insertend-buyers and de-risking Sub Title - Capital ofofproject First Letter Each development Word] • The Demonstration Plant will replicate the proposed hydrometallurgical process: • To demonstrate the ability to achieve the stringent product specif
Slide 16: Targeting Low Carbon Manganese
TARGETING LOW CARBON MANGANESE 3 Options Considered in[Insert SolarSub Plant Study Title - Capital First Letter of Each Word] ‘No Export’ ‘Net Zero’ ‘Transition to IPP’ Scenario 1 2 3 Export of excess power to No Yes Yes grid? Requires Regulatory No Yes Yes approval Requires capex upgrade to No Yes
Slide 17: K.Hill Project PEA: Visualisations of Open Pit & Processing Plant
K.HILL PROJECT PEA Visualisations of Open Pit & Processing [Insert Sub Title - Plant Capital First Letter of Each Word] Aerial view of the K.HILL Deposit 17
Slide 18: K.Hill Project Timeline: Feasibility Study and ESIA
K.HILL PROJECT Timeline [Insert Sub Title - Capital First Letter of Each Word] Q1 21 Q2 21 Q3 21 Updated Mineral Complete local Finalise capital & Resource & maiden infrastructure & site operating cost FEASIBILITY STUDY Mineral Reserve at K.HIll services optimisation estimates Complete infill and La
Slide 19: Board and Management
BOARD AND MANAGEMENT Proven Record in Mining Company [Insert Management Sub Title - Capital First&Letter Project Delivery of Each BOARD Word] JONATHAN HENRY B.A.(Hons) EUGENE LEE Bcom. JOHN PETERSEN J.D, B.S. MICHAEL JONES C.Eng. Non Executive Chairman Non Executive Director Non Executive Director N
Slide 20: Share Structure
SHARE STRUCTURE Capital Structure and Major [InsertShareholders Sub Title - Capital First Letter of Each Word] TICKER MARKET CAP* SHARE PRICE* 52 WEEK RANGE SHARES O/S TSXV : EMM C$118M C$0.68 C$ 0.08 - 0.87 173,252,734 3 MAJOR SHAREHOLDERS 2 RAB Capital 10.4% Directors and Management 3% 1 MMCAP Ass
Slide 21: High Purity Manganese Peers
HIGH PURITY MANGANESE PEERS Market Battery Grade Resource After-Tax After- Tax Company Project Name Location Opex2 Capex3 Stage Project Life [Insert Sub Title - Capital First Letter of Each Cap1 Product Grade NPV IRR C$M Word] % Mn US$/t US$ US$ 1 % Yrs Giyani Metals HPMSM & 332m K.Hill Botswana 118
Slide 22: Contact Us
CONTACT US TSXV : EMM [Insert Sub Title - Capital First Letter of Each Word] Giyani Metals Corp. 5300 Commerce Court West 199 Bay Street Toronto, Ontario M5L 1B9 Canada info@giyanimetals.com www.giyanimetals.com @GiyaniMetals #GiyaniMetals 22
Slide 23: Appendix - Botswana Africa's Premier Mining Jurisdiction
APPENDIX - BOTSWANA AFRICA’S PREMIER MINING JURISDICTION Economic & Geopolitically Stability [Insert + Mature Sub Title - Capitaland FirstSupportive Mining Sector Letter of Each Word] STABLE ECONOMY TO INVEST IN • Domestic pension fund assets account for 41 per cent of GDP (US$7Bn) with 30% of which
Slide 24: Appendix - Botswana: Specific Economic Advantages
APPENDIX - BOTSWANA AFRICA’S PREMIER MINING JURISDICTION Specific Economic Advantages forTitle [Insert Sub Giyani - Capital First Letter of Each Word] FISCAL ADVANTAGES FOR THE K.HILL PROJECT • One of the most attractive mining jurisdictions in Africa with political stability and transparency1 • Gov
Slide 25: Appendix - Mass Adoption of EVs Imminent
APPENDIX - MASS ADOPTION OF EVS IMMINENT As BEVs Become Price Competitive with [Insert Sub Title ICEVs First - Capital Adoption Letter will Accelerate of Each Word] Over the next decade 130 individual lithium-ion Economies of scale drive down the cost of a Battery Megafactories are planned, which wi
Slide 26: Appendix - From Mine to EV
APPENDIX - FROM MINE TO EV The Lithium-Ion Battery[Insert Supply Chain 1 Sub Title - Capital First Letter of Each Word] 1. Benchmark Mineral Intelligence, new lithium-ion battery supply chain data exposes manganese weaknesses. March 2020 26
Slide 27: Appendix - Manganese in Li-ion Batteries
APPENDIX - MANGANESE IN LI-ION BATTERIES Li-ion Batteries have different types [Insert Sub of -cathode Title chemistries Capital First Letter of Each NCM – THE DOMINANT CATHODE FOR AT LEAST THE NEXT 8 YEARS Word] MANGANESE A SMALL COMPONENT, BUT HERE TO STAY • NCM cathodes are expected to be use in
Slide 28: Appendix - K.Hill Deposit: Mining, Processing and Upside
APPENDIX – K.HILL DEPOSIT Mining, Processing and[Insert UpsideSub Title - Capital First Letter of Each Word] MINING & PROCESSING CHARACTERISTICS North North North North North North Northern Northern portion Northern • Low tonnage mining – 175,000tpa operation Northern portion portion Northern portio
Slide 29: Appendix - K.Hill 2020 Drill Program
APPENDIX – K.HILL 2020 DRILL PROGRAM Program Summary [Insert Sub Title - Capital First Letter of Each Word] Phase 1 – channel chip sampling program along 3 outcropping sections of the ore horizon. Phase 2 – RC drilling verification program where 4-holes will be drilled with an RC rig as twins of pre