Alligator Energy Ltd · ASX:AGE
Alligator Energy — South Australian Exploration & Mining Conference 2022
16 slides from Alligator Energy's conference presentation, Dec 2, 2022
Slide 1: Samphire Uranium Project
For personal use only ASX: AGE Samphire Uranium Project SOUTH AUSTRALIAN EXPLORATION & MINING CONFERENCE – DECEMBER 2022
Slide 2: Disclaimer
Disclaimer For personal use only Disclaimer This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving
Slide 3: Alligator Energy – Vision and working with Stakeholders
Alligator Energy – Vision and working with Stakeholders For personal use only Alligator Energy is a responsible and progressive uranium and energy metals explorer and emerging producer Shareholders We look at our business activities through the eyes of our stakeholders: • From a shareholder viewpoin
Slide 4: Alligator Energy – Strategy
Alligator Energy – Strategy For personal use only • Advance Samphire Uranium Project through resource enhancement, evaluation, field recovery trial and pilot testwork, approvals and pre-development into production • Identify and test highly prospective exploration targets in the Alligator Rivers Ura
Slide 5: Uranium Market Update
Uranium Market Update Key Uranium and Nuclear market related events over the past year For personal use only • Uranium spot price US$43.50 per lb U3O8 at start of year– currently around US$50.25 per lb. • Continued Sprott Uranium Fund buying, Russian invasion of Ukraine and associated sanctions drov
Slide 6: Uranium Project Overview
Samphire Uranium Project Overview • Mineral Resource of 14.8Mlbs U3O8 at 250ppm cut-off, 666ppm average grade For personal use only • Coherent multi-level high-grade zones with cumulative strike length of >2.7km and width between 300-450m • Multiple open positions not adequately tested – first drill
Slide 7: Project – Initial Mineral Resource at Blackbush
Samphire Project – Initial Mineral Resource at Blackbush Strong Resource Growth Potential, Extension Drilling Commenced • Mainly coffinite uranium mineralisation For personal use only • Historical drilling by UraniumSA, plus AGE undertook 14 sonic cored holes and 39 rotary mud holes • Assay data, PF
Slide 8: Uranium Project – lithologies and mineralised horizons
Samphire Uranium Project – lithologies and mineralised horizons Blackbush Deposit Geology For personal use only • Kanaka Beds (ISR Amenable) • Host to Samphire Uranium Mineralisation ANSTO carrying out leach and extraction testwork – final report imminent – results have been very consistent with our
Slide 9: Project – Extension Drilling Commenced
Samphire Project – Extension Drilling Commenced Highlights of latest drilling – highest grade results found to date For personal use only 9 Investor Update | December 2022 | ASX:AGE
Slide 10: Local and district-scale potential
The Samphire Uranium Project Local and district-scale potential For personal use only • Walk up drill targets for extension of known mineralisation at Blackbush − Open positions not adequately tested by previous drilling show potential for extensions of the known mineralisation − 100+ hole infill an
Slide 11: Project: Planned Activities and Workflow – 2022/23
Samphire Project: Planned Activities and Workflow – 2022/23 For personal use only Samphire Uranium Project 2022 2023 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Resource Update ANSTO Testwork Uranium Leach & Ion Exchange Studies Scoping Study Drilling Inferred- indicated conversion Step out & exploration Ground Gravity
Slide 12: Project Status
The Samphire Uranium Project - Status 2022 Achievements For personal use only ✓ Historical rehab of old drilling areas prior to any work commencing ✓ First sonic core and rotary mud drilling program at Blackbush ✓ Engagement with pastoralists on rangeland improvement and access for future work ✓ Wor
Slide 13: Alligator Energy - ESG in practice
Alligator Energy - ESG in practice Alligator Rivers: For personal use only • Over 35 indigenous employees on drilling and exploration programs over 10 years • On country work and support for indigenous ranger groups – even when not exploring • Nabarlek North agreement – potential for TO groups to be
Slide 14: For personal use only
For personal use only ASX: AGE Thanks to our shareholders and Board, indigenous groups, communities, and Greg Hall CEO particularly our employees +61 (0) 7 3839 3904 gh@alligatorenergy.com.au www.alligatorenergy.com.au
Slide 15: Project – Initial Mineral Resource at Blackbush
Samphire Project – Initial Mineral Resource at Blackbush Targeting In-Situ Recovery – September 2022 For personal use only Initial High Grade ISR Mineral Resource Estimate of 14.8Mlbs at 666ppm U3O8 • Combined Inferred and Indicated from 10Mt @ 666 ppm U3O8 at 250ppm cut-off grade for the Blackbush
Slide 16: ASX References and Statements
ASX References and Statements Reference Date Announcement Link For personal use only 2924-02480654-2A1353533 (markitdigital.com); 2924-02503799-2A1365315 (markitdigital.com) and 2924- 0. 31 January, 29 March and 10 May 2022 Alligator Energy – Samphire Drilling Results reported to ASX 02520049-2A1373
Alligator Energy — South Australian Exploration & Mining Conference 2022 on 6ix