Far East Energy — Proxy Contest (November 2006)
25 slides from Far East Energy's proxy contest presentation, Nov 6, 2006
Slide 1: Schedule 14A Proxy Statement
UNITED STATES SECURITIES & EXCHANGE COMMISSION Washington, DC 20549 SCHEDULE 14A Proxy Statement pursuant to Section 14(a) of the Securities Exchange Act of 1934 Filed by the Registrant þ Filed by a Party other than the Registrant ¨ Check the appropriate box: ¨ Preliminary Proxy Statement ¨ Confiden
Slide 2: Corporate Presentation November 2006
Corporate Presentation November 2006
Slide 3: Cautionary Statements
Cautionary Statements • Far East Energy is scheduled to hold its 2006 annual meeting of stockholders on December 15, 2006, and filed a definitive proxy statement with the Securities and Exchange Commission on October 27, 2006 in connection with the meeting. Our stockholders are strongly advised to r
Slide 4: FEEC Profile
FEEC Profile Far East Energy Corporation (FEEC) headquartered in Houston, Texas, with offices in Beijing, Kunming and Taiyuan, China, is the 3rd largest coalbed methane acreage holder in China, with over 1.3 million acres in the Shanxi and Yunnan Provinces through agreements with ConocoPhillips and
Slide 5: Key Investment Highlights
Key Investment Highlights 2 Approximately 1.3 million acres (5,250 km ) in China’s coal rich Shanxi Province and Yunnan Province Situated near the two major national pipelines running to Beijing and Shanghai Shanxi Provincial government’s commitment to 1,080-mile pipeline network, a portion of which
Slide 6: Management and Directors
Management and Directors Management Michael R. McElwrath, Chief Executive Officer, President and Director formerly Acting Assistant Secretary of Energy Bruce N. Huff, Chief Financial Officer, Secretary and Treasurer formerly President and Chief Operating Officer of Harken Energy Garry Ward, Senior V
Slide 7: Corporate Overview
Corporate Overview Third largest CBM acreage holder in China with over 1.3 million acres CBM Partners with ConocoPhillips and China United Coalbed Methane Corp. Ltd. (“CUCBM”) Based in Houston, Texas with offices in Beijing, Taiyuan and Kunming Currently dewatering three horizontal multi-lateral wel
Slide 8: Shanxi Province
Shanxi Province Source: Oil and Gas Investor 7
Slide 9: Shanxi Project
Shanxi Project 1,057,638 Acres (4,280 km2) National and intra- province pipelines in close proximity 66.5% participating interest potential Source: Oil and Gas Investor FEEC Wells HZ01, HZ02, Drilling and Dewatering HZ03 and HZ04 in Activities Shouyang Block 8
Slide 10: Shanxi Intra-Provincial Pipeline Planning Map
Shanxi Intra-Provincial Pipeline Planning Map • Shanxi Intra-Provincial Pipeline connecting FEEC acreage to major pipelines and metropolitan areas in Shanxi Province. • SY represents FEEC’s Shouyang Block • QN represents FEEC’s Qinnan Block Source: Natural Gas Corporation of Shanxi Province 9
Slide 11: Shanxi Production Sharing Contract
Shanxi Production Sharing Contract Production Sharing Contract (PSC) with China United Coalbed Methane Co. (CUCBM) government partner Far East Energy is Operator ConocoPhillips holds a 3.5% ORRI 30-year term in three phases: Exploration, development, production Far East Energy commits to exploration
Slide 12: Uncommonly High Perm and Gas
Uncommonly High Perm and Gas • With our first horizontal wells, we believe we have discovered an uncommon combination of high permeability/high gas content. • High permeability in conjunction with high gas content and sufficient pressure generally results in higher gas production rates sustainable o
Slide 13: High Perm/Gas = Higher Production Sustainable Over Longer Period
High Perm/Gas = Higher Production Sustainable Over Longer Period • The key to making high permeability work to our advantage and to achieving maximum production at the earliest possible date is to drill a pattern of additional wells in the area of our first wells as rapidly as possible. • Australia’
Slide 14: ConocoPhillips Shanxi Data
ConocoPhillips Shanxi Data Shanxi Analysis • Significant amount of well data available • Ash content, isotherm data, and gas content measurements for several wells in the region • Three seismic profiles analyzed for each block covering areas of no well control • Three main coal seams identified and
Slide 15: Recent Developments
Recent Developments Drilling Evaluation of First Three Horizontal Wells: HZ01 HZ02 HZ03 Month & year spudded Jun 2005 Dec 2005 Apr 2006 Total days (including standby, drilling, 120 75 43 completion, fishing and mobilization) Horizontal extent 8,200 ft. 8,850 ft. 1,075 ft. Finding: drilling costs wer
Slide 16: Resource Comparison
Resource Comparison How does the Company’s Shanxi acreage compare with select U.S. CBM Basins? San Juan Black Warrior Raton Shanxi Acreage Coal Gas Content (Scf/ton) * 400-500 400-500 300-500 400-800 Coal Thickness: Typical net coal (feet) * 40 5 20 25-30 Pressure (psi) * 1500 400 400 450 Permeabili
Slide 17: China
China Average GDP growth of over 9% during the last decade World’s 2nd largest energy consumer Approximately 70% of China’s 34 Provinces suffered large scale electricity shortages in 2004 China ranks second in the world in carbon emissions China must increase energy supply while combating pollution
Slide 18: CBM Addresses Energy Shortage and Environment
CBM Addresses Energy Shortage and Environment Conventional gas – onshore gas results somewhat disappointing CBM Supply – China’s CBM resources estimated to be 1100 TCF (Source: China United Coalbed Methane Corporation, Ltd.) Clean – burns substantially cleaner than coal Environmental benefit – net r
Slide 19: China Macro Gas Markets
China Macro Gas Markets CBM receives favorable royalty treatment Market price vs. government established price Reported average of $6.65 per Mcf, with a higher range of prices for residential, commercial and industrial terminals Pipeline tariff approximately $1.60 Mcf per 600 miles Potentially highe
Slide 20: Investor Relations Contacts
400 N. Sam Houston Parkway Suite 205 Houston, Texas 77060 Main Number: 832-598-0470 www.fareastenergy.com OTCBB: FEEC Investor Relations Contacts: Bruce N. Huff, Chief Financial Officer David Nahmias, Investor Relations
Slide 21: Drilling Commences in Shouyang Block
Drilling Commences in Shouyang Block Spudding Ceremony for FEEC’s First Horizontal Well Project in the 20 Shanxi Province - June 2005
Slide 22: Appendix (Shanxi Project)
Appendix (Shanxi Project) Location data for over 850 wells in Qinnan area; 165 wells in Shouyang area Tops and thickness data for 678 wells in Qinnan area; 136 wells in Shouyang area • Shouyang wells clustered in north part of block; Qinnan wells clustered in east part of block Ash content, isotherm
Slide 23: Appendix (Shanxi Project)
Appendix (Shanxi Project) Geologic evaluation has identified three prospective areas within the Shouyang and Qinnan Blocks from 900-3000 ft (300 to 1000 meters) in depth • Shouyang North Area 204,335 acres total (827 Km²); 82,710 acres (334 Km²) within well control area • Qinnan East Area 113,904 ac
Slide 24: Shanxi Project
Shanxi Project Contract Area: 1,057,000 acres (4,280 Km²) Participating Interests: Exploration: Far East Energy 100% Development: COP has a 3.5% ORRI* Far East 70%-100% costs and 66.5%-96.5% of production COP 3.5% ORRI CUCBM 0%-30% WI** * ConocoPhillips (COP) has elected a 3.5% ORRI (out of FEEC int
Slide 25: Yunnan Projects at a Glance
Yunnan Projects at a Glance Two large CBM projects 159,000 - 265,000 net acres Partners with CUCBM E&P costs reimbursed to FEEC from initial production revenues Source: Oil and Gas Investor 24