Tellurian — Investor Presentation (October 2017)
20 slides from Tellurian's investor presentation, Oct 10, 2017
Slide 1: Corporate presentation October 2017
Corporate presentation October 2017 Exhibit 99.1
Slide 2: Cautionary statements
Cautionary statements Forward looking statements Section 27A of Act of 1934, statements. Th “forecast,” “initial margins. ; Reserves and resources ING, fuk ts fi results, rates of ret latory and acquisition. devel ts ic it The by ingstat Factors” section of Exhibit99.1 ihe au :C") on March 15, 201 l
Slide 3: Introduction: Building a low-cost global natural gas business
$60 million $25 million $207 million Merger Acquisition February April August December January February June September Charif Souki and Martin Houston establish Tellurian Management, friends and family invest $60 million Meg Gentle joins to lead the company as President & CEO GE invests $25 million
Slide 4: New liquefaction capacity required
New liquefaction capacity required Sources: ICE via Marketview, Kpler, Wood Mackenzie, Platts and Tullet Prebon, Fearnleys, Tellurian Research. Notes: (1) Effective capacity is defined as total capacity less unplanned outages and gas constraints. Implied utilization rates assume demand growth of 12%
Slide 5: Daily supply readily available across the globe
Sources:Kpler, Maran Gas, IHS, Wood Mackenzie. Notes: LNG storage assumes half of fleet is in ballast, 2.9 Bcf capacity per vessel. Average cargo size ~2.9 Bcf, assuming 150,000 m3 ship. In 2017, approximately a third of all LNG cargoes are estimated to be spot volumes. Assumes 12% per annum demand
Slide 6: Building a low-cost global gas business
Building a low-cost global gas business Business model Pipeline Liquefaction Marketing Upstream Purchase low-cost gas at liquidity points or as reserves Diversify gas supply Develop pipeline solutions for constrained production basins Maximize access to supply liquidity Develop low-cost liquefaction
Slide 7: Business model
Business model Tellurian Marketing Driftwood Holdings Driftwood LNG terminal Driftwood pipeline Tellurian Production Company Customers Business model Tellurian will offer equity interest in Driftwood Holdings Driftwood Holdings will consist of Tellurian Production Company, Driftwood pipeline and Dri
Slide 8: Business model: total cost of ~$3/mmBtu
Business model Sources: Wood Mackenzie, Platts, Tullet Prebon, Tellurian Research. Notes: (1) Drilling and completion based on well cost of $10.2 million, 15.5 Bcf EUR, and 75.00% net revenue interest (“NRI”) (8/8ths). (2) Gathering, processing and transportation includes transportation cost to Drif
Slide 9: Illustrative financials
Illustrative financials Business model Notes: (1) Phase 1 reflects 1 berth / 2 tanks and full development reflects 3 berths / 3 tanks.(3) Per share amounts based on 211 million shares outstanding as of August 9, 2017 as reported in latest 10-Q. (2) Resource need for 30 year period. Scenario Phase 1(
Slide 10: Driftwood vs. competitors – cost per tonne
Driftwood vs. competitors – cost per tonne Business model Sources: Wood Mackenzie, The World Bank, Tellurian Research. Notes: (1) The World Bank bases the Logistics Performance Index (LPI) on surveys of operators to measure logistics “friendliness “ in respective countries which is supplemented by q
Slide 11: Integrated model prevalent internationally
Integrated model prevalent internationally Business model Source: IHS. Projects include: Australasia APLNG, Darwin, GLNG, Gorgon, Ichthys, NWS, Pluto, Northwest Shelf, QCLNG, Wheatstone, PNG LNG, Tangguh, Brunei LNG, Donggi-Senoro, MLNG, Yamal LNG Mideast/Africa Angola LNG, EG LNG, Damietta, ELNG, Y
Slide 12: Tellurian Production Company objectives
Tellurian Production Company objectives Tellurian Production Company Experienced upstream team joined in May 2017 Acquire and develop long life, low-cost natural gas resources Low geological risk Scalable position Production of 1.5 Bcf/d starting in 2022 Total resources of ~15 Tcf Operatorship Low o
Slide 13: Haynesville acquisition
Haynesville acquisition Tellurian signed a PSA with a private seller to purchase 9,200 net acres in the Haynesville shale for $85.1 million Haynesville acreage provides low development risk, favorable economics and close proximity to significant demand growth Target is to deliver gas for $2.25/mmBtu
Slide 14: Driftwood LNG terminal and pipeline
Driftwood LNG terminal and pipeline Driftwood LNG terminal Land ~1,000 acres near Lake Charles, LA Capacity ~27.6 mtpa(1) Trains Up to 20 trains of ~1.38 mtpa each Chart heat exchangers GE LM6000 PF+ compressors Storage 3 storage tanks 235,000 m3 each Marine 3 marine berths Capex ~$500 – 600 per ton
Slide 15: First LNG vessel chartered
First LNG vessel chartered Charter: Six-month time charter Vessel owner: Maran Gas Maritime Inc. Vessel: Maran Gas Mystras Vessel size: 160,000 m3 Propulsion: Tri-fuel diesel electric (TFDE) Expect to deliver LNG cargoes to global customers by year end 2017 LNG marketing LNG marketing
Slide 16: Conclusions
LNG demand is growing at 12% per annum(1) Netback LNG prices to the U.S. Gulf Coast of > $5.50/mmBtu have signaled that additional liquefaction capacity is needed The U.S. is best positioned to meet these supply needs with access to abundant low-cost gas and a track record of building low-cost lique
Slide 17: Contact us
Amit Marwaha Director, Investor Relations & Finance +1 832 485 2004 amit.marwaha@tellurianinc.com Contact us Joi Lecznar SVP, Public Affairs & Communication +1 832 962 4044 joi.lecznar@tellurianinc.com @TellurianLNG Contacts
Slide 18: Additional detail
2017 Additional detail
Slide 19: Haynesville type curve comparison
Haynesville type curve comparison Comparative type curve statistics Peer B Peer D Peer A Peer C Tellurian Source:Company investor presentations. Notes:(1) Assumes 75.00% net revenue interest (“NRI”) (8/8ths). (2) Assumes gas prices of $3.00/mcf based on NRI and returns published specific to each ope
Slide 20: Illustrative financials – additional detail
Illustrative financials – additional detail Business model Notes: (1) Phase 1 reflects 1 berth / 2 tanks and full development reflects 3 berths / 3 tanks. (2) Resource need for 30 year period. Scenario Phase 1(1) Full development(1) Capacity, mtpa 11.0 27.6 Plant cost, $ per tonne 685 546 Upstream r