Montage Gold Corp. · TSX:MAU

Montage Gold — Technical Presentation (November 2026)

127 slides from Montage Gold's technical presentation, Nov 13, 2026

  1. Slide 1: Site Visit Presentation

    TSX MAU OTCQX MAUTF montagegold.com SITE VISIT PRESENTATION Pathway to executing on our goal of creating a premier multi-asset African gold producer, commencing with our Koné mine NOVEMBER 2026

  2. Slide 2: Disclaimer

    DISCLAIMER FORWARD-LOOKING INFORMATION This presentation contains “forward-looking information” (referred to herein as “forward-looking statements”) under the provisions of applicable Canadian securities legislation regarding Montage and the mineral properties of Montage located in Côte d'Ivoire and

  3. Slide 3: Our Portfolio

    OUR PORTFOLIO Creating a premier multi-asset African gold producer KONÉ MINE Production Stage ▪ Ongoing initiatives to increase production above 300kozpa1 ▪ On-budget and ahead of schedule, with first gold pour achieved in September 2026 through the oxide circuit ▪ Ramp-up to commercial production i

  4. Slide 4: Key Takeaways

    KEY TAKEAWAYS Executing on our strategy of creating a premier multi-asset African gold producer and delivering value for all our stakeholders First gold pour from the oxide circuit in late Q3-2026; Plant is already Koné mine operating above nameplate capacity of 11Mtpa; Ramp-up to ramp up commercial

  5. Slide 5: Site Visit Itinerary and Table of Contents

    SITE VISIT ITINERARY AND TABLE OF CONTENTS Table of Contents Section 1 WEST AFRICA INSIGHTS 6 Section 2 KONÉ MINE 17 Section 3 DIDIEVI PROJECT 87 WENDÉ ADVANCED GREENFIELD Section 4 98 PROPERTY OTHER EXPLORATION AND Section 5 106 PARTNERSHIPS Section 6 APPENDIX 117 5

  6. Slide 6: Section 1: West Africa Insights

    Section 1: WEST AFRICA INSIGHTS

  7. Slide 7: Production Growth

    PRODUCTION GROWTH West Africa is the fastest-growing gold producing region globally +102% West African gold production growth 16Moz Côte d’Ivoire Mali Guinea Other 14% West Africa Production Burkina Faso Senegal Ghana % of Mine Supply Growth (2013 – 2025) 14Moz 12% +421% West African Mine Supply (ou

  8. Slide 8: Production by Country

    PRODUCTION BY COUNTRY West Africa is the largest global gold producing region Annual gold production by region West Africa has become the In millions of ounces, for 2025 largest gold producing region globally due to its significant 16.0Moz exploration potential and Senegal favorable mining regimes G

  9. Slide 9: Discoveries by Country

    DISCOVERIES BY COUNTRY West Africa ranks 1st for discoveries over past decades Gold discoveries by region The West African region is For the period between 2010-2024 (In millions of ounces) significantly under-explored compared to other regions 70 West Africa Moz Ecuador 38.8Moz Canada 37.3Moz #1 Ra

  10. Slide 10: Discovery to Production

    DISCOVERY TO PRODUCTION Côte d’Ivoire boasts the quickest timelines from discovery to production Discovery to production by country The West African region is supportive of extractive industries Average lead time to production since 1990 10 given the importance to West African economies Cote d’Ivoir

  11. Slide 11: Côte d'Ivoire in Context

    CÔTE D'IVOIRE IN CONTEXT Among the fastest growing African economies ECONOMY POLITICAL 32.9m 11.2m $25.6 B Strong international ties through memberships Population Labor Force 2024 Exports of ECOWAS, United Nations, the African Union, Cocoa 27.1% and the regional West African Economic and Monetary U

  12. Slide 12: Ivorian Mine Construction Benchmarking

    IVORIAN MINE CONSTRUCTION BENCHMARKING Koné will be the largest gold mine in Côte d’Ivoire Koné Abujar Lafigué Ity Yaouré Tongon Bonikro Agbaou Séguéla Sissingué Plant Initial Capacity 11.0 Mtpa Potential to improve with process plant design enhancements 5.4 Mtpa 4.0 Mtpa 4.0 Mtpa 3.8 Mtpa 3.6 Mtpa

  13. Slide 13: Benchmarking Across West African Mines: Strip Ratio

    BENCHMARKING ACROSS WEST AFRICAN MINES Koné low strip ratio is a key advantage Benchmarking across West African mines INSIGHTS: Head Grade, Strip Ratio, Strip-Adjusted Grade, g/t of ore waste:ore g/t moved (ore+waste) › Koné ranks at the low end of Koné LOM Segilola Segilola 3.19 1.18 0.46 operating

  14. Slide 14: Benchmarking Across West African Mines: Unit Costs

    BENCHMARKING ACROSS WEST AFRICAN MINES Koné soft ore and scale drive lower unit costs Benchmarking across West African mines INSIGHTS: Ore Hardness, Processing Rate, AISC per Tonne Processed Bond work index in kWh/t Mtpa › Koné ore takes less power to grind Koné LOM 10.7 Tarkwa 14.9 Koné LOM 21.5 Na

  15. Slide 15: Koné Mine Benchmarking

    KONÉ MINE BENCHMARKING Provides a foundation upon which to build a major gold company Benchmarking across West African mines AISC, $/oz 2,750 Bibiani Damang 2,500 Akyem Agbaou Tongon Koné will rank as a 2,250 high quality West Sissingue Mana Siguiri African mine once in Iduapriem Asanko Obuasi Tarkw

  16. Slide 16: Koné Mine Benchmarking: Production Scale

    KONÉ MINE BENCHMARKING Koné is one of the largest gold mines recently put into production Average annual production for gold mines in construction 353koz Single asset company Potential to increase with Multi-asset company higher grade discoveries 301koz 280koz 257koz 260koz 240koz 200koz 200koz 184k

  17. Slide 17: Section 2: Koné Mine

    Section 2: KONÉ MINE

  18. Slide 18: Koné Mine Section Contents

    KONÉ MINE Section contents 1 Koné mine snapshot 2 Mining 3 Oxide circuit 4 Hard-rock comminution circuit 5 Exploration 6 Key infrastructure 7 Environmental, social and governance 18

  19. Slide 19: Koné Mine History

    1 KONÉ MINE HISTORY New management appointed in February 2024 2008 -2016 2017 -2020 2020 -2022 2024 + 2008: Application for Koné 2017: Orca Gold acquires 2020: Montage Gold IPOs on TSX.V; Jan 2024: Updated Feasibility Study exploration permit submitted Koné exploration permit from Conducted 20,000 m

  20. Slide 20: Koné Mine Snapshot

    1 KONÉ MINE SNAPSHOT Long-life and low AISC asset of scale 16 years 301,000oz Mine Life based on Avg. Production the 2024 UFS (Yrs. 1-8) in 2024 UFS 4.9Moz +29% 6.3Moz 2024 M&I Resources1 2026 M&I Resources2 (2 Deposits) (12 Deposits) 4.0Moz 2.0Moz Probable Reserves1 2026 Inf. Resources2 M&I: 0.78Mo

  21. Slide 21: Koné Mine Site Layout

    1 KONÉ MINE SITE LAYOUT Existing infrastructure provides a favorable mine location Water Grid power In-pit tailings pipeline streamlines disposal to run alongside permitting & after year 8 the haul road reduces mitigates risk sustaining capital MAGNIFIED VIEW 21

  22. Slide 22: Koné Mine Production Profile

    1 KONÉ MINE PRODUCTION PROFILE Long-life and low AISC asset of scale 2024 Updated Feasibility Study life of mine plan See next page for ongoing initiatives to improve production profile Current mine plan is only based on the Koné and Production AISC ($/oz) Head Grade (g/t) Gbongogo Main deposits in

  23. Slide 23: Koné Mine Initiatives to Unlock Value

    1 KONÉ MINE INITIATIVES TO UNLOCK VALUE Higher-grade material whilst improving flexibility and efficiencies Integration of higher-grade material Strategic operational flexibility from the onset of production with improved efficiency Higher-Grade Grade Control Owner Oxide Process Plant Discoveries Dr

  24. Slide 24: Capital Costs

    1 CAPITAL COSTS Benefiting from existing infrastructure and minimal relocation Koné mine capital cost breakdown Construction budget and spend (Figures as published in Q3-2026 Financials2) Processing Plant Contingency $8m Capital Disbursed as at 30-Sep-26 $22m $25m Mining $19m Capital Committed $25m

  25. Slide 25: Workforce and Training

    1 WORKFORCE AND TRAINING Montage rapidly ramped-up construction activities Employees Contractors INSIGHTS: Total workforce Hours worked Training hours completed 14.4M hrs 26.1k hrs › Montage rapidly ramped up +420 ppl 2.4M hrs 3.6k hrs construction of the Koné mine due to the availability of +35 ppl

  26. Slide 26: First Gold Pour Achieved in Q3-2026

    1 FIRST GOLD POUR ACHIEVED IN Q3-2026 Hard-rock comminution circuit on schedule for completion in Q2-2027 Work Stream Q1-25 Q2-25 Q3-25 Q4-25 Q1-26 Q2-26 Q3-26 Q4-26 Q1-27 Q2-27 Tailings Dam & Water Dams Tailings Dam * * * * Water Storage & Dam * * Construction Power Supply * * * * * Site Infrastruc

  27. Slide 27: Koné Mine Pit Sequencing

    2 KONÉ MINE PIT SEQUENCING Higher-grade satellites to be integrated into a new LOM SOURCE PROBABLE RESERVES1 M&I RESOURCES2 INFERRED RESOURCES2 KONÉ 1 Mining of oxide ore 3.52Moz 4.63Moz 1.26Moz commenced in August 2026 164Mt @ 0.67 g/t Au 210Mt @ 0.69 g/t Au 75Mt @ 0.52 g/t Au GBONGOGO MAIN 2 Minin

  28. Slide 28: Koné Pit Mining

    2 KONÉ PIT MINING Oxide ore mining ongoing whilst grade control drilling Koné Oxide Ore Mining A Grade Control Drilling To ROM Pad A’ Note: Facing North. Section line marked as A-A’ is an approximation for visual representation. Refer to the image overleaf for further details. 28

  29. Slide 29: Koné Deposit

    2 KONÉ DEPOSIT Grade control derisked the first 18 months of production Koné deposit 2025 drilling intercepts INSIGHTS: › Koné deposit M&I Resources have increased by 292koz to 4.63Moz while Inferred Resources have increased by 859koz to 1.26Moz, as compared to the 2024 UFS › Koné deposit maiden Mea

  30. Slide 30: Koné Deposit Cross Section

    2 KONÉ DEPOSIT Simple, wide orebody with low strip ratio Koné deposit cross section looking northeast INSIGHTS: 500 metres › True width >300 metres › Low-cost, low-risk bulk mining › Clean metallurgy with low reagent consumption › LOM strip ratio of 1.01:1 under the Updated Feasibility Study › Soft

  31. Slide 31: Gbongogo Main Deposit

    2 GBONGOGO MAIN DEPOSIT High-grade satellite pit with a derisked production start Gbongogo Main deposit recent intercepts INSIGHTS: › Current resources: 783koz M&I at 1.51 g/t Au and 41koz Inferred at 1.08 g/t Au › Added since the 2024 UFS: +263koz M&I and +41koz Inferred › The Gbongogo Main drill p

  32. Slide 32: Gbongogo Main Deposit Grade Distribution

    2 GBONGOGO MAIN DEPOSIT Significantly enhanced grade distribution resolution 2024 UFS “MIK” Resource Block Model 2026 “OK” Resource Block Model INSIGHTS: › The transition from a Multiple Indicator Kriging (“MIK”) resource estimation model to Ordinary Kriging (“OK”) modeling has improved local estima

  33. Slide 33: Koné Mine Exploration Potential

    2 KONÉ MINE EXPLORATION POTENTIAL +375,000 metres of drilling since the 2024 FS was published Koné permitted exploration land package Exploration since the 2024 FS: › Approximately 375,000 meters1 drilled since the 2024 Feasibility Study, in addition to the 118,525 metres completed prior, focused on

  34. Slide 34: Wheaton Stream

    2 WHEATON STREAM Exploration upside retained as stream is only on two deposits Wheaton Stream Area of Interest INSIGHTS: › Area of Interest is the Koné and Gbongogo deposits, based on a US$2,500/oz pit-shell, plus a 500-metre boundary › Montage retains significant exploration upside as more than 50

  35. Slide 35: Owner-Operated Mining Solution

    2 OWNER-OPERATED MINING SOLUTION Optimizing through an owner-operated mining strategy INSIGHTS: › Owner-mining model selected to optimize long-term costs and maintain optimal mine-planning flexibility, positioning Montage to cost-effectively and efficiently leverage its significant exploration optio

  36. Slide 36: Simplified Processing Flowsheet

    3 SIMPLIFIED PROCESSING FLOWSHEET Nameplate capacity of 11.0 Mtpa on both circuits Oxide Circuit 36

  37. Slide 37: Process Plant Optimizations

    3 PROCESS PLANT OPTIMIZATIONS Process plant design enhancements already implemented UFS Processing Plant Parameters1 Subsequent Optimizations Primary and closed-circuit secondary crushing using a gyratory Primary crusher has been upgraded with 33% extra power crusher Metso 54/75 and two cone crusher

  38. Slide 38: Koné Mine Oxide Circuit

    3 KONÉ MINE OXIDE CIRCUIT Improving flexibility and simplifying stockpile management Field of view overleaf Oxide Circuit Benefits Brought forward the first gold pour and potential to reduce peak funding by commissioning the oxide circuit ahead of completing the hard rock comminution circuit Enhance

  39. Slide 39: Key Processing Plant Infrastructure

    3 KEY PROCESSING PLANT INFRASTRUCTURE Overview of the processing plant area Substation Oxide Sizer Event Ponds Storage Sheds Classification Ball Mill Water Services Tailings Thickener Gold Room and Electrowinning Pre-Leach Thickener CIL Trains Reagents Note: Photos as of October 2026, unless otherwi

  40. Slide 40: Oxide Circuit Infrastructure

    3 OXIDE CIRCUIT INFRASTRUCTURE Ability to process oxide ore and optimize stockpile management Oxide Sizer and Conveyor to Ball Mill Ball Mill and Classification CIL Tanks Gold Room and Electrowinning Note: Photos as of October 2026, unless otherwise stated 40

  41. Slide 41: Oxide Circuit Ramp-Up

    3 OXIDE CIRCUIT RAMP-UP Ramp-up on track; Commercial production expected in Q4-26 Plant throughput, % of 11Mtpa nameplate INSIGHTS: › Mining ramping up as planned October average +90% – Mining commenced in late August 2026, with ore mined Last week of October reaching 2,333kt in October 104% – Low s

  42. Slide 42: Hard-Rock Circuit Layout

    4 HARD-ROCK CIRCUIT LAYOUT Plant layout and construction update Hard-rock comminution circuit On schedule and on budget for completion in Q2-2027 Crushing and screening: SMP works underway at both crushers and secondary screening HPGR: concrete pours ongoing; building cladding and installations adva

  43. Slide 43: Hard-Rock Comminution Circuit

    4 HARD-ROCK COMMINUTION CIRCUIT Plant layout and key stages Ball Mill HPGR Product Stockpile Secondary Screening Secondary Crusher HPGR Area HPGR Oversize Stockpile Primary Crusher Tunnel Primary Crusher Stockpile Reclaim Primary Crusher Note: Photos as of November 2026, unless otherwise stated 43

  44. Slide 44: Hard-Rock Circuit Stages

    4 HARD-ROCK CIRCUIT STAGES On track for completion in Q2-2027 Primary Crusher Secondary Crusher Secondary Screening HPGR Note: Photos as of November 2026, unless otherwise stated 44

  45. Slide 45: Regional Geological Description

    5 REGIONAL GEOLOGICAL DESCRIPTION Koné mine overview REGIONAL GEOLOGY DESCRIPTION › The Koné mine lies within the Birimian Baoulé-Mossi domain of the West African Craton › Structural intersection of the Senoufo belt (hosting Tongon and Wahgnion mines) and the southern extension of the Syama structur

  46. Slide 46: Mineral Reserves and Resources

    5 MINERAL RESERVES AND RESOURCES 11 satellite deposits add higher grade resources Koné Mine – January 2024 Mineral Reserve Estimate1 INSIGHTS: RESERVE OXIDE TRANSITION FRESH TOTAL PIT CLASSIFICATION › Exploration efforts are MT AU G/T AU MOZ MT AU G/T AU MOZ MT AU G/T AU MOZ MT AU G/T AU MOZ focused

  47. Slide 47: Mineral Resources Estimate

    5 MINERAL RESOURCES ESTIMATE 2024 UFS MINERAL RESOURCE ESTIMATE1 2026 UPDATED MINERAL RESOURCE ESTIMATE2 +Add % Chg DEPOSIT RESOURCE CATEGORY Mt Au g/t Au koz Mt Au g/t Au koz Au koz Au g/t Measured Resources - - - 8.6 0.83 229 +229 - Indicated Resources 229 0.59 4,340 200 0.68 4,404 +64 +15% Koné d

  48. Slide 48: Koné Mine Resource Discoveries

    5 KONÉ MINE RESOURCE DISCOVERIES Track record of continuous discoveries at the Koné mine Mineral Resource (koz) Measured & Indicated resource additions (koz) Inferred resource additions (koz) Grade (g/t Au) +1.4Moz Added since the 2024 UFS +29% Growth, 4.9Moz to 6.3Moz +27% Improvement in grade +1.6

  49. Slide 49: Proven Exploration Methodology

    5 PROVEN EXPLORATION METHODOLOGY Exhaustive geological review to rank 50+ exploration targets Ranked exploration target pipeline INSIGHTS: Koné, › Well-established and tested methodology based on a Gbongogo Ore Reserves (2) systematic approach to prioritize exploration efforts by Main weighing geolo

  50. Slide 50: Gbongogo-Koroutou Trend

    5 GBONGOGO-KOROUTOU TREND More than 20 exploration targets along a 15km strike Gbongogo-Koroutou Trend plan view INSIGHTS: › ~15km prospective corridor supported by regional structures and extensive soil anomalies › Regional-scale, deep-seated structure: a resistive, chargeable and magnetic corridor

  51. Slide 51: Gbongogo-Koroutou Trend Gap Zones

    5 GBONGOGO-KOROUTOU TREND Multiple gap zones require further investigation Gap zones remain poorly tested Drilling will target the full trend Exploration results show multiple gap zones along the Further exploration will test extensions of the existing deposits Gbongogo-Koroutou trend that have seen

  52. Slide 52: Gbongogo Main Extensions

    5 GBONGOGO MAIN EXTENSIONS High-grade, thick intercepts identified beyond the pit shell Gbongogo Main cross section INSIGHTS: › Drilling at the Gbongogo Main deposit has targeted deeper drilling on the down-plunge extension of the main quartz-diorite ore body toward the northeast of the deposit › Si

  53. Slide 53: Gbongogo South Deposit

    5 GBONGOGO SOUTH DEPOSIT Intercepts show Gbongogo Main extension potential Gbongogo South cross section INSIGHTS: › ~250 metres south of the Gbongogo Main pit, with direct access to the planned haul road › Recent drilling targeted infill and down-dip extensions of mineralized lenses beneath the curr

  54. Slide 54: Koban North Deposit

    5 KOBAN NORTH DEPOSIT Open along strike and at depth with a northern extension Koban North plan view INSIGHTS: › Shallow depth exploration step-out drilling in an area approximately 300 metres northeast of the Koban North deposits has intercepted mineralization, suggesting the continuity of the mine

  55. Slide 55: Koban North Extension Potential

    5 KOBAN NORTH EXTENSION POTENTIAL Higher grade ore shoots are a focus for further investigation Koban North long section Note: Please refer to disclosures regarding Mineral Reserve and Mineral Resource Estimates in appendix. 55

  56. Slide 56: Soman Deposit

    5 SOMAN DEPOSIT Parallel structures open along strike and at depth Soman plan view INSIGHTS: › The Soman deposit, approximately 1 kilometre, from the main Gbongogo-Koroutou trend hosts a suite of volcano-sediments, with mineralization stretching over a known NE-SW strike of at least 800 metres in le

  57. Slide 57: Soman Deposit Cross Section 1

    5 SOMAN DEPOSIT Soman 1 open down-dip with multiple stacked lenses Soman 1 cross section Note: Please refer to disclosures regarding Mineral Reserve and Mineral Resource Estimates in appendix. 57

  58. Slide 58: Soman Deposit Cross Section 2

    5 SOMAN DEPOSIT Soman 2 open down-dip with multiple stacked lenses Soman 2 cross section Note: Please refer to disclosures regarding Mineral Reserve and Mineral Resource Estimates in appendix. 58

  59. Slide 59: Petit Yao Deposit

    5 PETIT YAO DEPOSIT High-grade satellite within 7km of the Koné processing plant Petit Yao plan view INSIGHTS: › Maiden M&I resource of 102koz at 1.51 g/t Au, and Inferred Resource of 391koz at 1.28 g/t Au reported in June 2026 › Further in-fill and step-out drilling being prioritized on the deposit

  60. Slide 60: Sissédougou Trend

    5 SISSÉDOUGOU TREND Already 6 exploration targets over a 10km trend ANV Area Plan View INSIGHTS: › A highly prospective southwest-northeast mineralized corridor extending over 10km, supported by lithostructural mapping, geophysics, soil anomalies and scout drilling › Birimian sandstones, greywackes

  61. Slide 61: ANV Deposit Extension Potential

    5 ANV DEPOSIT EXTENSION POTENTIAL Stacked lenses extend northeast of the current pit shell ANV cross section A–A’ Note: Based on the January 31, 2025, ANV deposit pits shell. Refer to the press release dated July 21, 2025, for further details. Please refer to disclosures regarding Mineral Reserve an

  62. Slide 62: ANV North Target

    5 ANV NORTH TARGET Scout drilling returns thick, high-grade intercepts ANV North cross section B–B’ Note: Based on the January 31, 2025, ANV deposit pits shell. Refer to the press release dated July 21, 2025, for further details. Please refer to disclosures regarding Mineral Reserve and Mineral Reso

  63. Slide 63: Lokolo Deposits and Targets

    5 LOKOLO DEPOSITS AND TARGETS High-grade intercepts across a 9km long mineralized trend Lokolo Northwest Lokolo targets plan view M&I: 27Koz @ 1.10 g/t Au Inferred: 19Koz @ 1.22 g/t Au INSIGHTS: › Largely untested 9km continuous surface geochemical anomalies over the full Lokolo trend › Lokolo Main

  64. Slide 64: Diouma North & Sena Targets

    5 DIOUMA NORTH & SENA TARGETS Follow-up drill program planned on high grade targets Diouma North section Cross Section: Looking West DIOUMA NORTH INSIGHTS: › Target was discovered by Montage in early 2023, located 2km south of Gbongogo Main, on trend › <500m from haul road; defined as ~200m x 100m q

  65. Slide 65: Yeré North Target

    5 YERÉ NORTH TARGET Marked by a large soil-anomaly trend Yeré North plan view INSIGHTS: › Originally considered as a small oxide target, subsequent drilling has confirmed mineralization in fresh rock allowing for upside potential › M&I Resource of 28koz at 2.03 g/t Au and Inferred Resource of 3koz a

  66. Slide 66: Location, Access, Supply Chain

    6 LOCATION, ACCESS, SUPPLY CHAIN Direct access from Abidjan by paved highway Koné site logistics Port access INSIGHTS: Direct access to port › The Koné mine is located approximately via paved highway 350km northwest of Yamoussoukro, the capital of Côte d'Ivoire › The mine is endowed with abundant wa

  67. Slide 67: Site Infrastructure Overview

    6 SITE INFRASTRUCTURE OVERVIEW Mine site layout N Koné South Pit Magazine Storage A5 National Road Gbongogo Haul Road Civils Yard Core Shed Water Storage Facility Hard-rock Comminution Circuit Oxide Circuit Mine Services Area Main Gate Electrical Substation Wet Process Plant Area Reagents Sheds Admi

  68. Slide 68: Gbongogo Haul Road and Bridge

    6 GBONGOGO HAUL ROAD AND BRIDGE 38km laterite road connecting Gbongogo to the Koné plant 38km INSIGHTS: Gbongogo Pit › The Gbongogo haul road is approximately 38km in length and traverses a sparsely populated area between the Koné and Koné Mill Gbongogo Main deposits › The road has been designed to

  69. Slide 69: River Abstraction

    6 RIVER ABSTRACTION Commissioned and fully operational INSIGHTS: › Water sourced from the nearby Marahoué river, from pit dewatering and a supplementary borefield › The river abstraction facility is located River Abstraction Booster Station approximately 26km north of the Water Storage Facility (“WS

  70. Slide 70: Water Storage Facility

    6 WATER STORAGE FACILITY Sufficient water stored for operations 7.2M m3 Storage Capacity INSIGHTS: › The Water Storage Facility is complete and is already holding water › Total capacity of 7.2 million m3 › Completion of the Water Storage Facility on schedule was a critical path item for 2025, thereb

  71. Slide 71: Site Airstrip

    6 SITE AIRSTRIP Airstrip at Koné to provide access for personnel and supplies 1.5hrs Koné INSIGHTS: › The airstrip has been completed and is Abidjan now fully operational. Aircraft hangar installation is underway and nearing completion › Approval for the construction of the airstrip was received by

  72. Slide 72: Tailings Storage Facility

    6 TAILINGS STORAGE FACILITY TSF facility to be supplemented with an in-pit tailings solution 91Mt LOM Capacity INSIGHTS: › The Tailings Storage Facility (“TSF”) is constructed as a single cell, confined by a cross-valley embankment, with scheduled annual raises › The TSF basin lining of high-density

  73. Slide 73: 225kV Grid Connection

    6 225kV GRID CONNECTION Leveraging Côte d’Ivoire’s natural gas and hydroelectric power INSIGHTS: 20km Koné Mill › The 225kV substation was completed in June 2026 and all transformers have been installed, while the control room is operational. CIE Power Line › The mine was successfully connected to t

  74. Slide 74: Permanent Camp

    6 PERMANENT CAMP Well-equipped camp accommodates 400+ people 400+ person Accommodation INSIGHTS: › The permanent camp construction is complete, with all permanent rooms fully fitted and available for use. Remaining workstreams include landscape gardening, which will advance during the rainy season.

  75. Slide 75: ESG Overview

    7 ESG OVERVIEW Building on the ESG culture set during the exploration phase Village Relocation INSIGHTS: +100 community homes and several community › Montage’s ESG strategy is well aligned services constructed to improve living standards and with the Côte d’Ivoire national empower local entrepreneur

  76. Slide 76: Côte d'Ivoire National Plan

    7 CÔTE D’IVOIRE NATIONAL PLAN Contribution towards national development goals Electricity Access to 100% GDP growth to 7.7% annually Poverty Rate to below 31% in qualifying localities 1 National Primary School Enrollment Infrastructure and Human Targets Drinking Water access to ~96% to ~97% Developm

  77. Slide 77: Dolorougo-Kaha Relocation

    7 DOLOROUGO-KAHA RELOCATION Improving living standards and empowering local entrepreneurs +100 Community houses Schools and teacher housing INSIGHTS: › Construction was completed in Q4- 2025 with the formal handover of Community centres and public Multi-faith places of worship markets homes to affec

  78. Slide 78: Reforestation Program

    7 REFORESTATION PROGRAM 500 hectares of reforestation INSIGHTS: › Montage Gold believes that responsible development is about creating sustainable value for all of our stakeholders, while preserving the environment. › Our reforestation program covers an area of approximately 500 hectares, including

  79. Slide 79: Koné Training and Local Employment

    7 KONÉ TRAINING AND LOCAL EMPLOYMENT Local upskilling through heavy equipment training INSIGHTS: “Cette formation renforce ma compétitivité, m ouvre les portes d’un avenir › In line with Montage’s commitment to local meilleur et me rapproche de mon rêve devenir un operateur reconnu pour sa compétiti

  80. Slide 80: Community Upskilling Programs

    7 COMMUNITY UPSKILLING PROGRAMS Training and learning alongside national partnerships INSIGHTS: › Montage demonstrates its commitment to local content with training programs being conducted in partnership with the government-accredited Lycée Technique de Mankono across the following professions: ste

  81. Slide 81: Environmental Action Plan

    7 ENVIRONMENTAL ACTION PLAN (“EAP”) International best practices to environmental management INSIGHTS: CO2 › Montage is committed to minimizing and Water Quality Biodiversity Air Quality Human Impact mitigating environmental impacts through internationally recognized best practices Monitoring Tracki

  82. Slide 82: Health and Social Development

    7 HEALTH AND SOCIAL DEVELOPMENT Supporting and investing in the health of our local communities INSIGHTS: › Montage supported the "Pink October" community health campaign, that focuses on women's health and raising awareness about women's cancer › The initiative, co-led by the Dianra Regional Health

  83. Slide 83: Pink October Health Program

    7 PINK OCTOBER HEALTH PROGRAM More than 1,400 women reached across host communities INSIGHTS: › As part of Breast Cancer Awareness Month, Montage carried out a joint breast and cervical cancer awareness and screening campaign across its host communities. › Held simultaneously across Montage’s portfo

  84. Slide 84: Impacted Communities

    7 IMPACTED COMMUNITIES Strong community support from the surrounding villages Established of a community development Refurbishment of Batogo medical clinic fund to finance local projects and Fadiadougou maternity unit INSIGHTS: › Montage is backed by strong New water wells dug in Fadiadougou, Liveli

  85. Slide 85: Koné Livelihood Restoration Plan

    7 KONÉ LIVELIHOOD RESTORATION PLAN 4 farming and gardening pilot programs launched INSIGHTS: “Montage a fourni les terres, les semences et l'équipement nécessaires à l'organization de l'agriculture et du jardinage afin d'autonomiser la › The Livelihood Restoration Plan (“LRP”) communauté locale. La

  86. Slide 86: Community Engagement

    7 COMMUNITY ENGAGEMENT Community newsletter and robust grievance mechanisms Community newsletters INSIGHTS: › Montage is committed to transparent and inclusive communication throughout the project lifecycle based on respect, transparency and open communication › A structured communication strategy h

  87. Slide 87: Section 3: Didievi Project

    Section 3: DIDIEVI PROJECT

  88. Slide 88: Didievi Project

    DIDIEVI PROJECT Poised to be Montage’s next development asset N INSIGHTS: Highlights › The Didievi project is located within the Birimian volcanosedimentary formations (lower Proterozoic) of the Toumodi–Fêtèkro belt › This belt forms part of the Proterozoic basement of the Baoulé-Mossi domain within

  89. Slide 89: Didievi Project Area

    DIDIEVI PROJECT AREA High-quality infrastructure in an established mining area Abundant water resources across the property INSIGHTS: › The Didievi project is located approximately 30km from Grid power Yamoussoukro, the capital of streamlines permitting Côte d'Ivoire, and is accessible & reduces sus

  90. Slide 90: Didievi Historical Overview

    DIDIEVI HISTORICAL OVERVIEW Rapid exploration progress following Montage operatorship Montage take over operatorship Regional exploration Blaffo Guetto Blaffo Guetto Regional exploration Pranoi and Pokou Blaffo Guetto Blaffo Guetto Stream, soil and grab 1st RC drilling 2nd RC-DD drilling Further sam

  91. Slide 91: Didievi Project Area Exploration

    DIDIEVI PROJECT AREA EXPLORATION Exploration potential across 3 major mineralized trends Didievi project exploration targets and mineralized trends INSIGHTS: › Didievi project area comprises 3 major mineralized trends across a surface area of approximately 389km²: − the Blaffo Guetto trend hosting t

  92. Slide 92: Blaffo Guetto Deposit

    BLAFFO GUETTO DEPOSIT High-grade intercepts from surface Blaffo Guetto Drilling Plan INSIGHTS: › Blaffo Guetto is the project’s most advanced deposit, with an Inferred Resource of 989koz at 2.5 g/t Au1 › Mineral Resource Estimate COG Sensitivity: Cut-off Tonnage Grade Content (g/t Au) (t) (g/t Au) (

  93. Slide 93: Blaffo Guetto Deposit: Down-Dip Continuity

    BLAFFO GUETTO DEPOSIT Mineralization continuity demonstrated down-dip Source: Montage Gold. 93

  94. Slide 94: Blaffo Guetto Deposit: Central Continuity

    BLAFFO GUETTO DEPOSIT Continuity of mineralization towards the center of Blaffo Guetto Source: Montage Gold. 94

  95. Slide 95: Blaffo Guetto Deposit: Southwest Intercepts

    BLAFFO GUETTO DEPOSIT High-grade intercepts towards the southwest of Blaffo Guetto Source: Montage Gold. 95

  96. Slide 96: Didievi Exploration Triangle

    DIDIEVI EXPLORATION TRIANGLE Utilizing a proven methodology to enhance the pipeline of targets June 2026 (0) Ore Reserves INSIGHTS: › Using Montage’s well-established and tested methodology, over 14 targets Blaffo Guetto (1) Mineral Resources have been identified on the property › Much of the Didiev

  97. Slide 97: Didievi Project Exploration Potential

    DIDIEVI PROJECT EXPLORATION POTENTIAL Further exploration upside across multiple targets Didievi project tenement and intercepts1 INSIGHTS: › Drilling across the Didievi project has assisted in evaluating a number of additional exploration targets, providing further exploration upside. › Pranoi targ

  98. Slide 98: Section 4: Wendé Advanced Greenfield Property

    Section 4: WENDÉ ADVANCED GREENFIELD PROPERTY

  99. Slide 99: Wendé Advanced Greenfield Exploration

    WENDÉ ADVANCED GREENFIELD EXPLORATION Aiming to rapidly advance the property towards a maiden resource INSIGHTS: Highlights › Two permits in central-northeast Côte d’Ivoire – Wendé: ~107km² advanced greenfield property, granted December 2025, ~360km northeast of Abidjan and within 40km of a paved na

  100. Slide 100: Wendé Permit Supported by Historical Exploration

    WENDÉ ADVANCED GREENFIELD EXPLORATION Highly prospective permit supported by historical exploration Wendé permit area with exploration targets INSIGHTS: › Montage was recently granted the Wendé permit in late 2025 with an initial 9,000-metre exploration program now underway in 2026 › The Wendé prope

  101. Slide 101: Wendé Exploration Triangle

    WENDÉ EXPLORATION TRIANGLE Utilizing a proven methodology to enhance the pipeline of targets As of July 2026 INSIGHTS: (0) Ore Reserves › Using Montage’s well-established and tested methodology, over 9 targets have been identified on the property (0) Mineral Resources › Much of the Wendé property is

  102. Slide 102: Wendé Permit Area with Magnetics

    WENDÉ ADVANCED GREENFIELD EXPLORATION Highly prospective permit supported by historical exploration Wendé permit area with magnetics INSIGHTS: › Bobosso: a ~7km² target defined by previous drilling – Oval-shaped, north-northeast striking target, initially based on gold-in-soil anomalies – Straddles

  103. Slide 103: Bobosso Target Drill Results

    WENDÉ ADVANCED GREENFIELD EXPLORATION Drill results have confirmed the potential of the Bobosso target Wendé permit select intercepts INSIGHTS: › Montage has identified the Wendé permit as highly prospective, with approximately 60,000 metres of drilling conducted on the property by previous owners ›

  104. Slide 104: Wendé Cross Section A-A'

    WENDÉ ADVANCED GREENFIELD EXPLORATION Cross section through A-A’ Note: Please refer to the Company’s press release dated July 29, 2026 for further details. 104

  105. Slide 105: Wendé Cross Section B-B'

    WENDÉ ADVANCED GREENFIELD EXPLORATION Cross section through B-B’ Note: Please refer to the Company’s press release dated July 29, 2026 for further details. 105

  106. Slide 106: Section 5: Other Exploration and Partnerships

    Section 5: OTHER EXPLORATION AND PARTNERSHIPS

  107. Slide 107: Striving to Be the Partner of Choice

    STRIVING TO BE THE PARTNER OF CHOICE Win-win partnership approach with governments and corporates Win-win partnership approach with governments, local stakeholders and exploration-stage companies continues to unlock value for all stakeholders. LOCAL GOVERNMENTS: › Montage was granted the Wendé advan

  108. Slide 108: Mauritania Greenfield Exploration

    MAURITANIA GREENFIELD EXPLORATION Secured over 2,700km² of prospective exploration properties Mauritania greenfield exploration properties INSIGHTS: › Montage continues to expand its exploration footprint in West Africa by positioning itself as the partner of choice with governments, exploration-sta

  109. Slide 109: Mauritania Geological Setting

    MAURITANIA GREENFIELD EXPLORATION Geological setting Conchita Florence Emiral’s Iguidi Eastern Reguibat INSIGHTS: › Permits are located close to the junction between the Eastern and Western Reguibat domains – Western Reguibat: Mesoarchean domain which hosts Kinross’ Tasiast gold mine and BIF-hosted

  110. Slide 110: Mauritania Shear Zones and Major Sutures

    MAURITANIA GREENFIELD EXPLORATION Presence of shear zones and major sutures Paleoproterozoic Eastern Reguibat INSIGHTS: › Permit selection was based on these lithological- structural and geodynamic criteria: – Presence of strongly deformed (mylonitized, sheared, folded) late Paleoproterozoic metased

  111. Slide 111: Mauritania Permit Locations

    MAURITANIA GREENFIELD EXPLORATION Favorably situated on major geological boundaries Map of Sfariat and Zednes permit locations INSIGHTS: Sfariat Belt › The permits are favorably situated on major Mesoarchean- Paleoproterozoic structural boundaries and associated intersecting feeder structures, a kno

  112. Slide 112: Strategic Partnership with Sanu Gold

    STRATEGIC PARTNERSHIP WITH SANU GOLD (CN:SANU) Exploration properties in Guinea within the Siguiri Basin INSIGHTS: Sanu Gold corporate holdings › Montage announced a strategic partnership with Sanu in December 2024, through a share exchange transaction, with the issuance to Sanu of 2.3 million commo

  113. Slide 113: Sanu Gold: High Grade Intercepts at Daina

    STRATEGIC PARTNERSHIP WITH SANU GOLD (CN:SANU) High grade intercepts at Daina Daina property overview INSIGHTS: › Daina exploration permit located in the NE Siguiri Basin › High grade intercepts at the Daina property include: − 51 metres at 3.11 g/t Au − 21 metres at 4.75 g/t Au › Combined >10km str

  114. Slide 114: Daina and Diguifara Mineralization Structures

    STRATEGIC PARTNERSHIP WITH SANU GOLD (CN:SANU) Daina and Diguifara mineralization structures Daina and Diguifara structures INSIGHTS: › A >8km gold corridor in the NE Siguiri Basin – Gold exploration permit between Endeavour and AngloGold Ashanti – Combined 8km strike length across Daina and Diguifa

  115. Slide 115: Bantabaye Exploration

    STRATEGIC PARTNERSHIP WITH SANU GOLD (CN:SANU) Bantabaye exploration Bantabaye property INSIGHTS: › A 4km mineralized corridor at Bantabaye North – The main structure trends for over 4km of strike within the permit, from the western boundary through Targets 2, 3 and 7 – Marked by historic workings,

  116. Slide 116: Partnership with Aurum Resources

    PARTNERSHIP WITH AURUM RESOURCES (ASX:AUE) Exploration along the Boundiali Belt Aurum Resources corporate holdings INSIGHTS: › Montage announced a strategic partnership with Aurum in May, 2025, obtaining a 9.8% interest in May 2025 › Following a strategic review of the Company’s investment in Aurum

  117. Slide 117: Section 6: Appendix

    Section 6: APPENDIX ALA, [-] [TTT d

  118. Slide 118: Technical Disclosures

    TECHNICAL DISCLOSURES MINERAL RESERVE AND RESOURCE ESTIMATES – 2024 UPDATED FEASIBILITY STUDY (“UFS”) MINERAL RESOURCE ESTIMATES (“MRE”)(continued) › The Mineral Reserves are classified according to the “CIM” definitions. All Mineral Reserves were classified as › The MRE is reported in accordance wi

  119. Slide 119: Technical Disclosures: Didievi Resource Estimates

    TECHNICAL DISCLOSURES DIDIEVI PROJECT MINERAL RESOURCE ESTIMATES › The Mineral Resource Estimate for the Didievi Project was prepared for African Gold Limited, which was subsequently acquired by Montage on April 28, 2026. For further details on the acquisition of African Gold Limited, refer to Monta

  120. Slide 120: Metallurgical Testwork Summary

    METALURGICAL TESTWORK SUMMARY Good gold recoveries with low reagent consumptions The testwork program demonstrated that the mineralization is amenable to direct tank carbon in pulp cyanide leaching with good gold recoveries, low reagent consumptions and medium-low resistance to grinding, providing f

  121. Slide 121: Infrastructure Details: Haulage Road, Water and Tailings

    INFRASTRUCTURE DETAILS Haulage road, water and tailings Haul Road from Gbongogo Main to Koné The Gbongogo haul road is 38.1 km in length and transverses a sparsely populated area between the two sites and has been designed to avoid villages, defined forest areas and minimize interactions with existi

  122. Slide 122: Infrastructure Details: Power

    INFRASTRUCTURE DETAILS Power Power The UFS evaluated hybrid power supply options from proposals received from West African power providers. However, local supplies of LNG cannot be guaranteed, and so power will now be supplied from the National Grid via a new 225kV transmission line. The Koné mine p

  123. Slide 123: Process Plant

    PROCESS PLANT Based on a simple and robust metallurgical flowsheet The process plant design in the UFS is based on a simple and robust metallurgical flowsheet designed for optimal precious metal recovery. The key design criteria for the plant are: ▪ Nominal throughput of 11.0 Mtpa with a grind size

  124. Slide 124: Mining Details

    MINING DETAILS UFS Mining operations UFS mining operations UFS mining operations were assumed to be carried out by a contractor on a unit cost per tonne basis utilizing a mining fleet comprised of 90t rigid body haul trucks with suitably sized loading units at a rate of 39Mtpa at Koné and 15Mtpa at

  125. Slide 125: Summary Production and Financial Model (US$3,000/oz)

    SUMMARY PRODUCTION AND FINANCIAL MODEL (based on US$3,000/oz) Description Units Total/Avg Pre-Production Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Mining Ore Mined Mt 174.3 7.5 24.2 21.4 24.5 12.7 14.1 17.9 20.7 27.

  126. Slide 126: Summary Production and Financial Model (US$4,000/oz)

    SUMMARY PRODUCTION AND FINANCIAL MODEL (based on US$4,000/oz) Description Units Total/Avg Pre-Production Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Mining Ore Mined Mt 174.3 7.5 24.2 21.4 24.5 12.7 14.1 17.9 20.7 27.

  127. Slide 127: Contact

    TSX MAU OTCQX MAUTF montagegold.com Martino De Ciccio Chief Executive Officer mdeciccio@montagegold.com Jake Cain Strategy & Investor Relations Manager jcain@montagegold.com

Montage Gold — Technical Presentation (November 2026) on 6ix