1. The Royal Decree 2. Contingency Plan 3. CoreWeave 4. Interest Rates ISMAEL FRANCISCO JAVIER CLEMENTE RIVAS ECHAVE CEO DIRECTOR CFO
Slide 4: The Royal Decree
THE ROYAL DECREE
Slide 5: Current status: two non-binding opinions raise objections to the draft
The Royal Decree Current status TWO NON-BINDING OPINIONS RAISE OBJECTIONS TO THE DRAFT CNMC COUNCIL OF STATE Spanish National Markets and The Government’s supreme Competition Commission consultative body Public body that promotes Recognised in Article 107 of the Constitution competition and well-fun
Slide 6: Approval timeline: three possible approval scenarios
The Royal Decree Approval timeline THREE POSSIBLE APPROVAL SCENARIOS SCENARIO APPROVAL WINDOW KEY CONDITION 01 Most likely 13, 17, 20 or 24 Approval at a Council of Ministers meeting before the general elections (29th November) November Approval by the Government in functions. 02 Intermediate 29 Nov
Slide 7: Entry into force
The Royal Decree Entry into force 20-DAY ENTRY-INTO-FORCE PERIOD AND GOVERNMENT FORMATION TIMELINE DRAFT PROVISION after publication in the Official State Gazette (BOE) 20 days The approval or publication date alone does not determine entry into force APPROVAL ILLUSTRATIVE BOE PUBLICATION ENTRY INTO
Slide 8: Implications of a potential change of Government
The Royal Decree Implications of a potential change of Government IF A CHANGE OF GOVERNMENT OCCURS, THE POLITICAL OPPOSITION (PP) SIGNALS COMPLETE REPEAL... OKDIARIO LA PORTADA HERALDO SPAIN DE EXTREMADURA DE ARAGÓN 18 October 2026 25 October 2026 11 September 2026 “Feijóo will repeal the PP rejects
Slide 9: Contingency Plan
CONTINGENCY PLAN
Slide 10: Tweaking the MEGA Plan footprint (704 MW), particularly in Phase III
Contingency Plan Tweaking the MEGA Plan footprint (704 MW), particularly in Phase III NEW PLAN MEGA AT A GLANCE Bilbao 704 MW 118 MW Zaragoza 240 MW Total IT capacity Capacity Barcelona 22 MW Madrid Phase I 64 MW 104 MW Phase II 254 MW Extremadura Lisbon 20 MW Phase III 386 MW 200 MW 10
Slide 11: New MEGA Plan Overview (704 MW)
Contingency Plan New MEGA Plan Overview (704 MW) REDUCE REGULATORY EXPOSURE + MAXIMIZE OPTIONALITY Phase I Phase II Phase III Total Total IT Capacity (MW) 64 254 386 704 Stabilization year 2027 2030 2031 Total investment (€m) 614 2,756 4,302 7,671 Cost per MW (€m) 9.6 10.8 11.1 10.9 Stabilized GRI (
Slide 12: Royal Decree impact in a worst case scenario
Contingency Plan Royal Decree impact in a worst case scenario INCREMENTAL CAPEX CAUSED BY THE HOURLY MATCHING REQUIREMENT OF THE ROYAL DECREE To comply with the Royal Decree, we have calculated the BESS capacity (MW) and solar PV capacity (MWp) needed to match the electricity consumption profile and
Slide 13: CoreWeave
COREWEAVE
Slide 14: Portfolio diversification
CoreWeave Portfolio diversification DIVERSIFIED PORTFOLIO SUPPORTS INCOME RESILIENCE 10.5% 0.4% 8.6% Diversification at two levels: exposure 1H26 1. Group diversification MERLIN combines offices, logistics, shopping centers and data centers, Annualized limiting the impact of any individual 14.5% 50.
Slide 15: Lease and credit protection
CoreWeave Lease and credit protection MERLIN DATA CENTERS CONTRACTS COMBINE LEGAL PROTECTION, STRONG CASH FLOW AND ASSET VERSATILITY ASSET VERSATILITY AND REINFORCED LEGAL PROTECTION RE-TENANTING OPPORTUNITY • Data Center leases are governed, construed and enforced by the • MERLIN’s assets follow a
Slide 16: Tenant concentration
CoreWeave Tenant concentration COREWEAVE SHARE OF INSTALLED CAPACITY EXPECTED TO DECLINE TO 19% BY 2031 share of installed capacity (MW) 100% SINGLE-TENANT 78% TARGET 75% 56% 56% 50% 20% 24% 21% 25% 19% Maximum exposure to any single tenant 0% 2026 2027 2028 2029 2030 2031 CoreWeave leased capacity
Slide 17: Interest Rates
INTEREST RATES
Slide 18: New corporate financing
Interest Rates New corporate financing ELIMINATE ANY DEBT MATURITIES/REFINANCING RISK UNTIL 2030 Sources Debt issues (€m) Uses Debt repayments (€m) Completed issuances 1,042 Bond 26/27/29 + Term Loan 28 2,425 47% Phase II New term loan 2,250 DC Capex 867 Capex financed TOTAL Sources 3,292 TOTAL Uses
Slide 19: Rental growth and interest coverage
Interest Rates Rental growth and interest coverage RENTAL GROWTH MORE THAN OFFSETS HIGHER INTEREST EXPENSE 01 02 03 04 Rental growth Higher financing Stronger coverage Maintaining LTV target costs absorbed by 2030 3x GRI +110 bps 4.0x to 5.0x <35% 2030 GRI triples the 2025 level, Higher average cost