Mayfair Gold Corp. · TSXV:MFG
Mayfair Gold — Investor Presentation (July 2021)
25 slides from Mayfair Gold's investor presentation, July 2021
Slide 1: Corporate Presentation July 2021
CORPORATE PRESENTATION JULY 2021 TSX.V: MFG OTC: MFGCF FRA:9M5
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT This presentation contains "forward-looking information" for purposes of applicable securities laws ("forward-looking statements"). Forward- looking statements are neither historical facts nor assurances of future performance. Instead, they are based on the Company's current bel
Slide 3: Cautionary Statement: National Instrument 43-101
CAUTIONARY STATEMENT National Instrument 43-101 Technical and scientific information contained herein relating to the Fenn-Gib Project is derived from the technical report (“Technical Report”) dated February 19, 2021, prepared by JDS Energy and Mining Inc. Technical and scientific information contai
Slide 4: Mayfair Gold Corp.
MAYFAIR GOLD CORP. ➢ Established in 2019 to acquire advanced gold project in Tier 1 jurisdiction ➢ Assessed +90 projects ➢ March 2020: signed Fenn-Gib acquisition agreement with Pan American ➢ October 2020: purchased Matheson exploration office from Kirkland Lake ➢ December 31 2020: Fenn-Gib acquisi
Slide 5: Leadership
LEADERSHIP Management Board of Directors Patrick Evans, CEO Harry Pokrandt, Chairman ▪ 23+ years of senior management experience at public mining ▪ 30+ years of capital markets experience companies that have discovered, developed and operated ▪ Former MD, Macquarie Capital Advisors, Mining mines acr
Slide 6: Investment Case
INVESTMENT CASE Located in Tier 1 Jurisdiction of Timmins, Ontario ▪ Canada’s largest gold mining district ▪ Clear permitting process with supportive communities, government and other local stakeholders High-Quality Asset ▪ 2.08 Moz indicated + 0.075 Moz inferred ▪ Disseminated mineralization, low s
Slide 7: Fenn-Gib: Strategic Property Positions
FENN-GIB: STRATEGIC PROPERTY POSITIONS ➢ ~4,800 ha: North Block and South Block ➢ North Block straddles the Pipestone Fault: hosts current +2Moz NI 43-101 resource ➢ South Block straddles the Porcupine Fault: under-explored: no road access ➢ Numerous gold occurrences across both North and South Bloc
Slide 8: Geology, Metallurgy & Resources
GEOLOGY, METALLURGY & RESOURCES 2.08 Moz Indicated + 0.075 Moz Inferred Robust Preliminary Metallurgy Resource ➢ Preliminary testing indicates highly ➢ 70 Mt @ 0.921 g/t Au indicated predictable geo-metallurgy ➢ 4 Mt @ 0.618 g/t Au inferred ➢ Amenable to several simple and proven ➢ Open-pit resource
Slide 9: 2021 Business Plan
2021 BUSINESS PLAN ➢ 50,000m infill and expansion drilling at First Deposit: Goal: grow resource from 2.15M to +3M ounces ➢ Airborne mag survey over North and South Blocks: completed, results being analyzed ➢ Regional exploration drill program outside First Deposit (meterage to be determined) ➢ Envi
Slide 10: Resource Upside: Target +3M oz
RESOURCE UPSIDE: TARGET +3M OZ ➢ Pit-constrained resource remains open at depth and along strike in all directions ➢ Potential to expand pit shell beyond current limits ➢ Q4 ‘21 resource update: Target +3M oz ➢ Multiple regional expansion targets identified within land package Fenn Gib Deposit Long-
Slide 11: Resource Upside: Target +3M oz
RESOURCE UPSIDE: TARGET +3M OZ Step 1: In and below current conceptual pit ➢ Infill drilling at 25 – 50m spacing ➢ Reinterpretation of mineralized solids to incorporate additional tonnage from recent drilling 10 TSX.V: MFG
Slide 12: Resource Upside: Target +3M oz
RESOURCE UPSIDE: TARGET +3M OZ Step 2: Underground ➢ Underground tonnage excluded from updated NI 43-101 (est. 200,000 oz) due to rule change requiring conceptual underground mine plan ➢ Potential for substantial additional underground tonnage not previously included in resource estimates ➢ #1 adjac
Slide 13: North Block Mag Survey
NORTH BLOCK MAG SURVEY Footwall Zone Target Area 4th Drill Rig: Eastern Extension 12 TSX.V: MFG
Slide 14: North Block Drill Program
NORTH BLOCK DRILL PROGRAM 13 TSX.V: MFG
Slide 15: Drill Results: Hole 135
DRILL RESULTS: HOLE 135 FG21-135 0.41 g/t Au / 244.0m 0.61 g/t Au / 28.8m 0.71 g/t Au / 28.0m 14 TSX.V: MFG
Slide 16: Drill Results: Holes 138, 140
DRILL RESULTS: HOLES 138, 140 FG21-140 FG21-138 Fenn-Gib Deposit 0.41 g/t Au / 92.5.0m 5.52 g/t Au / 5.0m 0.31 g/t Au / 135.0m 0.61 g/t Au / 15.0m 1.03 g/t Au / 26.0m 1.13 g/t Au / 21.0m 0.57 g/t Au / 96.0m 0.67 g/t Au / 20.4m 15 TSX.V: MFG
Slide 17: Drill Results: Holes 137, 139, 142
DRILL RESULTS: HOLES 137, 139, 142 0.57 g/t Au / 12.0m 2021 JDS 0.73 g/t Au / 2.7m PROPOSED PIT 2.28 g/t Au / 5.6m OUTLINE 0.82 g/t Au / 2.7m 1.35 g/t Au / 3.0m 1.07 g/t Au / 2.7m 1.94 g/t Au / 38.0m 4.06 g/t Au / 15.0m 2.06 g/t Au / 1.5m 16 TSX.V: MFG
Slide 18: Drill Results: Hole 144
DRILL RESULTS: HOLE 144 DDH FG21-144 2021 JDS PROPOSED PIT OUTLINE metasediments 0.69 gpt Au / 59.8m altered metasediments mafic volcanics 1.29 gpt Au / 18.4m altered mafic volcanics ultramafic volcanics 5.3 gpt Au / 1.6m syenite mafic intrusive rocks lamprophyre porphyry (FP, QFP) diabase fault/she
Slide 19: Drill Results: Hole 155 (Partial Assay)
DRILL RESULTS: HOLE 155 (PARTIAL ASSAY) DDH FG21-155 2021 JDS 2.15 g/t Au / 53.7m PROPOSED PIT OUTLINE metasediments 1.67 g/t Au / 241.1m altered metasediments mafic volcanics altered mafic volcanics 3.23 g/t Au/28.6m incl. 4.35 g/t Au/11.0m ultramafic volcanics fuchsite-altered ultramafic volcanics
Slide 20: Visible Gold in Core
VISIBLE GOLD IN CORE ➢ Hole FG21-158 at 411.9m ➢ Hole FG21-161 at 178.5m and 179.6m (drilled on the same section and above hole FG21-158 within the Footwall Zone north of the Fenn- Gib deposit - assays pending) VG Hole FG21-161 (177.0-179.0m): Photo shows two areas of visible gold hosted in brecciat
Slide 21: Higher-Grade Footwall Zone
HIGHER-GRADE FOOTWALL ZONE ➢Footwall zone outside current pit- constrained resource ➢Outcrops approx. 100m north of deposit ➢Drill intercepts: ➢3.93 g/t Au over 53.0m ➢2.81 g/t Au over 16.8m ➢Including 4.50 g/t over 5.7m ➢3.54 g/t Au over 10.0m ➢4.03 g/t Au over 3.0m ➢1.94 g/t Au over 38m ➢Including
Slide 22: Footwall Zone Surface Outcrop
FOOTWALL ZONE SURFACE OUTCROP 21 TSX.V: MFG
Slide 23: Exploration Targets: South Block
EXPLORATION TARGETS: SOUTH BLOCK Primary Target 22 TSX.V: MFG
Slide 24: Capital Structure & Major Shareholders
CAPITAL STRUCTURE & MAJOR SHAREHOLDERS Capital Structure Major shareholders Shares Outstanding 76.65M Haywood Securities 23% (various accounts) Options 3.85M Heeney Capital 27% Warrants Nil Newgen 3% Fully Diluted 80.50M Market Cap ~C$80M Analyst Coverage Cormark Securities (Brock Colterjohn) Cash H
Slide 25: Mayfair Gold Corp.
MAYFAIR GOLD CORP. TSX.V: MFG OTC: MFGCF FRA: 9M5 Contact: Patrick Evans, President and CEO Tel: (416) 670-5114 Email: patrick@mayfairgold.ca www.mayfairgold.ca 24 TSX.V: MFG