Slide 1: Lake Erie Works Community Liaison Committee Meeting
Lake Erie Works Community Liaison Committee Meeting 06 February 2019 K. Chan
Slide 2: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Cokemaking Update 6. Winter fugitive dust management 7. ISO 14001 Update 8. Community Co
Slide 3: Know Your Emergency Exits
Know Your Emergency Exits Review Evacuation Routes of the room you are located in
Slide 4: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Cokemaking Update 6. Winter fugitive dust management 7. ISO 14001 Update 8. Community Co
Slide 5: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Cokemaking Update 6. Winter fugitive dust management 7. ISO 14001 Update 8. Community Co
Slide 6: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Cokemaking Update 6. Winter fugitive dust management 7. ISO 14001 Update 8. Community Co
Slide 7: Site-Specific Standard Order (Particulates): Performance Review – Daily
Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Oct 1 – Dec 31, 2018 0 – 9.09% 0 – 1.8% 0 – 5.0% Range (3.97%) (0
Slide 8: Performance Review – 30 Day Rolling Averages
Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%
Slide 9: Performance Review – Daily Observations – Pushing Emissions
Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Oct 1, - Dec 31, 2018 Range 0 – 48.33% (Average) (10.29%) Oct 1 – Dec 31, 2018 Operationa
Slide 10: Performance Review – Additional Items
Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were no community complaints for the period of October – December 2018 • MECP to provide verbal comments
Slide 11: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Cokemaking Update 6. Winter fugitive dust management 7. ISO 14001 Update 8. Community Co
Slide 12: Lake Erie Works Cokemaking Update
Lake Erie Works Cokemaking Update February 2019 Pete Schiestel
Slide 13: Stelco Cokemaking Overview
Stelco Cokemaking Overview • Video presentation
Slide 14: Coke Battery Overview
Coke Battery Overview Quench car al ai, Pusher machine
Slide 15: LEW Battery
LEW Battery History: The Lake Erie Works #1 battery was commissioned in 1981 with ostensible repairs completed in 1997. Present: Routine daily patching refractory repairs.
Slide 16: End Flue Repairs
End Flue Repairs Scope: • 45 ovens will be repaired on the pusher side and coke side • Complete battery bracing system refurbishment with the addition of new water seal stand pipe caps.
Slide 17: Brick Courses
Brick Courses Procedure: 6 to 8 layers of flue brick will be positioned each day to provide the appropriate wall alignment. Curing of the mortar is crucial to prevent cross wall leaks. Controlled commissioning of the mended oven enhances battery life.
Slide 18: Thank You.
Thank You. stelcocanada.com
Slide 19: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Cokemaking Update 6. Winter fugitive dust management 7. ISO 14001 Update 8. Community Co
Slide 20: Lake Erie Works Winter Dust Management
Lake Erie Works Winter Dust Management B. Stefureak Iron Producing Area Manager
Slide 21: Overview
Overview • Well-established fugitive dust management plan already in place • A “living” document – best management practices for continual improvement • Integrated in Standard Operating Procedures • Dust mitigation practices are customized by season to address different external environmental condit
Slide 22: Raw Material Handling - Dock
Raw Material Handling - Dock • The Process Coordinator – Raw Materials & Dock oversees dust management of stockpiles at all times of the year • Coal Stockpiles generally arranged to minimize surface area that can be affected by prevailing winds • 9 stock piles reduced to 4 stock piles • Sufficient q
Slide 23: Tools For Proactive Approach
Tools For Proactive Approach • Timely communication with all crews • Detailed current weather and future wind forecasts • USE DUST SUPPRESSION TOOLS PROACTIVELY!
Slide 24: Tools For Proactive Approach
Tools For Proactive Approach
Slide 25: Tools For High Wind Warning Notification
Tools For High Wind Warning Notification • Automated email alerts when measured wind at a weather station exceeds an alert setpoint (currently 21kph) • Emails are sent to iron producing management and all blast furnace Shift Managers (24 x 7) • System is integrated with the blast furnace control roo
Slide 26: In-Plant Roads
In-Plant Roads • Similar to stock piles management, dust control on plant roadways vary based on seasonal conditions • Internal visual inspection of roadways and related areas are conducted daily • Dust from unpaved and paved roads are managed on a daily, or as- required, basis • Dust management pra
Slide 27: Thank You.
Thank You. stelcocanada.com
Slide 28: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Cokemaking Update 6. Winter fugitive dust management 7. ISO 14001 Update 8. Community Co
Slide 29: ISO 14001 Update
ISO 14001 Update • ISO 14001 is the international standard that specifies requirements for an effective environmental management system • Successfully completed external ISO 14001 surveillance audit in January 2019 • Third party auditors recommended LEW for continued ISO 14001 certification • Zero n
Slide 30: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Cokemaking Update 6. Winter fugitive dust management 7. ISO 14001 Update 8. Community Co
Slide 31: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 Meeting 4. Performance under O.Reg. 419/05 Site Specific Standard Order– Particulates 5. Cokemaking Update 6. Winter fugitive dust management 7. ISO 14001 Update 8. Community Co
Slide 32: Supplementary (March 21, 2019)
Supplementary (March 21, 2019)
Slide 33: Site-Specific Standard Order (Particulates): Performance Review – Daily
Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Jan 1 – Feb 28, 2019 0 – 9.3% 0 – 1.28% 1.22 – 6.1% Range (5.96%)
Slide 34: Performance Review – 30 Day Rolling Averages
Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%
Slide 35: Performance Review – Daily Observations – Pushing Emissions
Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Jan 1 – Feb 28, 2019 Range 0 – 39.17% (Average) (13.23%) January 1 – February 28, 2019 Op
Slide 36: Proposed 2019 CLC Meeting Dates
Proposed 2019 CLC Meeting Dates Thurs. March 21 Wed. June 12 Wed. Sept. 18 Wed. Dec. 11
Slide 37: Thank You.