  1. Slide 1: Introduction to Babcock Noell GmbH

    Introduction to Babcock Noell GmbH Capital Markets Day “Power Services“ at Moorburg Power Plant December 2, 2010 Helmut Welp, Managing Director of Babcock Noell GmbH

  2. Slide 2: Agenda

    Agenda ge da ƒ The Company p y ƒ Products and Services ƒ Market Structure, Perspectives ƒ Success Drivers, Strategy ƒ Th F The Future, t Research R h & Development D l t ƒ FGD Hamburg Moorburg Units A + B Bilfinger Berger Capital Markets Day December 2, 2010 Page 2

  3. Slide 3: The Company

    e Co The Company pa y Bilfinger Berger SE Bilfinger Berger Power Services GmbH Steam Generator Power and Environmental Mechanical Apparatus Steam Generator Piping Technology South Africa Engineering and Plant Engineering Babcock Borsig Service Bilfinger Berger Power BHR Hochdruck- Babcock Noell GmbH

  4. Slide 4: Babcock Noell - Overview

    The Company Babcock Noell - Overview Babcock Noell GmbH (BNG) is the centre of competence with global responsibility for nuclear, magnet and environmental technology. ƒ BNG provides maintenance and modernization services for nuclear power plants, as well as the execution of decommissioning and disma

  5. Slide 5: Product Divisions

    The Company Product Divisions Environmental Magnet Nuclear Service Nuclear Technology Technology Technology Containment lock Positioning of a liner- Superconducting Components for - preparation of segment on EPR dipole for the LHC flue gas treatment seall for f leakage l k R Reactor t OL 3 Finland F

  6. Slide 6: Range of services

    The Company Range of services Development Technical Project Material Erection Services Planning Computation Management Management Commissioning for Licensing Design Technical Production Power Processing Quality assurance Plants Feedback of experience Bilfinger Berger Capital Markets Day December 2,

  7. Slide 7: Key figures 2008 to 2010 (expected)

    The Company Key figures 2008 to 2010 (expected) FY 2008 FY 2009 FY 2010e Orders received € 100m € 80m € 136m Order backlog € 111m € 125m € 187m Output volume € 54m € 66m € 75m Employees 300 315 330 Æ German share of output volume currently at approx. 63% However, German share of orders received curr

  8. Slide 8: Products and Services - Nuclear Technology

    Products oducts and a d Se Services ces Nuclear Technology Products ƒ Components for nuclear power plants ƒ Hot cells ƒ Components for final disposal ƒ Decommissioning / waste management ƒ Special components Airlock for reactor model EPR (OL 3 Finland) Bilfinger Berger Capital Markets Day December 2

  9. Slide 9: Nuclear Technology - Reference: Olkiluoto 3

    Products oducts and a d Se Services ces Nuclear Technology - Reference Nuclear Power Plant Olkiluoto 3 C t i Containmentt Liner Li Customer: AREVA NP Contract Value: approx. € 35m Duration: 2004 – 2012 Total Weight: approx. 1,000 t Liner-plate Liner plate Thickness: 6 mm Diameter: 46,800 mm Total He

  10. Slide 10: Products and Services - Environmental Technology

    Products oducts and a d Se Services ces Environmental Technology Products Design, engineering, delivery, complete Installation and commissioning of flue gas treatment systems for fossil power plants, waste-to-energy plants, etc.: ƒ (F)lue (G)as (D)esulphurization Plants (FGD) ƒ (S)elective (C)atalyt

  11. Slide 11: Environmental Technology - Reference: FGD Boxberg Unit R

    Products oducts and a d Se Services ces Environmental Technology - Reference FGD Boxberg Unit R Customer: Vattenfall Europe AG Power of Boiler: 670 MW Contract value: € 30m Duration: 2005 - 2011 Absorber system with upstream connected heat extraction system, gypsum dewatering, limestone preparation

  12. Slide 12: Market Structure, Perspectives (next 5 years): Nuclear Technology

    Market a et St Structure, uctu e, Perspectives e spect es ((next e t 5 yea years) s) Nuclear Technology Target Market Product for BNG accessible Development Market Volume* Ukraine Hot Cells, Waste treatment € 200m Sweden/Finland Hot Cells, Waste treatment, Final Storage UK Containment Liner, Pool Li

  13. Slide 13: Market Structure, Perspectives (next 5 years): Environmental Technology

    Market a et St Structure, uctu e, Perspectives e spect es ((next e t 5 yea years) s) Environmental Technology Target Market Product for BNG accessible Development Market Volume* Germany FGD upgrading, SCR retrofit, Filters € 250m Italy FGD upgrading, Filters, W-t-E € 200m Poland FGD new and upgradin

  14. Slide 14: Success Drivers, Strategy: Differentiating Factors to the Competition

    Success Drivers, e s, St Strategy ategy Differentiating Factors to the Competition Competitors Babcock Noell Noell’s s approach Alstom Austrian Energie & Environment (AE&E) Fisia Babcock Hitachi Power MHI Standard technology for Tray-Absorber Technology for FGD FGDs - Less power consumption - Less r

  15. Slide 15: Success Drivers, Strategy

    Success Drivers, e s, St Strategy ategy ƒ Balanced product mix for all kinds of power generation ƒ Specialized for S f Custom-made C solutions for f new plants as well as upgradings and retrofittings ƒ Offering of optimized and reliable technologies with unique features to gain technological and fin

  16. Slide 16: The Future, Research & Development

    The e Future, utu e, Research esea c & Development e e op e t Selection of BNG‘s R & D Projects j ƒ Development of components/systems for CO2- separation Plants (oxyfuel, post combustion) ƒ Optimization of product portfolio regarding reliability, power consumption, efficiency ƒ Processing of a produ

  17. Slide 17: R & D, References CCS

    The e Future, utu e, Research esea c & Development e e op e t R & D, References CCS Successful R & D Project j ƒ The high efficiency FGD for the Vattenfall Oxyfuel pilot plant in Schwarze Pumpe ƒ To research the oxyfuel combustion process Vattenfall Europe commissioned a 30 MW pilot plant at Schwarz

  18. Slide 18: Flue Gas Desulphurization Plant Hamburg Moorburg Units A+B

    Flue Gas Desulphurization Plant Hamburg Moorburg Units A+B

  19. Slide 19: FGD Project Hamburg Moorburg A+B

    FGD G Project oject Hamburg a bu g Moorburg oo bu g A+B General Customer: Vattenfall Europe AG Contract Value: € 60m Order Received: March 24, 2006 Contract Duration: 2006 - 2013 Key Figures Power of Boiler: 2 x 820 MW Fuel: Hard Coal Gas Flow: 2 x 2,300.00 Nm³/h SO2 Inlet: 4000 mg/Nm³ SO2 Outlet: 1

  20. Slide 20: FGD Project Hamburg Moorburg A+B: Scope of Services and Supply

    FGD G Project oject Hamburg a bu g Moorburg oo bu g A+B Scope p of Services and Supply pp y Design, manufacture, delivery, construction and commissioning of: 2 FGD units, each with: ƒ Rawgas ducts, absorber, Stack ƒ Absorber recirculation system ƒ Oxidation air supply C Common S Systems: ƒ Limestone

  21. Slide 21: FGD Project Hamburg Moorburg A+B: Specific Features

    FGD G Project oject Hamburg a bu g Moorburg oo bu g A+B Specific p Features ƒ High SO2-removal Efficiency combined with optimized power consumption ƒ Two FRP stacks on top of the absorber in a common steel structure ƒ Just in time delivery of large components due lack of space available on site FGD

  22. Slide 22: Thank you very much for your attention!

    Thank you very much for your attention!