Future Mineral Resources Inc. · TSX:FMR

Future Mineral Resources — Investor Presentation (July 2026)

18 slides from Future Mineral Resources's investor presentation, July 2026

  1. Slide 1: A Strategic European Mineral Opportunity

    RESOURCES A Strategic European Mineral Opportunity Future Mineral Resources Inc. CORPORATE PRESENTATION July 2026

  2. Slide 2: Future Matters Confidentially

    Future Matters Confidentially This presentation contains reference to certain intentions, expectations, future plans, strategy and prospects of the Your receipt of this presentation constitutes your agreement, on behalf of yourself and your representatives, to Company. Those intentions, expectations

  3. Slide 3: Company Structure

    Company Structure Future Mineral Resources Inc. is a Canadian mineral exploration and development company listed on the Toronto Stock Exchange under the ticker FMR. The company is focused on acquiring, developing, and investing in high-quality mining projects across multiple jurisdictions, with expo

  4. Slide 4: SZKLARY: A Nickel Asset in Poland with Proven Historical Production

    SZKLARY A Nickel Asset in Poland with Proven Historical Production JORC Compliant Resource* 32.9Mt@0.70% Ni Element 28. Essential for Europe SZKLARY Foreign Estimate (JORC Code) A historical foreign estimate of 32.9 Mt at 0.70% Ni has been reported for the Szklary Project. This estimate was prepared

  5. Slide 5: A Nickel Asset in Poland with Proven Historical Production

    A Nickel Asset in Poland with Proven Historical Production Assets with Historical Drilling, Production & Geological Work • Former production on concessions during Soviet Era • 582 drill holes with minimal exploration work to validate resource Existing Infrastructure & Strategic Locations • Szklary h

  6. Slide 6: Why Nickel?

    Why Nickel? Nickel Prices Over the Last Decade Annual Average LME Nickel Price (US$ per tonne) EV Battery Growth Surging electric vehicle production drives massive exponential demand. Stainless Steel Base Industrial infrastructure ensures a highly stable consumption baseline. Geographical Diversific

  7. Slide 7: Key Advantages of Operating in Poland's Mining Sector

    Key Advantages of Operating in Poland’s Mining Sector • Stable government and strong EU member since 2004 • Mining-friendly jurisdiction with a long industrial heritage • Faster and more predictable permitting environment • Strong government support for critical raw materials • Skilled mining workfo

  8. Slide 8: A Globally Significant Nickel Deposit with Historic Proven Production

    A Globally Significant Nickel Deposit with Historic Proven Production Former Operating Soviet-Era Open-Pit Mine Historical Production: Large Project Potential with Tail Winds of EU 3.5 Mt @ 0.79% Ni = 28,000 tonnes Government Subsidies to Further Bolster NI 43-101 Planned infill drilling will upgrad

  9. Slide 9: A Rival to Some of the Worlds Largest Nickel Resources

    A Rival to Some of the Worlds Largest Nickel Resources CLOSEST GEOLOGICAL AND RESOURCE COMPARATIVES CLOSEST PROCESSING AND FINANCIAL-MODEL BENCHMARKING European-adjacent nickel laterite, similar tonnage scale, reported Good low-grade hydrometallurgical analogue as large tonnage, Çaldağ around 33.2 M

  10. Slide 10: Asset Overview: Szklary Nickel Project

    ASSET OVERVIEW: SZKLARY NICKEL PROJECT DESCRIPTION ACTION PLAN Historical Production: Infill Drilling: To complete NI 43-101 3.5 Mt @ 0.79% Ni = 28,00 0 tonnes Permitting Process: ~ 7 to 8 months followed by Mining License Tailings: application 2.0 Mt @ 1.00% potentially 20,000 tonnes CRMA Strategic

  11. Slide 11: SZKLARY Resource Analysis

    SZKLARY Resource Analysis COMMENTARY • Extensive land package covering most of the known nickel mineralization surrounding the town of Zabkowice Śląskie • Parts of Szklary Śląskie deposit previously drilled by concession owners KGHM. Mining activity ended 1983 by company not related to KGHM • Nickel

  12. Slide 12: SZKLARY Location & Select Drill Results

    SZKLARY LOCATION & SELECT DRILL RESULTS • Nickel mineralization at or near surface over an area over 7 km long by 1.5 km wide • Previous drilling outside the deposit area by KGHM defined additional mineralization between deposits • Portions of the deposits have been mined up until 1983 • Potential R

  13. Slide 13: SZKLARY Location & Select Drill Results

    SZKLARY LOCATION & SELECT DRILL RESULTS • Older Industrial buildings • Reclaimed slag area • Old waste dump, currently a stone factory Large historical mining camp near existing infrastructure in town with history of mining Future Mineral Resources Inc. CORPORATE PRESENTATION | July 2026 RESOURCES

  14. Slide 14: Deposits

    DEPOSITS High Grade Ni POTENTIAL HIGH GRADE Blocks located outside of previous mining areas REMAINS UNMINED • Older Industrial buildings Mined Areas • Reclaimed slag area • Old waste dump, currently a stone factory POTENTIAL HIGH-GRADE AREAS WILL SIGNIFICANTLY EXPAND RESOURCE, PENDING CONFIRMATION D

  15. Slide 15: Nickel Laterite Deposits Typical Cross Sections

    NICKEL LATERITE DEPOSITS TYPICAL CROSS SECTIONS • Many of the highest-grade nickel blocks occur outside the historically mined areas • Given the at- and near-surface nature of the mineralization and the low strip ratios, the recommencement of mining and processing is expected to be relatively low co

  16. Slide 16: Financial Base Case for Szklary

    FINANCIAL BASE CASE FOR SZKLAR Size of ore body: 34,900,00 Metric Tonnes Life of Mine 25 years LOM CAPEX 180,000,000 LOM CAPEX inclu. Sustaining CAPEX 230,000,000 LOM Revenue 5,509,115,388 LOM Government Royalties 46,686,186 LOM EBITDA 4,394,493,074 Above prices US$ The above calculations use the fo

  17. Slide 17: Financial Base Case for Szklary

    FINANCIAL BASE CASE FOR SZKLAR Total NPV / Post Tax FCFF (Discounted): 1,097,149,826 Total IRR: 48.35% CAPEX:180,00,000 OPEX: 31.24 US$ / MT Payback Period: 2 years 1 month AISC Nickel: 2.21 US$/Lbs Net Smelter Return (NSR): 164.65 US$ per tonne ore Cash Operating Margin: 133.23 US$ per tonne ore CA

  18. Slide 18: Thank you

    RESOURCES Thank you enquiries to info@fmresources.com Future Mineral Resources Inc. 198 Davenport Rd. Toronto, Ontario M5R 1J2

Future Mineral Resources — Investor Presentation (July 2026) on 6ix