ALTEO Energy Services PLC Class A · BET:ALTEO

ALTEO Energy Services PLC Class A — Alteo — Debt Investor Presentation (September 2019)

17 slides from ALTEO Energy Services PLC Class A's debt investor presentation, September 2019

  1. Slide 1: ALTEO Participation in the Bond Funding for Growth Scheme Road-Show

    Slide 1: ALTEO Participation in the Bond Funding for Growth Scheme Road-Show

    ALTEO PARTICIPATION IN THE BOND FUNDING FOR GROWTH SCHEME ROAD-SHOW

  2. Slide 2: Conditions of the Bond Funding for Growth Scheme vs. ALTEO goals

    Slide 2: Conditions of the Bond Funding for Growth Scheme vs. ALTEO goals

    Conditions of the Bond Funding for Growth Scheme vs. ALTEO goals 2 BGS condition ALTEO 1 or 2 issues with different maturities, maturities Maturity Min. 3 years, max. 10 years ranging from 8 to 10 years Minimum volume HUF 1 billion Planned: HUF 9.3 billion Either private or public, but the bond must

  3. Slide 3: Advantages of the BGS for ALTEO

    Slide 3: Advantages of the BGS for ALTEO

    Advantages of the BGS for ALTEO 3  The extension of the remaining average maturity of our debts better fits for the lifetime return of the energy projects  Tenors longer than 3–5 years are practically unavailable in the Hungarian corporate bond market  Administrative burdens of banking and report

  4. Slide 4: Energy Revolution

    Slide 4: Energy Revolution

    Energy Revolution Traditional grids Smart Grids Mechanical electricity meter Central, large Decentralised, * lectric vehicles scale power fuels regenerative 7” plants energy generation RWE SMARTHOME Home automation @\aLTeo

  5. Slide 5: Sustainable Smart Energy

    Slide 5: Sustainable Smart Energy

    Sustainable Smart Energy 5  High availability and  Maximise energy 24/7 technical Smart energy service covers an integrated savings potential and assistance optimise existing asset energy solution package, taking a holistic view  Proven and reliable base on the client's energy needs technologies

  6. Slide 6: ALTEO a vezető "Smart Energy" szolgáltató

    Slide 6: ALTEO a vezető "Smart Energy" szolgáltató

    ALTEO a vezető "Smart Energy" szolgáltató  Decentralizált, megújuló villamos energia termelés Energiatermelés  Magas hatékonyságú gáztüzelésű kogenerációs erőművek, amelyek rugalmas fel és és szabályozási leszabályozási kapacitásokkal rendelkeznek központ  Szabályozási központ, mely rendszerszint

  7. Slide 7: Leading Smart Energy Services Provider

    Slide 7: Leading Smart Energy Services Provider

    LEADING SMART ENERGY SERVICES PROVIDER  Decentralized, renewable electricity production Energy  Highly efficient gas-fired combined electricity and heat production with flexible production & electricity upload/download capabilities Control Centre  Control Centre provides electricity reserve suppl

  8. Slide 8: Investment considerations

    Slide 8: Investment considerations

    Investment considerations A leading “Smart Energy” provider with an attractive and diverse clientele, tailor-made solutions and a comprehensive range of products and services Excellently positioned to take advantage of a potential upswing in energy-related investments Already identified investment o

  9. Slide 9: Active investment and capital market presence from the foundation

    Slide 9: Active investment and capital market presence from the foundation

    Active investment and capital market presence from the foundation PROJECTS Beginning of retail energy Acquisition of 3 solar power plant projects, Completion of Monor trade, Acquisition of the Győr another wind energy storage facility R+D+I, solar power plant and Sopron PP’s and landfill power plant

  10. Slide 10: Dynamic growth

    Slide 10: Dynamic growth

    Dynamic growth 10 Profitability in 2014–2019 H1  Annual EBITDA capacity of (HUF billions) 2 500 2 314 18 389 20 000 HUF 2 billion, +/–15% before the 18 686 2 123 18 000 implementation of the investment 2 000 1 935 16 000 1 801 program is to increase significantly 1 429 14 000 1 500 13 948 12 141 af

  11. Slide 11: ALTEO Group on the map

    Slide 11: ALTEO Group on the map

    ALTEO Group on the map RENEWABLE INDUSTRIAL GAS ENGINES ENERGY ABE ano commerc my ‘AND HEATING GENERATION SERVICES POWER PLANTS ALTEO Group has signifi- By providing professional ALTEO Group operates cant competencies, among services to industrial plants, highly efficient, hydrocar- others, in the u

  12. Slide 12: Results of the investment program in progress

    Slide 12: Results of the investment program in progress

    Results of the investment program in progress 12 Renewable projects  A low-output landfill gas plant (0.5 MW) was inaugurated in 2017 Renewable capacities Renewable capacities in Debrecen in addition to the existing unit. We also acquired 2016, in MW 2019, in MW the Domaszék solar power plant (2 MW

  13. Slide 13: Consolidated profit and loss statement (IFRS)

    Slide 13: Consolidated profit and loss statement (IFRS)

    Consolidated profit and loss statement (IFRS) 13 In addition to the HUF 3,328 million growth in sales Consolidated profit and loss statement H1 2019 H1 2018 Change Change revenue, EBITDA also shows a rise of 127% over the same HUF million % period in the preceding year. compared to the over previous

  14. Slide 14: Consolidated balance sheet (IFRS)

    Slide 14: Consolidated balance sheet (IFRS)

    Consolidated Consolidated balance balance sheet (IFRS) sheet (IFRS) 14 Consolidated balance sheet 06/30/2019 12/31/2018 12/31/2018 Change Change data in HUF million non-audited comparison* audited million HUF % Non-current assets 24,087 13,809 13,716 10,278 75% Current assets 9,124 9,143 9,143 (19)

  15. Slide 15: ALTEO in the future – Key objectives

    Slide 15: ALTEO in the future – Key objectives

    ALTEO in the future – Key objectives 15 A B2B energy provider committed to sustainability Optimal utilization of Extension of control center, the opportunities provided growth potential for gas engine by METÁR capacities Improvement of waste-to- Increasing the range of energy energy business line se

  16. Slide 16: Preliminary bond issuance schedule

    Slide 16: Preliminary bond issuance schedule

    Preliminary bond issuance schedule 16 Submission of Communication Public auction: Road show IPO: the day Base Prospectus of bond terms ~Late (September after the (early and conditions: September, 2–13) auction September) Mid-September early October

  17. Slide 17: Further information

    Slide 17: Further information

    Further information 17 • Scope credit rating: https://www.scoperatings.com/#search/research/detail/160507EN • Information memorandum for the launch of 2022/II bond: https://alteo.hu/wp- content/uploads/2019/05/ALTEO_infomemo_20190529_signed.pdf • Consolidated financial statements for 2018: https://a

Source: Internet Archive copy of investors.alteo.hu