Slide 1: Heijmans Business Update
Heijmans Business Update ROADSHOW BOOKLET, SEPTEMBER 2021, BASED ON 2021 INTERIM RESULTS
Slide 2: Key figures H1 2021
2 Key figures H1 2021 (x € 1 million) H1 2021 H1 2020 2020 Revenues 881 839 1.746 Underlying EBITDA* 35 41 85 Underlying EBITDA* excluding Wintrack II 69 41 85 Result after tax 10 15 40 Earnings per share (in €) 0,43 0,71 1,85 Order book 2.039 1.972 1.946 Net debt (cash) -44 43 -37 Solvency 27% 27%
Slide 3: Contents
3 Contents • Company profile 4 - 13 • Strategy 14 - 25 • Environmental, Social, Corporate Governance (ESG) 26 - 31 • Dutch construction market 32 - 39 • 2020 Interim results / Outlook 40 - 51 • Financing, cash flow, financial statements 52 - 57 • Case studies 58 - 68 • Appendices 69 - 78 • Resumes E
Slide 4: Company profile
HEIJMANS ONE Company profile 4
Slide 5: History
5 COMPANY PROFILE History 1923 – founded by Jan Heijmans as Infra company 1945 and beyond - strong growth following WWII 1960’s - diversification towards residential building 1980’s - diversification towards property development 1993 – listing on Amsterdam Stock Exchange 1993/2007 – strong growth th
Slide 6: Organisation chart
6 Organisation chart Heijmans N.V. Risk Management Communications / IR Property Development Property Building & Infrastructure Development Technology
Slide 7: Heijmans at a glance
7 • Approximately 4,600 employees work on a daily basis for COMPANY PROFILE these business segments in the Netherlands. More than 99% of these employees are covered by a collective labour agreement. • Ambition to achieve a leading position on quality, Heijmans at a glance sustainability and profitab
Slide 8: Restructuring provides potential
Jan-2018 Jul-2009 Apr-2012 Dec-2012 Aug-2013 Dec- 2014 Appointment Nov-2009 2010 350 FTE Feb-2016 Feb-2017 of CRO, and € 100 mio 2011 disposal of 250 FTE ‘Sub-10’ disposal disposal of reductions Extension Extension merge of rights issue restructuring Telecom activities reduction share issue Heitkamp
Slide 9: Competitive strengths
Living (Residential and Property Development) • Development of urban and rural areas in both small and 9 large-scale projects with combination of own land bank COMPANY PROFILE positions & tender activity • Combining creativity and customer focus with strong knowledge of production process and afford
Slide 10: Living: Property Development
10 COMPANY PROFILE Living: Property Greenville – Leidsche Rijn Utrecht Development Property Development focuses on area development of both large and smaller-scale projects in urban and out-of-town areas. It fulfills the role of both initiator, developer and seller of (mainly) residential properties
Slide 11: Living: Residential
Student Housing Technical University - Eindhoven 11 COMPANY PROFILE Living: Residential Residential Building operates from five regions under central management. Its prime activity is new-build, but it also includes the restoration, redevelopment and renovation of houses. Being both Property Develop
Slide 12: Working: Non Residential
12 COMPANY PROFILE Working: Non Residential Non-Residential designs, creates and maintains high-quality electro-technical and mechanical installations (‘Services’), with a growing portion of long term maintenance contracts. It also realises large-scale and complex construction projects in the market
Slide 13: Connecting: Infrastructure
13 COMPANY PROFILE Connecting: LAUWERSMEER DYKE ENHANCEMENT Infrastructure Infra focuses on the construction, improvement and maintenance of the Dutch infrastructure and public spaces, including related installations and on-site objects. This includes roads, viaducts, tunnels, locks, dykes, water tr
Slide 14: Strategy
WINTRACK II - TENNET WIND PARK WIERINGERMEER DRINKING WATER PIPELINE – LOOSBROEK Strategy 14
Slide 15: Strategy until 2023
15 STRATEGY Strategy until 2023 FROM TO VISION: SPACIAL CONTOURS OF STRATEGIC AGENDA BASED 8 STRATEGIC THEMES TRANSLATED TOMORROW ON 3 MAIN THEMES INTO OPERATIONAL KPI’S Developments within Heijmans • To build on ‘Focus, discipline, excellence’ strategy of 2018-2019 to further enhance risk managemen
Slide 16: Strategy until 2023: Better and Smarter
16 STRATEGY Strategy until 2023: “Better” and “Smarter” Strategic theme Bold statements Concrete goals Better Safety We w ork safely or w e do not We won't be satisfied until w e have 0 accidents w ork at all IF rate < 1 in 2023 In 2023 w e have reached stage 4 of the 'safety ladder' in all our busi
Slide 17: Strategy until 2023: Sustainable
17 STRATEGY Strategy until 2023: “Sustainable” Sustainable Strategic theme Energy Bold statements Our production is CO2-neutral Concrete goals As of 2023, Heijmans is CO2 neutral. We offset any residual value and w e create energy-neutral In 2023, we can produce w ithout emission, in 2030 this is th
Slide 18: Innovation examples
VAN GOGH – ROOSEGAARDE BICYCLE PATH COMPOSITE BRIDGE HYDROFIT SEWER RELINING Kousrelining (renovation of waterpipes) SOLAR NOISE BARRIER BEYOND EYES SENSOR TECHNOLOGY BIKESCOUT SOLAR GUARD RAIL RECOFLEX ASPHALT
Slide 19: Strategy Property Development
19 STRATEGY Strategy Property Development Long term goal • Very strong demographic growth fundamentals hampered by various regulatory issues that impact Property Development: pipeline, including designation of new development areas by government, changes in environmental stable EBITDA- and private q
Slide 20: Monument Westerlicht in Alkmaar after renovation
MONUMENT ‘WESTERLICHT’ IN ALKMAAR AFTER RENOVATION
Slide 21: Strategy Building & Technology
21 STRATEGY Strategy Building & Technology Long term goal: • Building & Technology includes residential and non-residential activities, with commercial focus stable EBITDA- based on core competencies: Margin of 4-6% › Services: armed with its installation expertise, B&T is looking to forge more mult
Slide 22: Asset management projects
ASSET MANAGEMENT TERNEUZEN LOCK WILHELMINA LOCK ZAANDAM N280 ROERMOND - INFRA HORIZONTAL DIRECTION DRILLING (HDD) - INFRA BEATRIX LOCK PPP - NIEUWEGEIN
Slide 23: Strategy Infra
23 STRATEGY Strategy Infra Long term goal: • Balanced portfolio of centralised projects, regions / asset management, and specialisms, each stable EBITDA- roughly 1/3 of turnover Margin of 4-6% • Focus markets: Mobility (mainly line infrastructure + wet infra), Energy and Urban areas • Focus on safet
Slide 24: Crosscover X-roof, BikeScout, sensor technology in roads
CROSSCOVER X-ROOF SOLAR PANELS (PARTNERSHIP WITH EXASUN) BIKESCOUT TYRE PRESSURE SENSOR TECHNOLOGY IN ROADS
Slide 25: Focus on innovation
Examples of innovations: 25 • Heijmans ONE portable house > 200 houses now sold; STRATEGY • Smart and efficient building management by using sensor technology to generate data on comfort, occupation and usage through Beyond Eyes technology: 10,000+ sensors installed; • Smart living concept: standard
Slide 26: Environmental Social Corporate Governance
ZUIDERHAVEN, HARLINGEN Environmental Social Corporate Governance 26
Slide 27: ESG
Ranking / certification Institute Score ‘20/’21 • Increased sustainability requirements in 1 Forrest50 FSC 2nd 27 2 Carbon disclosure CDP B residential and non residential buildings 3 Transparencybenchmark Ministry of Economic 12th ESG 4 ISO 14001 Affairs & Climate Kiwa N/A • Nature inclusive area d
Slide 28: Asset management projects
ASSET MANAGEMENT TERNEUZEN LOCK WILHELMINA LOCK ZAANDAM BEATRIX LOCK PPP - NIEUWEGEIN
Slide 29: ESG policy Heijmans
29 ESG policy Heijmans • Digitalisation / Production technology: several initiatives to improve efficiency of materials and impact on environment • Energy: target to be CO2 neutral in 2023 • Materials: we aim for 100% circularity in new projects in 2023 • Space: our developments are green, blue and
Slide 30: ESG policy Heijmans
30 ESG policy Heijmans • Safety: With our GO! Programme we aim for IF rate < 1 in 2023 • Process improvement: strong focus on performance measurement and customer satisfaction against clear targets • Quality of the organization: HR policy to bind, attract & retain employees. Programmes for trainees,
Slide 31: ESG policy Heijmans
31 ESG policy Heijmans • Risk management & Process improvement › Full implementation of Corporate Governance Code, Compliance Office and Integrity commission › Strong lines of defense, including Internal Audit and Risk Office • Quality of the organization: Transparant interaction with stakeholders (
Slide 32: Dutch Construction Market
LIGHT ART THE SWARM IN EINDHOVEN (WON THE ZUIDASDOK NATIONAL STEEL AWARD –2020) AMSTERDAM Dutch Construction Market 32
Slide 33: Nitrogen issue explained
DUTCH CONSTRUCTION MARKET 33 Nitrogen issue explained • NL: 166 designated ‘natura 2000’ areas: nature areas protected by European law • 118 with habitats sensible to nitrogen emissions • Until May 2019, the “Program Approach Nitrogen” (PAS) allowed to include positive effects of future developments
Slide 34: Nitrogen: impact Heijmans
DUTCH CONSTRUCTION MARKET 34 Nitrogen: impact Heijmans • Heijmans: Technical solutions / innovations are being explored • Government: several upcoming measures need to be reconsidered with additional focus on ‘compensation measures’ in requirements • Until now, no Heijmans projects in execution are
Slide 35: PFAS issue explained
DUTCH CONSTRUCTION MARKET 35 PFAS issue explained • PFAS is a family name for 6.000 material, including Pfos, Pfoa and GenX and is being used for decades in all kind of applications • PFAS is strong, mobile (especially in water) and hardly degradable • Hundreds of locations known in the Netherlands,
Slide 36: Dutch market
36 • EIB (January 2021) reported a 0,5% decrease of the sector DUTCH CONSTRUCTION MARKET in ‘20 and expects a 3,5% decrease in ’21. Given overall macro-economic impact of Covid 19 and impact of earlier crises, current production levels remain relatively strong • Considerable differences across subse
Slide 37: Dutch housing market
DUTCH CONSTRUCTION MARKET 37 Dutch housing market Fundamentals have improved considerably since 2014 after 7 years of declining market: • Historically low interest rates, increased consumer confidence and government policies (limiting tax deductibility and revised social housing policy) have resulte
Slide 38: Dutch housing market
Dutch housing market DUTCH CONSTRUCTION MARKET 38 Number of houses for sale Average sales price houses (in absolute amounts and annual growth rate) Source: NVM annual update 2020 (January 2021) Expected annual growth in demand for homes and homes inventory, as well as homes shortage (2021-2050). Sou
Slide 39: Dutch housing market
Dutch housing market 39 Housing shortage in 2021 and 2034 across the country Growth in households across the country (2021-2034) Source: Primos (2021)
Slide 40: Heijmans 2021 interim results: Operationally excellent first half
GZG DEVELOPMENT – ‘S HERTOGENBOSCH “Heijmans 2021 interim results: Operationally excellent first half” Ton Hillen, CEO Heijmans N.V. August 20, 2021 40
Slide 41: Safety
41 Safety Trend in number of accidents (incl. subcontractors and Trend IF figure (own personnel, incl. insourced personnel) replacement work) *IF- Injury Frequency = number of accidents resulting in absenteeism over the past 12 months / number of hours worked over the past 12 months * 1,000,000 (Tar
Slide 42: One concept, Various applications
One concept, Various applications HEIJMANS HOMEBRAND HOUSES – RESIDENTIAL FULLY STANDARDISED PROCESS
Slide 43: Highlights H1 2021
43 Highlights H1 2021 • Revenue higher than last year thanks to Infra and Property development • Rising profit margin in all sectors, good project results • Property development & Residential building profit from current housing market • Cash position has developed positively, H1 net cash € 44 mln •
Slide 44: Wintrack II – Tennet Infra
heijmans WINTRACK II - TENNET INFRA 44
Slide 45: Tennet arbitration
45 Tennet arbitration • Project awarded in February 2017 with original contract value of appr. € 250 mln • Two contracts for the design and construction of innovative, hybrid (steel/concrete) pylons on two new high-voltage transmission lines, Eemshaven-Vierverlaten and Borssele- Rilland, to be carri
Slide 46: Help and local support in Limburg after floods
46 HELP AND LOCAL SUPPORT IN LIMBURG, AFTER THE PROVINCE WAS HIT BY FLOODS
Slide 47: Property development: rising revenue and result
47 Property development: rising revenue and result ∆% x € 1 million H1 2021 H1 2020 2020 2021-2020 Revenues 288 224 482 29% Underlying EBITDA 19 14 30 Underlying EBITDA margin 6,6% 6,3% 6,2% Order book 571 492 540 • Continued pressure on the housing market • Excellent start to 2021: more home sales
Slide 48: Building & Technology profits from housing market
48 Building & Technology profits from housing market ∆% x € 1 million H1 2021 H1 2020 2020 2021-2020 Revenues 383 470 920 -19% Underlying EBITDA 16 14 25 Underlying EBITDA margin 4,2% 3,0% 2,7% Order book 1.181 1.172 1.101 • Revenue declined by around 20% due to lower volume in large projects, profi
Slide 49: Infra: strong performance
49 Infra: strong performance ∆% x € 1 million H1 2021 H1 2020 2020 2021-2020 Revenues 375 310 662 21% Underlying EBITDA (excluding Wintrack II) 37 17 36 Underlying EBITDA margin 9,9% 5,5% 5,4% Underlying EBITDA (including Wintrack II) 3 17 36 Order book 750 704 731 • Strong performance, project resu
Slide 50: Development of net debt
50 Development of net debt • Good cash flow driven by strong Omvang syndicaatslening versus gebruik syndicaatslening Size of credit facility versus usage and net cash position 150 operational performance and 125 100 continued strong working capital. 75 H1 2021: 50 25 › average net debt (365 days) 0
Slide 51: Taxes
51 Taxes • Effective tax rate in H1 21.9% (H1 2020: 30.1%) • With effect from 2022, only 50% of profit above € 1 mln can be offset against historical losses, but no longer any time limit on the use of tax loss carry-forwards • As measurement is based on the same time horizon as the premises from las
Slide 52: Pilot Beyond Eyes data driven services
PILOT BEYOND EYES DATA DRIVEN SERVICES AEGON HEAD OFFICE THE HAGUE BUILDING & TECHNOLOGY > NON RESIDENTIAL SERVICES
Slide 53: Outlook: comparable result to 2020
53 Outlook: comparable result to 2020 • We are on track to record results comparable to last year, including WinTrack II provision • Primarily at Infra and Property development, we expect excellent operational results • As a result of the phasing of projects, with a number of projects already comple
Slide 54: Financing, Cash flow, Financial statements
KONINGSTUNNEL – THE HAGUE Financing, Cash flow, Financial statements 54
Slide 55: Financing in place
55 Main characteristics Syndicated Loan Facility: • Facility with ABN Amro, ING and Rabobank, most Financing in place recently amended and extended in April 2021 • Total committed amount of € 117.5 mln, with € 20 mln The most significant financing arrangements include: of this in the form of an over
Slide 56: Willemspoort North - Residential
ANDERE FOTO VAN FENIX I WILLEMSPOORT NORTH - RESIDENTIAL WILLEMSPOORT NOORD, ‘S-HERTOGENBOSCH
Slide 57: Financial covenants
2021 H1 2020 FY 2020 H1 Amounts in € millions Reported Net debt -43,6 -37,2 43,3 57 Adjustments: Net debt Joint Ventures (IFRS 11 impact) 24,1 33,6 57,0 Net debt non recourse project financings -38,3 -40,3 -74,1 Cumulativ e preference shares B -30,7 -41,8 -41,8 Other Net debt covenants (A) 0,9 -87,7
Slide 58: Financial statements: P&L
H1 2021 H1 2020 2020 58 x € 1 million FINANCIAL STATEMENTS Revenues 881 839 1.746 Property development 19 14 30 Building & Technology 16 14 25 Infra (excluding Wintrack II) 37 17 36 Wintrack II -34 Corporate -3 -4 -6 P&L Underlying EBITDA 35 41 85 Correction EBITDA joint ventures -4 5 10 Write down
Slide 59: Balance sheet
3. Condensed consolidated statement of financial position x € 1 million ASSETS 30 June 2021 31 December 2020 30 June 2020 59 Non-current assets Property, plant and equipment 46 45 44 Right-of-use assets 75 82 81 FINANCIAL STATEMENTS Intangible assets 74 75 75 Joint ventures and associates 84 73 66 O
Slide 60: Case studies
ELASTOCOAST - WADDENZEEDIJK Case studies 60
Slide 61: Project: Noorderhaven area development
PROJECT: NOORDERHAVEN AREA DEVELOPMENT SECTOR: PROPERTY DEVELOPEMENT IN COMBINATION BUILDING & TECHNOLOGY (RESIDENTIAL) ORIGINAL CONTRACT SUM: € 60 MLN (FIELD 2/3 ONLY, MULTIPLE PLOTS ALREADY COMPLETED AND STILL TO BE DEVELOPED START: EARLY COMPLETION: Q4 2022 FENIX, ROTTERDAM
Slide 62: Project: Vertical Amsterdam Sloterdijk
PROJECT: VERTICAL AMSTERDAM SLOTERDIJK PROJECT: SECTOR: PROPERTY NEW AMSTERDAM DEVELOPEMENT COURT HOUSE IN COMBINATION WITH SECTOR: BUILDING BUILDING & TECHNOLOGY & TECHNOLOGY > HIGH>RISE NONRESIDENTIAL RESIDENTIALBUILDINGS SERVICES ORIGINAL CONTRACT SUM: € 60 SIZE: MLN START: EARLYSTART: 2020 MAINT
Slide 63: Project: New Amsterdam Court House
PROJECT: NEW AMSTERDAM COURT HOUSE SECTOR: BUILDING & TECHNOLOGY > NON RESIDENTIAL PROJECTS ORIGINAL CONTRACT SUM: € 216 MLN (90% SHARE) START: 2016 COMPLETED Q1 2021, NOW IN NEW AMSTERDAM MULTI COURT PERIOD YR MAINTENANCE HOUSE
Slide 64: Project: European Medicines Agency Amsterdam
PROJECT: EUROPEAN MEDICINES AGENCY AMSTERDAM SECTOR: BUILDING & TECHNOLOGY > NON RESIDENTIAL PROJECTS ORIGINAL CONTRACT SUM: € 190 MLN (50% SHARE) START: 2018 COMPLETED: 2019EUROPEAN (NOW IN MEDICINES AGENCY, AMSTERDAM MULTI YR MAINTENANCE PERIOD)
Slide 65: Project: Science Campus, University of Leiden
PROJECT: SCIENCE CAMPUS, UNIVERSITY OF LEIDEN SECTOR: BUILDING & TECHNOLOGY, NON RESIDENTIAL ORIGINAL CONTRACT SUM: € 71 MLN START: 2021 EXPECTED COMPLETION: Q4 2023
Slide 66: Carmelflats Beek, Renovation Lefier Emmen
CARMELFLATS - BEEK PROJECT: SEVERAL PROJECTS SECTOR: BUILDING & TECHNOLOGY > RESIDENTIAL SIZE: ROUGHLY € 50 MLN ANNUALLY START: N/A RENOVATION LEFIER - EMMEN COMPLETION: N/A
Slide 67: Project: IXAS / A9 Gaasperdammertunnel
PROJECT: IXAS / A9 GAASPERDAMMERTUNNEL SECTOR: INFRA > CENTRALISED PROJECTS ORIGINAL CONTRACT SUM: APPR. € 600 MLN (33,33% SHARE) START: 2015 COMPLETION: H1 2021 (EXL MULTI YEAR MAINTENANCE PERIOD)
Slide 68: Project: A1 Apeldoorn/Azelo
PROJECT: A1 APELDOORN/AZELO SECTOR: INFRA > CENTRALISED PROJECTS CONTRACT SUM: APPR. € 175 MLN (100% SHARE) START: 2019 COMPLETION: 2021
Slide 69: Project: Two projects for network operator Liander
PROJECT: TWO PROJECTS FOR NETWORK OPERATOR LIANDER SECTOR: INFRA > ASSET MANAGEMENT ORIGINAL CONTRACT PROJECT:SUM: IXAS APPR. € 120 MLN (100% SHARE) / A9 GAASPERDAMMERTUNNEL PROJECT 1: 10 YEAR SECTOR: MAINTENANCE INFRA AND PROJECTS > CENTRALISED UPGRADE ORIGINALCONTRACT CONTRACTFOR SUM:1.350 MEDIUM
Slide 70: Project: Maincontract Schiphol
PROJECT: MAINCONTRACT SCHIPHOL SECTOR: INFRA > ASSET MANAGEMENT ORIGINAL CONTRACT SUM: APPR. € 45 MLN ANNUALLY START: 2019 COMPLETION: 2028 PROJECT: TWO PROJECTS FOR NETWORK OPERATOR LIANDER SECTOR: INFRA > ASSET MANAGEMENT ORIGINAL CONTRACT PROJECT:SUM: IXAS APPR. € 120 MLN (100% SHARE) / A9 GAASPE
Slide 71: Appendices
MAINCONTRACT SCHIPHOL AIRPORT Appendices 71
Slide 72: Executive Board
72 Ton (A.G.J.) Hillen (1961), Member of the APPENDIX Executive Board as of 18 April 2012, Chairman of the Executive Board as of 1 December 2016. responsible for: General Affairs, Infrastructure, Property Development, Building & Technology, Innovation, HR / Management Development, Executive Board Pr
Slide 73: Taxes
73 Taxes • The effective tax rate was minus 0.3% in 2020 (2019: 13.8%), strongly influenced by recognition of previously unrecognised losses • At year-end 2020, Heijmans still had € 165 million in tax loss carry-forwards, € 36 million of which has not been recognised, while the remainder has already
Slide 74: Property development process
74 APPENDIX Property development process Process and timing unsold unsold unsold sold sold sold sold sold sold sold sold sold sold Obtaining Start Start sale Start building Delivery to consumer Land position Property development 70/80% pre-sold 1-6 years 1-2 years 3-6 months 1-2 years Revenues recog
Slide 75: Risk management approach
75 • ‘Best in class’ project reporting providing good insight on project APPENDIX opportunities as well as risks, issues, cash flow and progress; • Uniform risk classification for all projects into three categories. Direct involvement from Executive Board in large and complex Risk management project
Slide 76: Towards one integrated ERP platform (SAP)
76 APPENDIX • Successful deployed to all employees and now implemented in all business segments Towards one • Proven project approach and timelines (Initiated in integrated ERP 2011, Blueprint Q4 2012, start roll-out 2013, implementation completed in 2018; platform (SAP) • Generic processes based up
Slide 77: IFRS % of completion method
77 APPENDIX IFRS % of completion method • Direct costing applied, i.e. the gross margin is recognized on the basis of the percentage of completion method. • In this method, 50% of the gross profit is recognized half way the project, and 100% at completion. • Suppose a EUR 100 mln with 10% gross marg
Slide 78: Project images in this handout
78 APPENDIX Project images in this handout Slide Project Locat ion Business Segment 4 Heijmans One Replaceable Residential 10 Greenville resp. Maanwijk Utrecht Leidsche Rijn resp. Leusden Property Development / Residential 11 Student Housing Technical University Eindhoven Residential 12 Hart van Zui
Slide 79: Contact details and disclaimer
79 CONTACT DETAILS HEIJMANS N.V. CONTACT: PO Box 2 Guido Peters 5240 BB Rosmalen, The Netherlands Investor Relations Heijmans www.heijmans.nl +31 73 543 5482 http://twitter.com/HeijmansNL gpeters@heijmans.nl DISCLAIMER This presentation has been prepared by and is the responsibility of Heijmans N.V.
Slide 80: Social media
heijmansnl @heijmansnl heijmans heijmansnl
Slide 81: Heijmans Business Update
Heijmans Business Update ROADSHOW BOOKLET, SEPTEMBER 2021, BASED ON 2021 INTERIM RESULTS
Slide 82: Key figures H1 2021
2 Key figures H1 2021 (x € 1 million) H1 2021 H1 2020 2020 Revenues 881 839 1.746 Underlying EBITDA* 35 41 85 Underlying EBITDA* excluding Wintrack II 69 41 85 Result after tax 10 15 40 Earnings per share (in €) 0,43 0,71 1,85 Order book 2.039 1.972 1.946 Net debt (cash) -44 43 -37 Solvency 27% 27%
Slide 83: Contents
3 Contents • Company profile 4 - 13 • Strategy 14 - 25 • Environmental, Social, Corporate Governance (ESG) 26 - 31 • Dutch construction market 32 - 39 • 2020 Interim results / Outlook 40 - 51 • Financing, cash flow, financial statements 52 - 57 • Case studies 58 - 68 • Appendices 69 - 78 • Resumes E
Slide 84: Company profile
HEIJMANS ONE Company profile 4
Slide 85: History
5 COMPANY PROFILE History 1923 – founded by Jan Heijmans as Infra company 1945 and beyond - strong growth following WWII 1960’s - diversification towards residential building 1980’s - diversification towards property development 1993 – listing on Amsterdam Stock Exchange 1993/2007 – strong growth th
Slide 86: Organisation chart
6 Organisation chart Heijmans N.V. Risk Management Communications / IR Property Development Property Building & Infrastructure Development Technology
Slide 87: Heijmans at a glance
7 • Approximately 4,600 employees work on a daily basis for COMPANY PROFILE these business segments in the Netherlands. More than 99% of these employees are covered by a collective labour agreement. • Ambition to achieve a leading position on quality, Heijmans at a glance sustainability and profitab
Slide 88: Restructuring provides potential
Jan-2018 Jul-2009 Apr-2012 Dec-2012 Aug-2013 Dec- 2014 Appointment Nov-2009 2010 350 FTE Feb-2016 Feb-2017 of CRO, and € 100 mio 2011 disposal of 250 FTE ‘Sub-10’ disposal disposal of reductions Extension Extension merge of rights issue restructuring Telecom activities reduction share issue Heitkamp
Slide 89: Competitive strengths
Living (Residential and Property Development) • Development of urban and rural areas in both small and 9 large-scale projects with combination of own land bank COMPANY PROFILE positions & tender activity • Combining creativity and customer focus with strong knowledge of production process and afford
Slide 90: Living: Property Development
10 COMPANY PROFILE Living: Property Greenville – Leidsche Rijn Utrecht Development Property Development focuses on area development of both large and smaller-scale projects in urban and out-of-town areas. It fulfills the role of both initiator, developer and seller of (mainly) residential properties
Slide 91: Living: Residential
Student Housing Technical University - Eindhoven 11 COMPANY PROFILE Living: Residential Residential Building operates from five regions under central management. Its prime activity is new-build, but it also includes the restoration, redevelopment and renovation of houses. Being both Property Develop
Slide 92: Working: Non Residential
12 COMPANY PROFILE Working: Non Residential Non-Residential designs, creates and maintains high-quality electro-technical and mechanical installations (‘Services’), with a growing portion of long term maintenance contracts. It also realises large-scale and complex construction projects in the market
Slide 93: Connecting: Infrastructure
13 COMPANY PROFILE Connecting: LAUWERSMEER DYKE ENHANCEMENT Infrastructure Infra focuses on the construction, improvement and maintenance of the Dutch infrastructure and public spaces, including related installations and on-site objects. This includes roads, viaducts, tunnels, locks, dykes, water tr
Slide 94: Strategy
WINTRACK II - TENNET WIND PARK WIERINGERMEER DRINKING WATER PIPELINE – LOOSBROEK Strategy 14
Slide 95: Strategy until 2023
15 STRATEGY Strategy until 2023 FROM TO VISION: SPACIAL CONTOURS OF STRATEGIC AGENDA BASED 8 STRATEGIC THEMES TRANSLATED TOMORROW ON 3 MAIN THEMES INTO OPERATIONAL KPI’S Developments within Heijmans • To build on ‘Focus, discipline, excellence’ strategy of 2018-2019 to further enhance risk managemen
Slide 96: Strategy until 2023: Better and Smarter
16 STRATEGY Strategy until 2023: “Better” and “Smarter” Strategic theme Bold statements Concrete goals Better Safety We w ork safely or w e do not We won't be satisfied until w e have 0 accidents w ork at all IF rate < 1 in 2023 In 2023 w e have reached stage 4 of the 'safety ladder' in all our busi
Slide 97: Strategy until 2023: Sustainable
17 STRATEGY Strategy until 2023: “Sustainable” Sustainable Strategic theme Energy Bold statements Our production is CO2-neutral Concrete goals As of 2023, Heijmans is CO2 neutral. We offset any residual value and w e create energy-neutral In 2023, we can produce w ithout emission, in 2030 this is th
Slide 98: Innovation examples
VAN GOGH – ROOSEGAARDE BICYCLE PATH COMPOSITE BRIDGE HYDROFIT SEWER RELINING Kousrelining (renovation of waterpipes) SOLAR NOISE BARRIER BEYOND EYES SENSOR TECHNOLOGY BIKESCOUT SOLAR GUARD RAIL RECOFLEX ASPHALT
Slide 99: Strategy Property Development
19 STRATEGY Strategy Property Development Long term goal • Very strong demographic growth fundamentals hampered by various regulatory issues that impact Property Development: pipeline, including designation of new development areas by government, changes in environmental stable EBITDA- and private q
Slide 100: Monument Westerlicht in Alkmaar after renovation
MONUMENT ‘WESTERLICHT’ IN ALKMAAR AFTER RENOVATION
Slide 101: Strategy Building & Technology
21 STRATEGY Strategy Building & Technology Long term goal: • Building & Technology includes residential and non-residential activities, with commercial focus stable EBITDA- based on core competencies: Margin of 4-6% › Services: armed with its installation expertise, B&T is looking to forge more mult
Slide 102: Asset management projects
ASSET MANAGEMENT TERNEUZEN LOCK WILHELMINA LOCK ZAANDAM N280 ROERMOND - INFRA HORIZONTAL DIRECTION DRILLING (HDD) - INFRA BEATRIX LOCK PPP - NIEUWEGEIN
Slide 103: Strategy Infra
23 STRATEGY Strategy Infra Long term goal: • Balanced portfolio of centralised projects, regions / asset management, and specialisms, each stable EBITDA- roughly 1/3 of turnover Margin of 4-6% • Focus markets: Mobility (mainly line infrastructure + wet infra), Energy and Urban areas • Focus on safet
Slide 104: Crosscover X-roof, BikeScout, sensor technology in roads
CROSSCOVER X-ROOF SOLAR PANELS (PARTNERSHIP WITH EXASUN) BIKESCOUT TYRE PRESSURE SENSOR TECHNOLOGY IN ROADS
Slide 105: Focus on innovation
Examples of innovations: 25 • Heijmans ONE portable house > 200 houses now sold; STRATEGY • Smart and efficient building management by using sensor technology to generate data on comfort, occupation and usage through Beyond Eyes technology: 10,000+ sensors installed; • Smart living concept: standard
Slide 106: Environmental Social Corporate Governance
ZUIDERHAVEN, HARLINGEN Environmental Social Corporate Governance 26
Slide 107: ESG
Ranking / certification Institute Score ‘20/’21 • Increased sustainability requirements in 1 Forrest50 FSC 2nd 27 2 Carbon disclosure CDP B residential and non residential buildings 3 Transparencybenchmark Ministry of Economic 12th ESG 4 ISO 14001 Affairs & Climate Kiwa N/A • Nature inclusive area d
Slide 108: Asset management projects
ASSET MANAGEMENT TERNEUZEN LOCK WILHELMINA LOCK ZAANDAM BEATRIX LOCK PPP - NIEUWEGEIN
Slide 109: ESG policy Heijmans
29 ESG policy Heijmans • Digitalisation / Production technology: several initiatives to improve efficiency of materials and impact on environment • Energy: target to be CO2 neutral in 2023 • Materials: we aim for 100% circularity in new projects in 2023 • Space: our developments are green, blue and
Slide 110: ESG policy Heijmans
30 ESG policy Heijmans • Safety: With our GO! Programme we aim for IF rate < 1 in 2023 • Process improvement: strong focus on performance measurement and customer satisfaction against clear targets • Quality of the organization: HR policy to bind, attract & retain employees. Programmes for trainees,
Slide 111: ESG policy Heijmans
31 ESG policy Heijmans • Risk management & Process improvement › Full implementation of Corporate Governance Code, Compliance Office and Integrity commission › Strong lines of defense, including Internal Audit and Risk Office • Quality of the organization: Transparant interaction with stakeholders (
Slide 112: Dutch Construction Market
LIGHT ART THE SWARM IN EINDHOVEN (WON THE ZUIDASDOK NATIONAL STEEL AWARD –2020) AMSTERDAM Dutch Construction Market 32
Slide 113: Nitrogen issue explained
DUTCH CONSTRUCTION MARKET 33 Nitrogen issue explained • NL: 166 designated ‘natura 2000’ areas: nature areas protected by European law • 118 with habitats sensible to nitrogen emissions • Until May 2019, the “Program Approach Nitrogen” (PAS) allowed to include positive effects of future developments
Slide 114: Nitrogen: impact Heijmans
DUTCH CONSTRUCTION MARKET 34 Nitrogen: impact Heijmans • Heijmans: Technical solutions / innovations are being explored • Government: several upcoming measures need to be reconsidered with additional focus on ‘compensation measures’ in requirements • Until now, no Heijmans projects in execution are
Slide 115: PFAS issue explained
DUTCH CONSTRUCTION MARKET 35 PFAS issue explained • PFAS is a family name for 6.000 material, including Pfos, Pfoa and GenX and is being used for decades in all kind of applications • PFAS is strong, mobile (especially in water) and hardly degradable • Hundreds of locations known in the Netherlands,
Slide 116: Dutch market
36 • EIB (January 2021) reported a 0,5% decrease of the sector DUTCH CONSTRUCTION MARKET in ‘20 and expects a 3,5% decrease in ’21. Given overall macro-economic impact of Covid 19 and impact of earlier crises, current production levels remain relatively strong • Considerable differences across subse
Slide 117: Dutch housing market
DUTCH CONSTRUCTION MARKET 37 Dutch housing market Fundamentals have improved considerably since 2014 after 7 years of declining market: • Historically low interest rates, increased consumer confidence and government policies (limiting tax deductibility and revised social housing policy) have resulte
Slide 118: Dutch housing market
Dutch housing market DUTCH CONSTRUCTION MARKET 38 Number of houses for sale Average sales price houses (in absolute amounts and annual growth rate) Source: NVM annual update 2020 (January 2021) Expected annual growth in demand for homes and homes inventory, as well as homes shortage (2021-2050). Sou
Slide 119: Dutch housing market
Dutch housing market 39 Housing shortage in 2021 and 2034 across the country Growth in households across the country (2021-2034) Source: Primos (2021)
Slide 120: Heijmans 2021 interim results: Operationally excellent first half
GZG DEVELOPMENT – ‘S HERTOGENBOSCH “Heijmans 2021 interim results: Operationally excellent first half” Ton Hillen, CEO Heijmans N.V. August 20, 2021 40
Slide 121: Safety
41 Safety Trend in number of accidents (incl. subcontractors and Trend IF figure (own personnel, incl. insourced personnel) replacement work) *IF- Injury Frequency = number of accidents resulting in absenteeism over the past 12 months / number of hours worked over the past 12 months * 1,000,000 (Tar
Slide 122: One concept, Various applications
One concept, Various applications HEIJMANS HOMEBRAND HOUSES – RESIDENTIAL FULLY STANDARDISED PROCESS
Slide 123: Highlights H1 2021
43 Highlights H1 2021 • Revenue higher than last year thanks to Infra and Property development • Rising profit margin in all sectors, good project results • Property development & Residential building profit from current housing market • Cash position has developed positively, H1 net cash € 44 mln •
Slide 124: Wintrack II – Tennet Infra
heijmans WINTRACK II - TENNET INFRA 44
Slide 125: Tennet arbitration
45 Tennet arbitration • Project awarded in February 2017 with original contract value of appr. € 250 mln • Two contracts for the design and construction of innovative, hybrid (steel/concrete) pylons on two new high-voltage transmission lines, Eemshaven-Vierverlaten and Borssele- Rilland, to be carri
Slide 126: Help and local support in Limburg after floods
46 HELP AND LOCAL SUPPORT IN LIMBURG, AFTER THE PROVINCE WAS HIT BY FLOODS
Slide 127: Property development: rising revenue and result
47 Property development: rising revenue and result ∆% x € 1 million H1 2021 H1 2020 2020 2021-2020 Revenues 288 224 482 29% Underlying EBITDA 19 14 30 Underlying EBITDA margin 6,6% 6,3% 6,2% Order book 571 492 540 • Continued pressure on the housing market • Excellent start to 2021: more home sales
Slide 128: Building & Technology profits from housing market
48 Building & Technology profits from housing market ∆% x € 1 million H1 2021 H1 2020 2020 2021-2020 Revenues 383 470 920 -19% Underlying EBITDA 16 14 25 Underlying EBITDA margin 4,2% 3,0% 2,7% Order book 1.181 1.172 1.101 • Revenue declined by around 20% due to lower volume in large projects, profi
Slide 129: Infra: strong performance
49 Infra: strong performance ∆% x € 1 million H1 2021 H1 2020 2020 2021-2020 Revenues 375 310 662 21% Underlying EBITDA (excluding Wintrack II) 37 17 36 Underlying EBITDA margin 9,9% 5,5% 5,4% Underlying EBITDA (including Wintrack II) 3 17 36 Order book 750 704 731 • Strong performance, project resu
Slide 130: Development of net debt
50 Development of net debt • Good cash flow driven by strong Omvang syndicaatslening versus gebruik syndicaatslening Size of credit facility versus usage and net cash position 150 operational performance and 125 100 continued strong working capital. 75 H1 2021: 50 25 › average net debt (365 days) 0
Slide 131: Taxes
51 Taxes • Effective tax rate in H1 21.9% (H1 2020: 30.1%) • With effect from 2022, only 50% of profit above € 1 mln can be offset against historical losses, but no longer any time limit on the use of tax loss carry-forwards • As measurement is based on the same time horizon as the premises from las
Slide 132: Pilot Beyond Eyes data driven services
PILOT BEYOND EYES DATA DRIVEN SERVICES AEGON HEAD OFFICE THE HAGUE BUILDING & TECHNOLOGY > NON RESIDENTIAL SERVICES
Slide 133: Outlook: comparable result to 2020
53 Outlook: comparable result to 2020 • We are on track to record results comparable to last year, including WinTrack II provision • Primarily at Infra and Property development, we expect excellent operational results • As a result of the phasing of projects, with a number of projects already comple
Slide 134: Financing, Cash flow, Financial statements
KONINGSTUNNEL – THE HAGUE Financing, Cash flow, Financial statements 54
Slide 135: Financing in place
55 Main characteristics Syndicated Loan Facility: • Facility with ABN Amro, ING and Rabobank, most Financing in place recently amended and extended in April 2021 • Total committed amount of € 117.5 mln, with € 20 mln The most significant financing arrangements include: of this in the form of an over
Slide 136: Willemspoort North - Residential
ANDERE FOTO VAN FENIX I WILLEMSPOORT NORTH - RESIDENTIAL WILLEMSPOORT NOORD, ‘S-HERTOGENBOSCH
Slide 137: Financial covenants
2021 H1 2020 FY 2020 H1 Amounts in € millions Reported Net debt -43,6 -37,2 43,3 57 Adjustments: Net debt Joint Ventures (IFRS 11 impact) 24,1 33,6 57,0 Net debt non recourse project financings -38,3 -40,3 -74,1 Cumulativ e preference shares B -30,7 -41,8 -41,8 Other Net debt covenants (A) 0,9 -87,7
Slide 138: Financial statements: P&L
H1 2021 H1 2020 2020 58 x € 1 million FINANCIAL STATEMENTS Revenues 881 839 1.746 Property development 19 14 30 Building & Technology 16 14 25 Infra (excluding Wintrack II) 37 17 36 Wintrack II -34 Corporate -3 -4 -6 P&L Underlying EBITDA 35 41 85 Correction EBITDA joint ventures -4 5 10 Write down
Slide 139: Balance sheet
3. Condensed consolidated statement of financial position x € 1 million ASSETS 30 June 2021 31 December 2020 30 June 2020 59 Non-current assets Property, plant and equipment 46 45 44 Right-of-use assets 75 82 81 FINANCIAL STATEMENTS Intangible assets 74 75 75 Joint ventures and associates 84 73 66 O
Slide 140: Case studies
ELASTOCOAST - WADDENZEEDIJK Case studies 60
Slide 141: Project: Noorderhaven area development
PROJECT: NOORDERHAVEN AREA DEVELOPMENT SECTOR: PROPERTY DEVELOPEMENT IN COMBINATION BUILDING & TECHNOLOGY (RESIDENTIAL) ORIGINAL CONTRACT SUM: € 60 MLN (FIELD 2/3 ONLY, MULTIPLE PLOTS ALREADY COMPLETED AND STILL TO BE DEVELOPED START: EARLY COMPLETION: Q4 2022 FENIX, ROTTERDAM
Slide 142: Project: Vertical Amsterdam Sloterdijk
PROJECT: VERTICAL AMSTERDAM SLOTERDIJK PROJECT: SECTOR: PROPERTY NEW AMSTERDAM DEVELOPEMENT COURT HOUSE IN COMBINATION WITH SECTOR: BUILDING BUILDING & TECHNOLOGY & TECHNOLOGY > HIGH>RISE NONRESIDENTIAL RESIDENTIALBUILDINGS SERVICES ORIGINAL CONTRACT SUM: € 60 SIZE: MLN START: EARLYSTART: 2020 MAINT
Slide 143: Project: New Amsterdam Court House
PROJECT: NEW AMSTERDAM COURT HOUSE SECTOR: BUILDING & TECHNOLOGY > NON RESIDENTIAL PROJECTS ORIGINAL CONTRACT SUM: € 216 MLN (90% SHARE) START: 2016 COMPLETED Q1 2021, NOW IN NEW AMSTERDAM MULTI COURT PERIOD YR MAINTENANCE HOUSE
Slide 144: Project: European Medicines Agency Amsterdam
PROJECT: EUROPEAN MEDICINES AGENCY AMSTERDAM SECTOR: BUILDING & TECHNOLOGY > NON RESIDENTIAL PROJECTS ORIGINAL CONTRACT SUM: € 190 MLN (50% SHARE) START: 2018 COMPLETED: 2019EUROPEAN (NOW IN MEDICINES AGENCY, AMSTERDAM MULTI YR MAINTENANCE PERIOD)
Slide 145: Project: Science Campus, University of Leiden
PROJECT: SCIENCE CAMPUS, UNIVERSITY OF LEIDEN SECTOR: BUILDING & TECHNOLOGY, NON RESIDENTIAL ORIGINAL CONTRACT SUM: € 71 MLN START: 2021 EXPECTED COMPLETION: Q4 2023
Slide 146: Carmelflats Beek, Renovation Lefier Emmen
CARMELFLATS - BEEK PROJECT: SEVERAL PROJECTS SECTOR: BUILDING & TECHNOLOGY > RESIDENTIAL SIZE: ROUGHLY € 50 MLN ANNUALLY START: N/A RENOVATION LEFIER - EMMEN COMPLETION: N/A
Slide 147: Project: IXAS / A9 Gaasperdammertunnel
PROJECT: IXAS / A9 GAASPERDAMMERTUNNEL SECTOR: INFRA > CENTRALISED PROJECTS ORIGINAL CONTRACT SUM: APPR. € 600 MLN (33,33% SHARE) START: 2015 COMPLETION: H1 2021 (EXL MULTI YEAR MAINTENANCE PERIOD)
Slide 148: Project: A1 Apeldoorn/Azelo
PROJECT: A1 APELDOORN/AZELO SECTOR: INFRA > CENTRALISED PROJECTS CONTRACT SUM: APPR. € 175 MLN (100% SHARE) START: 2019 COMPLETION: 2021
Slide 149: Project: Two projects for network operator Liander
PROJECT: TWO PROJECTS FOR NETWORK OPERATOR LIANDER SECTOR: INFRA > ASSET MANAGEMENT ORIGINAL CONTRACT PROJECT:SUM: IXAS APPR. € 120 MLN (100% SHARE) / A9 GAASPERDAMMERTUNNEL PROJECT 1: 10 YEAR SECTOR: MAINTENANCE INFRA AND PROJECTS > CENTRALISED UPGRADE ORIGINALCONTRACT CONTRACTFOR SUM:1.350 MEDIUM
Slide 150: Project: Maincontract Schiphol
PROJECT: MAINCONTRACT SCHIPHOL SECTOR: INFRA > ASSET MANAGEMENT ORIGINAL CONTRACT SUM: APPR. € 45 MLN ANNUALLY START: 2019 COMPLETION: 2028 PROJECT: TWO PROJECTS FOR NETWORK OPERATOR LIANDER SECTOR: INFRA > ASSET MANAGEMENT ORIGINAL CONTRACT PROJECT:SUM: IXAS APPR. € 120 MLN (100% SHARE) / A9 GAASPE
Slide 151: Appendices
MAINCONTRACT SCHIPHOL AIRPORT Appendices 71
Slide 152: Executive Board
72 Ton (A.G.J.) Hillen (1961), Member of the APPENDIX Executive Board as of 18 April 2012, Chairman of the Executive Board as of 1 December 2016. responsible for: General Affairs, Infrastructure, Property Development, Building & Technology, Innovation, HR / Management Development, Executive Board Pr
Slide 153: Taxes
73 Taxes • The effective tax rate was minus 0.3% in 2020 (2019: 13.8%), strongly influenced by recognition of previously unrecognised losses • At year-end 2020, Heijmans still had € 165 million in tax loss carry-forwards, € 36 million of which has not been recognised, while the remainder has already
Slide 154: Property development process
74 APPENDIX Property development process Process and timing unsold unsold unsold sold sold sold sold sold sold sold sold sold sold Obtaining Start Start sale Start building Delivery to consumer Land position Property development 70/80% pre-sold 1-6 years 1-2 years 3-6 months 1-2 years Revenues recog
Slide 155: Risk management approach
75 • ‘Best in class’ project reporting providing good insight on project APPENDIX opportunities as well as risks, issues, cash flow and progress; • Uniform risk classification for all projects into three categories. Direct involvement from Executive Board in large and complex Risk management project
Slide 156: Towards one integrated ERP platform (SAP)
76 APPENDIX • Successful deployed to all employees and now implemented in all business segments Towards one • Proven project approach and timelines (Initiated in integrated ERP 2011, Blueprint Q4 2012, start roll-out 2013, implementation completed in 2018; platform (SAP) • Generic processes based up
Slide 157: IFRS % of completion method
77 APPENDIX IFRS % of completion method • Direct costing applied, i.e. the gross margin is recognized on the basis of the percentage of completion method. • In this method, 50% of the gross profit is recognized half way the project, and 100% at completion. • Suppose a EUR 100 mln with 10% gross marg
Slide 158: Project images in this handout
78 APPENDIX Project images in this handout Slide Project Locat ion Business Segment 4 Heijmans One Replaceable Residential 10 Greenville resp. Maanwijk Utrecht Leidsche Rijn resp. Leusden Property Development / Residential 11 Student Housing Technical University Eindhoven Residential 12 Hart van Zui
Slide 159: Contact details and disclaimer
79 CONTACT DETAILS HEIJMANS N.V. CONTACT: PO Box 2 Guido Peters 5240 BB Rosmalen, The Netherlands Investor Relations Heijmans www.heijmans.nl +31 73 543 5482 http://twitter.com/HeijmansNL gpeters@heijmans.nl DISCLAIMER This presentation has been prepared by and is the responsibility of Heijmans N.V.
Slide 160: Social media
heijmansnl @heijmansnl heijmans heijmansnl