Triton Minerals Limited · ASX:TON
Triton Minerals — Investor Presentation (October 2015)
18 slides from Triton Minerals's investor presentation, Oct 15, 2015
Slide 1: Corporate Presentation
For personal use only CORPORATE PRESENTATION 15 OCTOBER 2015
Slide 2: Corporate Snapshot
Corporate Snapshot Capital Structure Share Price Graph (ASX:TON) For personal use only Share Price [15 October 2015] A$ cents 22.0 Shares outstanding m 376.5 Options and performance rights m 38.2 Market capitalisation (undiluted) A$m 84 Cash & Funding Facility A$m ~23 Debt A$m 0 Directors & Major Sh
Slide 3: Key Points
Key Points For personal use only Nicanda Hill Project World’s largest flake graphite deposit 1.47Bt at 10.7%TGC Ancuabe Project World’s best flake graphite flotation characteristics Reliable long-term (generational) supply of premium quality flake graphite Ability to supply the best variety of graph
Slide 4: Multi-Faceted Staged Development Strategy
MULTI-FACETED STAGED DEVELOPMENT STRATEGY For personal use only OBJECTIVES: • Secure near term revenue streams • Market leading Strategic Partners • Secured access to patented technology, infrastructure and expertise in graphite mining • Secured access to established global network of diverse off-ta
Slide 5: Phase 1: YXGC Graphite Products Joint Venture (China) - 2016
PHASE 1: YXGC GRAPHITE PRODUCTS JOINT VENTURE (CHINA) - 2016 • Project Name: Expanded and Fine flake graphite composite sealing material For personal use only • Project Investment: Total investment US$10M (49% contribution by Triton) • Project Construction Duration: 9 months • Project Location: Hube
Slide 6: Phase 2: Production Ancuabe Graphite Project - 2016
PHASE 2: PRODUCTION ANCUABE GRAPHITE PROJECT - 2016 • Strategic Alliance: Triton and AMG Mining (GK) (subject to advancing current relationship) For personal use only • Project: Ancuabe Graphite Mine (owned/operated by GK) and Triton surrounding area • Potential Project Investment: Total investment
Slide 7: Phase 3: Production Nicanda Hill Graphite Project - 2017
PHASE 3: PRODUCTION NICANDA HILL GRAPHITE PROJECT - 2017 • Project: Nicanda Hill Graphite Mine (P66) & (100) For personal use only • Project Investment: Total investment US$80M • Project Construction Duration: 16 months • Production Rate: Initial 80,000 to 100,000 tonnes (ability to scale up on dema
Slide 8: Phase 4: YXGC Graphite Products Joint Venture (Mozambique) - 2018
PHASE 4: YXGC GRAPHITE PRODUCTS JOINT VENTURE (MOZAMBIQUE) - 2018 • Project Name: Expanded and Fine flake graphite composite sealing material For personal use only • Project Investment: Total investment estimated US$15M (70% contribution by Triton) • Project Construction Duration: 12 months • Projec
Slide 9: Mozambique Graphite Projects
Mozambique Graphite Projects For personal use only Deep Water Port Mains Power Approx 60 kms to Pemba Telecommunications Approx 230 kms to Pemba International Airport Water Airport Main Sealed Highway www.tritonmineralsltd.com.au 9
Slide 10: TMG Strengths
TMG Strengths Largest volume of highest quality material available in the world For personal use only Best infrastructure in Mozambique/East Africa: bitumen road to Nicanda Hill mine gate Ancuabe project located only 60km form port Diversified operations – stability of production/supply Vertically i
Slide 11: TMG Triton Mozambique Graphite
TMG Triton Mozambique Graphite For personal use only Ancuabe T12 Premium large flake concentrate 180-2,000µ/80-5mesh, >99% Battery-grade flake Spherical graphite Expanded graphite products Nicanda Hill P66 Graphene oxide/graphene Fine-medium flake concentrate 25-180µ/500-80 mesh, 95-99% Nicanda Hill
Slide 12: TMG Products
TMG PRODUCTS For personal use only www.tritonmineralsltd.com.au 12
Slide 13: TMG Future Milestones
TMG Future Milestones For personal use only • Commence construction enhanced graphite factory - Q4 2015 YXGC JV (China) • Commission factory – Q3 2016 • Full production 10,000tpa - Q3 2016 • Drilling activities update – Q4 2015 Ancuabe T12 • Mineral Resource - Q4 2015 • EIA & DUAT update – Q1 2016 •
Slide 14: Contact Details
Brad Boyle Contact Details CEO & Managing Director Triton Minerals Ltd For personal use only (ACN: 126 042 215) Ground Floor Unit 1, 256 Stirling Highway Claremont, Western Australia 6010 Ground Tel: +61 8 6489 2555 Fax: +61 8 9388 1252 bboyle@tritonmineralsltd.com.au Spherical Graphite generated fr
Slide 15: Disclaimer
DISCLAIMER For personal use only Competent Person’s Statement The information in this presentation that relates to Exploration Results on Balama North project is extracted from the reports entitled ASX Release “Balama North Project Update” created 5 March 2014, ASX Release “Positive Metallurgical Re
Slide 16: Nicanda Hill Resource
Nicanda Hill Resource Nicanda Hill October 2014 Mineral Resource Estimate Table completed in accordance with the JORC Code (2012) For personal use only Tonnes Grade Contained Graphite Grade Contained V2O5 Classification (Mt) (TGC%) (Mt) (V2O5%) (Mt) Indicated 328 11.0 36.1 0.26 0.85 Inferred 1,129 1
Slide 17: Nicanda Hill Resource
Nicanda Hill Resource • Nicanda Hill deposit was defined within 6 months from the commencement of drilling along a foot print that is 6.2km long (5.2km²) and still open in all directions For personal use only • Outcropping hydrothermal (Mutola) zone averages nearly 12% TGC and Macico and Grande grap
Slide 18: Nicanda Hill – world's largest graphite deposit
For personal use only Nicanda Hill – world’s largest graphite deposit www.tritonmineralsltd.com.au 12
Triton Minerals — Investor Presentation (October 2015) on 6ix