  1. Slide 1: Corporate Presentation

    Corporate Presentation March 2016 ShaMaran – A Lundin Group Company

  2. Slide 2: Strategy

    Strategy  Focus on project execution to get to Atrush first oil • Four wells ready for production • Pipeline work started and facilities construction progressing • First oil targeted for mid-2016 • Significant challenges remain in Kurdistan environment which may impact schedule  Additional funding

  3. Slide 3: Atrush block in Iraqi Kurdistan

    Atrush block in Iraqi Kurdistan  Awarded in 2007 Atrush  ShaMaran acquired interest in 2010 Kurdistan  Discovered Atrush in 2011  Partners / working interests • Shamaran / 26.8% • Taqa (Operator) / 53.2% • Marathon / 20% • KRG / up to 25% right to back in • In March 2013 the KRG gave notice of i

  4. Slide 4: Atrush is a world class large oil discovery

    Atrush is a world class large oil discovery  Discovered in 2011  Jurassic fractured carbonate  Large 25x3 km structure • fault bounded - 3 way dip closed  1.5 - 2.8 billion barrels in place  FDP approved October 2013  7 wells drilled to date  FDP Update presented in November 2015  Further ph

  5. Slide 5: Reserves increase proves excellent potential

    Reserves increase proves excellent potential  Positive test results proved up a larger reserves area  Reserves to be developed by 5 wells (4 existing wells plus CK-7)  End 2015 Reserves and Resource increase • Gross 2P Reserves increased from 61.5 MMboe to 85.1 MMboe • Gross 2P + 2C Resources inc

  6. Slide 6: Atrush Phase 1 development ongoing

    Atrush Phase 1 development ongoing  FDP Phase 1 approved in October Atrush block boundary 2013  30,000 bopd Central Processing Phase 1 Facilities under construction Further Phases  4 wells ready for production Saikhan block • CK-5 and CK-8 completed in Q3 2015 • AT-2 and AT-4 to be completed in Q

  7. Slide 7: Well tests show excellent productivity

    Well tests show excellent productivity Medium oil column • ~420 m 25o-27oAPI oil column 9,059 bopd 27oAPI • Excellent productivity • Communication east-west 8,200 bopd • No formation water on test 26oAPI • Good vertical communication • Proven in Upper Jurassic and Lower 4,200 bopd Jurassic Mus forma

  8. Slide 8: Atrush Phase 1 production facilities

    Atrush Phase 1 production facilities  Modular concept with provisions to expand and replicate. Capable of handling liquid rates of 30,000 bopd, initially  Maximize gas utilization. Minimize sour gas flaring with provisions for future sulphur recovery, power generation, etc. ShaMaran – A Lundin Gro

  9. Slide 9: Project Status – Process area

    Project Status – Process area  Most equipment installed  Flare installed ShaMaran – A Lundin Group Company 9

  10. Slide 10: Project Status – Piping

    Project Status – Piping  All pipe racks have been installed  Pipe installation ongoing ShaMaran – A Lundin Group Company 10

  11. Slide 11: Project Status – Electrical and instrumentation

    Project Status – Electrical and instrumentation  Instrument cable pulling ongoing  Central control room ShaMaran – A Lundin Group Company 11

  12. Slide 12: Atrush export

    Atrush export Feeder pipeline Kurdistan Export Pipeline  Atrush crude to be exported via existing Kurdistan Export Pipeline to Fishkabur and on to Ceyhan in Turkey  Sufficient pipeline capacity available to accommodate Atrush production ShaMaran – A Lundin Group Company 12

  13. Slide 13: Positive Development of Kurdistan export

    Positive Development of Kurdistan export  KRG continues to export via Ceyhan • Established stable market for Kurdistan/Kirkuk blend FOB Ceyhan • KRG exports approx. 600,000 barrels per day according to monthly reports  Since September 2015 contractors have been regularly paid for export  Reduced

  14. Slide 14: Atrush feeder pipeline

    Atrush feeder pipeline  Pipeline EPC contract with KAR Group signed on November 1, 2015 to include: • Pumping station • 6 km 10” section from Production facilities to intermediate pigging station (IPPR) • 2 km 12” section from IPPR to Atrush Block boundary  Agreement with MNR • KRG to install 31km

  15. Slide 15: Project schedule

    Project schedule  Four wells drilled and tested. Two wells completed and ready for production  All main equipment items procured  Most equipment now installed  Piping installation ongoing  Electrical and instrumentation work ongoing  Feeder pipeline installation started  Two well completions

  16. Slide 16: Work ongoing to realise full field value

    Work ongoing to realise full field value  Submitted field development plan update in November 2015 • No commitment to further phases of development • Production data needed • Drill CK-7 to better define centre part of the field and provide additional producer • Potential further delineation drillin

  17. Slide 17: Additional funding

    Additional funding  Proposed Financing Arrangement to provide additional USD 33 million liquidity in 2016 • USD 17 mln new Super Senior Bond • Underwritten by the Lundin family • Same terms as Existing Bond (11.5% interest, maturity November 2018) • Option to pay future interest payments in cash or

  18. Slide 18: Corporate profile

    Corporate profile  Share capital  SNM share price on TSX.V • Issued and outstanding 1,579,768,534  Market capitalisation • CAD 166M (@ March 11, 2015)  Major shareholders • Lundin family trusts 19.1% • Lundin Petroleum 6.6% • Directors/Management 0.3%  Trading information • Toronto Stock Exchan

  19. Slide 19: The Lundin Group

    The Lundin Group Combined market cap $12 Billion ShaMaran – A Lundin Group Company 19

  20. Slide 20: Key points

    Key points  Robust Atrush development project progressing  World class increased resource base • Gross 2P 85.1 MMBoe • Gross 2C 304 MMboe  First oil target mid 2016 • Facilities construction ongoing • Pipeline installation started  Further funding proposed  Strong Lundin Group support ShaMaran

  21. Slide 21: Cautionary statements

    Cautionary statements This document contains statements about expected or anticipated future events and financial results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as legal and political risk, civil unrest, general economic, market and