Slide 1: ASX cover letter releasing AGM presentation
ENERGY WORLD CORPORATION LTD. 9A Seaforth Crescent Tel. (61 2) 9247 6888 Seaforth, NSW, 2092 Fax (61 2) 9247 6100 2 November 2009 The Listing Manager The Listing Manager Company Announcement Platform Market Information Services Section ASX Limited New Zealand Stock Exchange URL http //www_asxonline
Slide 2: Presentation to Shareholders, Annual General Meeting
For personal use only ENERGY WORLD CORPORATION Presentation to Shareholders Annual General Meeting 30 October 2009
Slide 3: Disclaimer
Disclaimer For personal use only • These materials have been prepared by Energy World Corporation Limited (the "Company") solely for information use during this presentation. These materials may not be copied, reproduced, passed on or redistributed, directly or indirectly, to any other person (wheth
Slide 4: 2009 Review
2009 Review For personal use only — July 2008 – June 2009 will be remembered for the financial crisis resulting in the near collapse of the global financial markets. — Governments forced to step in to support banks and major industries. — The decline of the Australian dollar against the US dollar by
Slide 5: 2009 Review (Con't)
2009 Review (Con’t) For personal use only — Despite this difficult year EWC has moved forward on all fronts of its business plan and maintained a policy of prudent project and financial management, to ensure a strong cash position until there is a clear indication of future demand and reasonable pri
Slide 6: Introduction - Asia's Appetite for Energy
Introduction - Asia’s Appetite for Energy For personal use only kWh 0 2000 4000 6000 8000 10000 12000 14000 16000 United States: 13351 Australia: 11193 New Zealand: 8937 Singapore: 8170 Japan: 8072 South Korea: 7391 Germany: 7029 Energy World Corporation has always United Kingdom: 6206 positioned it
Slide 7: Plan for Asia
Our LNG Plan for Asia For personal use only Targeted LNG Consumption CHINA JAPAN INDONESIA THE PHILIPPINES LNG to ASIA Our Proposed LNG Production PAPUA NEW GUINEA and AUSTRALIA OTHER ASIA 2 MTPA modular LNG currently under 2 MTPA modular LNG currently under development (expansion to 5 MTPA) develop
Slide 8: Our Target
Our Target For personal use only To become a leader in modular LNG development and a significant supplier of natural gas to Asian markets Pagbilao Hub Terminal 300MW Power Station Sri Lanka 600MW Power Station LNG Hub Sengkang 2-5MTPA LNG Terminal Manila Papua New Guinea 2-5MTPA LNG Terminal and Dee
Slide 9: Clean and Green Energy
Clean and Green Energy For personal use only • Increasing concern over “global warming” has led to pollution and emission caps, LNG is reduction goals and carbon trading considered to be • Natural gas is a cleaner and more efficient fossil fuel a source of - For an equivalent amount of heat, burning
Slide 10: Development of Modular LNG
Development of Modular LNG For personal use only EWC developed EWC approached Australia’s first EWC decided LNG liquefaction EWC ordered a FEED domestic LNG plant was the best way to equipment makers Study to design a over 18 years ago supply Asia’s growing asking for their standard modular ½ (Alice
Slide 11: Teaming Up with Industry Leaders on Modular LNG
Teaming Up with Industry Leaders on Modular LNG For personal use only EWC has brought together distinguished global players and strong partners such as Chart Industries and Chemicals and Siemens to develop an efficient, electric drive modular LNG system that can be used in a variety of locations. EN
Slide 12: Our Standard Modular LNG Landscape
Our Standard Modular LNG Landscape For personal use only
Slide 13: Benefits of All Electric LNG Trains
Development of Modular LNG For personal use only Benefits of All Electric LNG Trains Continuous full load operation possible for 5 to 6 years Up to 25 days additional production each year Lower greenhouse gas and noise emissions OPEX, MAINTEX reduction Compressor string independent in size, speed an
Slide 14: Development of Modular LNG
Development of Modular LNG For personal use only E-LNG allows for a simple, elegant Liquefaction setup with a relatively small footprint. Through innovative design, EWC has downsized typical LNG train sizes – we are moving from the grandfather clock to the pocket watch. By using a standard design, m
Slide 15: Development of Modular LNG
Development of Modular LNG For personal use only
Slide 16: Development of Modular LNG
Development of Modular LNG For personal use only
Slide 17: Development of Modular LNG
Development of Modular LNG For personal use only
Slide 18: Development of Modular LNG
Development of Modular LNG For personal use only Standard, shop-fabricated liquefaction plants will grow less expensive per ton of capacity, whereas mega-scale projects have leapt in cost from $500 per metric §Supplies of LNG are ton to more than $1,000 per ton. going to grow in the next few years,
Slide 19: LNG Marine Loading Arms
Development of Modular LNG For personal use only LNG Marine Loading Arms
Slide 20: Development of Modular LNG
Development of Modular LNG For personal use only EWC has secured a License from GTT – Gaztransport & Technigaz to §Energy agencies use its LNG tank technology for land based membrane tanks are forecasting significant increases in natural gas demand during the next 20 years. §The largest increments i
Slide 21: Development of Modular LNG
Development of Modular LNG For personal use only
Slide 22: Economic and HSE Benefits of E-LNG
Development of Modular LNG For personal use only Economic Benefits of E-LNG Operational & HSE Benefits of E-LNG Maximize productivity & asset utilization Adjustable throughput &load distribution Production capacity independent of Motors & compressors are inherently ambient temperature adjustable Thr
Slide 23: Advantages of Our Modular LNG Model
Advantages of Our Modular LNG Model For personal use only Conventional VS. Our Modular LNG Train Configuration Large-scale LNG facility of 4 MTPA or above Mid-scale LNG facility incorporated in 0.5 MTPA LNG trains Capital cost about US$100-125 million per 0.5 MTPA (excluding Capital cost currently i
Slide 24: Indonesia - Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Electric Motor Compressor Drive Gear South Sulawesi LNG: Box §Site acquired §Major equipment purchased §Shipments commenced
Slide 25: Indonesia - Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Compressor Electric Motor Drive Gear Box
Slide 26: Indonesia - Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Siemens – Factory Acceptance Test (FAT) for Sengkang LNG Direct Control System (DCS)
Slide 27: Indonesia - Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Sengkang 2-5MTPA LNG Terminal CPP LNG Loading Kampung Baru Terminal LNG Plant Site Bongo 01 Walanga 02 Power Plant SENGKANG Power Station For LNG Plants
Slide 28: Our Gas and LNG Projects
Our Gas and LNG Projects Indonesia – Sengkang Drilling Rig on site Well Workovers and Production Gas Well Drilling, August - October 2009 For personal use only
Slide 29: Our Gas and LNG Projects
Our Gas and LNG Projects Indonesia – Sengkang Drilling Rig on site Well Workovers and Production Gas Well Drilling, August - October 2009 For personal use only
Slide 30: Sengkang LNG Terminal Site - Access Road and Seafront Filling
Our LNG Projects Sengkang LNG Terminal Site – Construction of Access Road and Filling of the Seafront Site for the LNG Plant at Keera, South Sulawesi, August - October 2009 For personal use only Outlook to LNG Plant Site Road Construction Access Road Progress
Slide 31: Sengkang LNG Terminal Site - Access Road and Seafront Filling
Our LNG Projects Sengkang LNG Terminal Site – Construction of Access Road and Filling of the Seafront Site for the LNG Plant at Keera, South Sulawesi, August - October 2009 For personal use only Road and Embankment Around Fish Pond and Along the Coast Line
Slide 32: Sengkang LNG Terminal Site - LNG Storage Tank Location
Our LNG Projects Sengkang LNG Terminal Site – LNG Storage Tank Location at Keera, South Sulawesi For personal use only
Slide 33: Indonesia Meeting with Vice President Jusuf Kalla
Indonesia Meeting with His Excellency Vice President Dr. H. Mohammad Jusuf Kalla For personal use only
Slide 34: Indonesia Meeting with Minister of Energy and Mineral Resources
Indonesia Meeting with H.E. Purnomo Yusgiantoro – Minister of Energy and Mineral Resources, June 2009 For personal use only
Slide 35: Indonesia Meeting with the Governor of South Sulawesi
Indonesia Meeting with the Governor of South Sulawesi, His Excellency Dr. Syahrul Yasin Limpo For personal use only
Slide 36: Australia - ATP-549P Cuban Drilling Project
Our LNG Projects Australia – ATP-549P Cuban 1 Drilling Project For personal use only Cultural Heritage Team On Site Rig Site – Erection of Drill Mast 16th March 2009 Rig Site - Connection of Water Pump Rig Site - Halliburton Pump Truck & Bulk Cement Tanker of Cementing
Slide 37: Australia - Abbot Point LNG Project
Our LNG Projects Australia – Abbot Point LNG Project For personal use only Australia Unlocking Queensland Gas Assets Queensland • Port of Abbot Point Location • Existing deep-water coal export terminal Community • An opportunity for many smaller gas exploration companies in Opportunity Queensland to
Slide 38: Australia - Queensland Gas Highway
Our LNG Projects Australia – Queensland Gas Highway For personal use only
Slide 39: Our Projects - Pipelines - Diversified Construction Corporation
Our Projects – Pipelines – Diversified Construction Corporation For personal use only
Slide 40: Our Proposed LNG Plant and Power Station
Our Proposed LNG Plant and Power Station For personal use only Abbot Point Proposed LNG Plant & Power Station: Proposed §Initial capacity 2 MTPA LNG Jetty Water Depth 13 M+ §Future expansion to 5 MTPA §Gas supply from EWC owned and operated gas fields via the Qld Gas Highway Proposed LNG Plant Propo
Slide 41: Abbot Point: Developing The Northern Triangle
Our LNG Projects Australia – Abbot Point: “Developing The Northern Triangle” For personal use only Northern Economic Triangle Vision To foster sustainable economic, social and community development and growth through the emergence of Mount Isa, Townsville and Bowen as a triangle of mineral processin
Slide 42: Australia - Other Gas and Oil Interests
Australia – Other Gas and Oil Interests Southern Cooper Project (PEL 96) For personal use only PEL 96 (Block K) Percentage • 33.3% Interest of EWC Gas / Oil • Gas potential of 8 – 20 TCF Operating • Strike Oil Limited Party EWC portion 2.50 - 6.50 TCF Production • PEL obtained 13 May 2009 Status Fut
Slide 43: Papua New Guinea - Gulf Province LNG Project
Our LNG Projects Papua New Guinea – Gulf Province LNG Project – Signing Agreement In Conjunction with Energy World International Limited (EWI) For personal use only Gulf Province Developments: • Natural gas supply pipeline • 2 - 5 MTPA LNG production facility • LNG Terminal will be developed in conj
Slide 44: Papua New Guinea - Development Projects in Gulf Province
Our LNG Projects Papua New Guinea – Development Projects in Gulf Province For personal use only EWC - Proposal LNG Terminal EWI - Deep Water Port EWI - Petroleum Refinery EWI - Power Station
Slide 45: Papua New Guinea - Western Province LNG Project
Our LNG Projects Papua New Guinea – Western Province LNG Project Energy World International Limited (EWI) For personal use only Parama Island LNG: • Initial capacity 2 MTPA • Future expansion to 5 MTPA • LNG Terminal will be developed in conjunction with a deep water port and power station.
Slide 46: The Philippines - LNG Hub Terminal and Power Station
Our LNG Projects The Philippines – LNG Hub Terminal and Power Station For personal use only
Slide 47: The Philippines - LNG Hub Terminal and Power Station
Our LNG Projects The Philippines – LNG Hub Terminal and Power Station For personal use only The Philippines Pagbilao Grande Island, Quezon Province Philippines LNG Terminal Sengkang LNG Project 1,100 nautical Strategic Location miles Regional Play • Located between key developing markets in coastal
Slide 48: The Philippines - LNG Hub Terminal and Power Station
Our LNG Projects The Philippines - LNG Hub Terminal and Power Station For personal use only Philippines Hub LNG Terminal The ground breaking ceremony for the LNG Hub Terminal and 300MW gas fired power plant was held on the site of Pagbilao Grande Island in Quezon Province on 28 August 2009. The cere
Slide 49: Quezon Province Developments
QUEZON PROVINCE DEVELOPMENTS For personal use only HON. HON. RAFFY P. P. NANTES GOVERNOR QUEZON PROVINCE DELIVERING CLEAN HOTEL AND RESORT ENERGY FOR QUEZON LNG CARRIER VESSEL 300MW 300MW GAS FIRED FERRY PASSENGER POWER STATION TERMINAL ENERGY WORLD GROUP
Slide 50: Ground Breaking Ceremony 28 August 2009
Our LNG Projects The Philippines - LNG Hub Terminal and Power Station Ground Breaking Ceremony 28 August 2009 For personal use only
Slide 51: The Philippines - LNG Hub Terminal Site Preparation
Our LNG Projects The Philippines - LNG Hub Terminal Site Preparation For personal use only
Slide 52: The Philippines - LNG Hub Terminal and Power Station
Our LNG Projects The Philippines - LNG Hub Terminal and Power Station For personal use only Pictured Left to Right. Former Governor of Quezon Province Eduardo Rodriguez, current Governer of Quezon Province Rafael Nantes, the Secretary for Energy, The Hon. Angelo Reyes, the undersecretary for Energy
Slide 53: Sri Lanka - Hambantota LNG Hub
Our LNG Projects Sri Lanka – Hambantota LNG Hub For personal use only Hambantota LNG Hub: • This terminal will act as a hub for onward distribution of LNG throughout Sri Lanka • EWC will develop a CCGT power station at this site • Substantial development of this port is already underway
Slide 54: Development of Floating Modular LNG
Development of Floating Modular LNG For personal use only LNG Storage Ship
Slide 55: Ship Solution for Floating LNG
3 Ship Solution for Floating LNG For personal use only Based on the standard EWC LNG ship – EWC developed 3 ship solution for Floating LNG. LNG Support Ship - Gas pretreatment and power generation is located on the first ship. LNG Liquefaction Ship - Liquefaction (2 x 500,000 TPA) trains the standar
Slide 56: Development of Floating Modular LNG
Development of Floating Modular LNG For personal use only LNG Liquefaction Ship 2 x 500,000 TPA
Slide 57: Benefits of the Ship Floating Modular LNG
Benefits of the 3 Ship Floating Modular LNG For personal use only ü This is a buildable solution based around well developed technology ü Smaller ships with shallower draft allow for greater flexibility in location ü In the event of bad weather, all 3 ships can be moved to a safe harbour ü Insurance
Slide 58: Key Attributes of Our Company
Key Attributes of Our Company For personal use only Ownership of Strategic Gas and Power Resources in Strategic Locations 1 Market Leading Position to Exploit Stranded Gas Fields Using Modular LNG Train 2 Configuration 3 Committed LNG Project to be Commissioned from 2010 4 Stable Revenue Stream from
Slide 59: LNG to the Asian Market
LNG to the Asian Market For personal use only
Slide 60: Thank You!
For personal use only Thank You! 20 Oct 2009