  1. Slide 1: TMCBSU, Montana Schlumberger Private Field Study – Phase 2

    TMCBSU, Montana Schlumberger Private Field Study – Phase 2 Provident Energy Associates of Montana, LLC Production & Completions Group Consulting Services, DCS NGC June 2009

  2. Slide 2: Agenda

    Agenda „ Phase 1 Review – Workflow & Results • TMCBSU Inventory (OFMTM) Schlumberger Private • Total Field Production & Injection „ Phase 2 – Objectives & Deliverables – Cut Bank Formation – Production Analysis (by Yanil Del Castillo) – Operations Review (by Eddie Rodriguez) ¾ Conclusions & Recommen

  3. Slide 3: Phase 1 – Data Acquisition

    Phase 1 – Data Acquisition DNRC IHS Well Files Source (Department of Natural Resources (Public Database) (Arkanova Energy) and Conservation, Montana) Schlumberger Private Format Electronic Electronic & Hard Copies PRD: 1978 - 2008 PRD: 1960-1978 Data INJ: 1996 – 2008 INJ: 1968-1986 (68,283 records)

  4. Slide 4: Phase 1 – Building a Database (OFM)

    Phase 1 – Building a Database (OFMTM) 1290000 1296000 1302000 1308000 1314000 1320000 Locations included 570000 570000 Dry Hole EOR P&A Water Inj in the TMCBSU: Expired Location Expired Permit Oil Producer 31N 6W 32N 6W 21-1521-14 22-14 P&A Water Inj 1–5 21 – 22 P&A WaterSource 28-0128-0228-03X PA O

  5. Slide 5: Phase 1 – OFM Inventory

    Phase 1 - OFM Inventory 21-15 Active Oilwell CUT BANK / LOWER CUT BANK Formation 28-01 28-07 28-03X 28-03 28-05 27-07 27-03 27-05 Dry Hole PA Oilwell SI OilWell 28-09 28-11 27-09 TA OilWell 27-11 26-09 26-11 12 Active Producers 28-15 28-13 27-15X 27-13 26-15 33-01 33-03 34-01X 34-01 34-03 76 SI or T

  6. Slide 6: Phase 1 – Total Field Production & Injection

    Phase 1 – Total Field Production & Injection Cut Bank / Lower Cut Bank 6 10 Oil Production ( bbl ) Water Production ( bbl ) Gas Production ( Mcf ) Cut Bank / Lower Cut Bank Formation: Water Injection ( bbl ) LEASE (IHS) Lease_Monthly_Oil Production (per well) + Lease Prd Lease_Monthly_Water Oil Cum:

  7. Slide 7: Phase 2 – Objectives & Deliverables

    Phase 2 - Objectives & Deliverables I) Two-day Field Visit ¾ QA/QC current Dataset - Done II) Data Inventory Review ¾ Validate OFMTM/Access Database - Done - Identify available data, such as well files, logs, maps, PVT and Schlumberger Private core data, waterflood reports „ Preliminary Review of TM

  8. Slide 8: Cut Bank Formation

    Cut Bank Formation *Reference: BLM Report 1996 & Blackfeet Nation Article „ Southwest extension of the larger Cut Bank field „ Monocline, west side of Sweetgrass Hills Arch „ Lower Cretaceous Cut Bank Sandstone Schlumberger Private – Upper Sand 0-38ft (not productive) – Lower Sand 0-47ft (oil bearin

  9. Slide 9: Cut Bank Formation

    Cut Bank Formation Schlumberger Private Two Medicine Cut Bank Sand Unit (TMCBSU)

  10. Slide 10: Cut Bank Formation North/South Cross-Section

    Cut Bank Formation North/South Cross-Section 21-15 21-14 22-14 28-01 28-0228-03X 28-03 28-04 27-01 27-02 27-03 A Cross-section (A to A’) 28-08 28-07 28-06 28-0527-08 27-07 27-06 27-05 28-10 28-11 28-12 27-09 28-09 28-10X 27-10 27-11 27-12 26-09 26-10 26-11 27-03 34-11 Schlumberger Private 28-16 28-1

  11. Slide 11: North/South Cross-Section

    North/South Cross-Section 11-05 (Shut In): Ground Level: 3,643 ft Ref. Depth: 3,643 ft – 450 ft: 3,193 ft (updip to the south) Top of formation: 3,104 ft Perfs (upper): 03-13 (Shut in) Ground Level: 3,535 ft 3,066 – 3,076 ft Ref. Depth: 3,535 ft – 450ft: 3,085 ft Top of Formation: 3,012 ft 34-11 (Ac

  12. Slide 12: Cut Bank Formation West/East Cross-Section

    Cut Bank Formation West/East Cross-Section 21-15 21-14 22-14 28-01 28-0228-03X 28-03 28-04 27-01 27-02 27-03 Cross-section (B to B’) 28-08 28-07 28-06 28-0527-08 27-07 27-06 27-05 28-10 28-11 28-12 27-09 28-09 28-10X 27-10 27-11 27-12 26-09 26-10 26-11 08-05 28-16 28-15 28-14 28-13 27-16 27-15X Schl

  13. Slide 13: Cut Bank Formation

    Cut Bank Formation Perfs (upper): (updip to the east) 3,100 – 3,138 ft 10-01 Ground Level: 3,739 ft Ref. Depth: 3,739 ft – 300 ft: 3,439 ft 01-09 Top of Formation: 3,290 ft Ground Level: 3,740 ft Ref. Depth: 3,740 ft – 300 ft: 3,440 ft Schlumberger Private 09-03 Top of formation: 3,154 ft Ground Lev

  14. Slide 14: Agenda

    Agenda „ Phase 1 Review – Workflow & Results • TMCBSU Inventory (OFMTM) Schlumberger Private • Field Production & Injection „ Phase 2 – Objectives & Deliverables – Cut Bank Formation – Production Analysis (by Yanil Del Castillo) – Operations Review (by Eddie Rodriguez) ¾ Conclusions & Recommendation

  15. Slide 15: TMCBSU Phase 2: Production Field Review

    TMCBSU Phase 2: Production Field Review Schlumberger Private Provident Associates of Montana Production & Completion, DCS NGC 9 June 2009

  16. Slide 16: Overview

    Overview „ Phase 2 – Objective : Identify Best Candidates for Reactivation Schlumberger Private – Field / Waterflood Review – Candidate Recognition (Key Production Indicators) – Best 12 months of Production – Last 6 Month Average (Oil, Water) – Total Liquid Production per perforated interval – Histo

  17. Slide 17: Field / Waterflood Review

    Oil Cum: 7748 MBO Winj Cum 51143 MB Well: Well Type: <Ambiguous> Gas Cum: 2 MMCFG Location: <Ambiguous> <Ambiguous> W 6.0 Upper_Perfs_(Top): 3400' Water Cum: 22595 MBW Field / 10 6 Operator: <Ambiguous> Lower_Perfs_(Base): 3440' 10 WaterFlood 10 5 5 Review 10 4 3 10 1 Axis 1 2 Oil Production ( bbl )

  18. Slide 18: Cumulative Oil Production Map

    Date:12/1/2008 1290000 1296000 1302000 1308000 1314000 1320000 OilCum 570000 Cumulative Oil Production ( Mbbl ) 570000 0.00 139.28 278.57 WinjCum 21-15 A 21-14 22-14 Reactive 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 564000 564000 Area 28-08 28-07 28-06 28-05 27-08 27-07 C 27-06 27-05 28-09 2

  19. Slide 19: Cumulative Production Map

    Date:12/1/2008 1290000 1296000 1302000 1308000 1314000 1320000 OilCum 570000 Cumulative Oil Production ( Mbbl ) Cumulative Water Production ( Mbbl ) 570000 WaterCum 21-15 21-14 A Cumulative Gas Production ( MMcf ) 22-14 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 564000 564000 28-08 28-07 28-06

  20. Slide 20: Cumulative Water Injection Map

    Date:12/1/2008 1290000 1296000 1302000 1308000 1314000 1320000 WinjCum 570000 Cum Water Injection ( Mbbl ) 570000 21-15 A 21-14 22-14 High WinjCum Low WinjCum 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 Low WaterCum 209 103 113 Low WaterCum 564000 564000 28-08 28-07 28-06 28-05 27-08 C High Oil

  21. Slide 21: Cumulative Water Injection Map

    1290000 1300000 1310000 1320000 133000 #10-11 10-9 11-12W#11-11 30-02 31-03 C708X 577500 #28-01 29-02 31-02 WInjCum Cum Water Injection ( Mbbl ) #10-13#10-14#10-15#10-16 11-13 15-3 15-1 14-3 #35-02#35-01 #34-02 43-05 37-05 #33-04 100-W 33-W10 232-02 3#32-0432-0532-01 39-0140-02 40-01 G607 G707 LEASE

  22. Slide 22: Best 12 Months

    Best12Mo 1290000 1296000 1302000 1308000 1314000 1320000 Best 12 Months 570000 PeakOilAvg >= 0, < 625 570000 Avg. Oil Rate 21-15 21-14 >= 625, <1250 >=1250, <1875 >=1875, <2500 22-14 >=2500, <3124 vs. OilCum 564000 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 >=3124, <3749 >=3749, <4374 >=4374,

  23. Slide 23: Cumulative Oil Production Map

    Date:12/1/2008 1290000 1296000 1302000 1308000 1314000 1320000 OilCum 570000 Cumulative Oil Production ( Mbbl ) 570000 21-15 21-14 22-14 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 564000 564000 28-08 28-07 28-06 28-05 27-08 27-07 27-06 27-05 28-09 28-10 28-10X 28-11 27-09 28-12 27-10 27-11 27-

  24. Slide 24: Best Months vs. First yrs OilCum

    Best 12 Months vs. First 5 yrs OilCum Schlumberger Private Correlation exists: Best 12 Months vs. OilCum (First 5 yrs & Final)

  25. Slide 25: Last 6 Month Average Oil & Water

    Last6MoAvg 1290000 1296000 1302000 1308000 1314000 1320000 Last 6 Month 570000 MvAveWater MvAveOil 570000 0.00 1225.00 2450.00 Avg. 21-15 21-14 Oil & Water 22-14 28-01 28-02 28-03X 28-04 28-03 27-01 27-02 27-03 564000 564000 28-08 28-07 28-06 28-05 27-08 27-07 27-06 27-05 28-09 28-10 28-10X 28-11 27

  26. Slide 26: Last Month Avg. Oil & Water - Cross-Plot

    Last 6 Month Avg. Oil & Water - Cross-Plot 6000 data 1 data 2 10-13 x mean 5000 02-09X x std MvAvg. Water Rate (bbl/month) y mean y std Schlumberger Private 4000 3000 35-11X 2000 04-07 34-05 09-05 1000 Mean Oil Rate: 64 26-09 bbl/month Mean Water 0 Rate: 615 bbl/month 0 100 200 300 400 500 600 700 8

  27. Slide 27: Total Fluid / Only Active Wells (Top 20)

    1290000 1296000 1302000 1308000 1314000 1320000 Last 6 month 570000 570000 MvAvg_Water6 Total Fluid / Only active well (top 20) 21-15 2.83 2731.67 5460.50 Perforated 564000 28-01 28-03X 28-03 27-03 564000 28-07 28-05 Active, Low Wcut Interval 27-07 27-05 28-09 28-11 27-09 27-11 26-09 26-11 28-15 28-

  28. Slide 28: Criteria to Rank Candidates

    Criteria to Rank Candidates Initial Candidate Selection (Match 3 Criteria) • Best 12 months production indicator. • High Last 6 month Avg. Oil Rate ( above mean oil rate) . Schlumberger Private • High Last 6 month Total Fluid per perforated interval. Wells with last 6 month Water Cut > 90 % were exc

  29. Slide 29: Initial Candidate Selection

    Initial Candidate Selection Schlumberger Private Last 6 Month Avg. Best 12 Months Liq./ft Perf

  30. Slide 30: Final Candidate Selection

    Final Candidate Selection Schlumberger Private 11-11 & 11-17 are producing based on Arkanova_TMCBSU_Map2

  31. Slide 31: Well 11-05 Production History

    W e ll U W I : 1 2 5 0 0 1 1 1 4 5 0 1 W e l l A l ia s : 1 1 - 0 5 1000 O i l R a te ( C a l . D a y) ( b b l /d ) 1 1 - 0 5 500 O i l .C a l d a yA vg R e g ( b b l /d /w ) :T M C B S U : T M C B S U 100 50 10 5 Schlumberger Private 1 1 9 6 86 9 7 0 7 1 7 2 7 3 7 4 7 5 7 6 7 7 7 8 7 9 8 0 8 1 8 2

  32. Slide 32: Well 11-11 Production History

    W e ll U W I : 1 2 5 0 0 1 1 1 4 5 0 3 W e ll A lia s : 1 1 - 1 1 1000 O i l R a te ( C a l . D a y) ( b b l /d ) 1 1 - 1 1 500 O i l .C a l d a yAvg R e g ( b b l /d /w ) :T M C B S U : T M C B S U 100 50 10 5 Schlumberger Private 1 1 9 6 86 9 7 0 7 1 7 2 7 3 7 4 7 5 7 6 7 7 7 8 7 9 8 0 8 1 8 2 8 3

  33. Slide 33: Candidate Wells Map

    1290000 1296000 1302000 1308000 1314000 1320000 570000 570000 MAvg_W ater 0.00 1225.00 2450.00 21-15 21-14 22-14 PRIMARY 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 OTHERS 564000 28-08 28-07 28-06 28-05 27-08 SECONDARY 564000 27-07 27-06 27-05 28-10 28-09 28-10X 28-11 28-12 27-09 27-10 03-15 Hi

  34. Slide 34: Conclusions & Recommendations

    Conclusions & Recommendations „ Candidate selection based on Best 12 months, Last 6 months average oil/water and total fluid per perforated interval was representative of well performance. Historical well production was compared to field averages (oil / water) to verify candidate selection. Schlumbe

  35. Slide 35: Conclusions

    Conclusions „ South Part of the field (D & B ) seem to be less productive (possibly associated with low reservoir quality). „ North part of the field (C) cumulated high oil production (low Schlumberger Private cumulative water) without receiving comparable volumes of water injection. This area seem

  36. Slide 36: Recommendations

    Recommendations „ Review workover program during 91-93 (Mont-Mill operating co.) which increased field oil production. „ Detail waterflood evaluation to identify areas were the flood Schlumberger Private channeling is more severe (identify unswept areas). „ Identify opportunities for recompletion: R

  37. Slide 37: TMCBSU Operations Review

    TMCBSU Operations Review Schlumberger

  38. Slide 38: Agenda

    Agenda • Objective • Key Findings • Conclusions • Recommendations

  39. Slide 39: Objective of Operations Review

    Objective: To present key findings regarding the operations review and field visit of the Provident operated TMCBSU.

  40. Slide 40: TMCBSU Unit Field Curve

    Oil Cum: 8551 MBO Operator: <Ambiguous> Upper_Perfs_(Top): 34 Gas Cum: Water Cum: 5 2 MMCFG 37075 MBW TMCBSU Unit Field Curve Location: <Ambiguous> <Ambiguous> W 6.0 Well: <Ambiguous> Lower_Perfs_(Base): Well Type: <Ambiguous> BHP_Q1_2009 36065PSI 34 10 All wells(238) Oil Rate (Cal. Day) ( bbl/d ) W

  41. Slide 41: Active Wells

    Active Wells 21-15 21-14 22-14 Pumping Wells 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 28-08 28-07 28-06 28-0527-08 28-05 27-07 27-06 27-05 Pending Reinstatement 28-10 28-11 28-12 28-09 28-10X 27-09 27-10 27-11 27-09 27-12 26-09 26-10 26-11 28-15 28-14 28-13 27-16 27-15X 28-16 28-15 27-14 27-

  42. Slide 42: Fluid Levels/Extrapolated BHP

    Fluid Levels/Extrapolated BHP 1290000 1296000 1302000 1308000 1314000 1320000 565000 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 Active Oilwell 565000 Dry Hole 28-08 28-07 28-06 28-0527-08 1 psi 27-05 27-07 27-06 EOR P&A Water Inj Expired Location 28-10 28-11 28-12 28-09 28-10X 27-09 27-10 27-1

  43. Slide 43: Beam Pump Inventory

    1290000 1296000 Beam Pump Inventory1302000 1308000 1314000 1320000 565000 565000 27-03 57 Pumping Wells 28-05 27-05 @ pumped off conditions n/a Pending Reinstatement 27-09 160 26-09 21 each – 160 6 each-114 160 @ 170 BFPD 114 @ 142 BFPD 160 28-15 160 2 each -57 57 @ 51 BFPD 27-13 26-15 560000 160 1

  44. Slide 44: Existing Active Wells

    1295000 1300000 Existing 1305000 Active1310000 Wells 1315000 1320000 568000 568000 - Partial Communication LastOil6MoMvAve ( bbl ) - All wells have low fluid production Last_Wtr_6MoMVAvg ( bbl/d ) LastBF_6mo_Mov_AVG ( bbl/d ) 1 42 - Poor MTBF Active_Empty_?? Last_WC_6MoMvAvg ( fraction ) 0.03 0.46 2

  45. Slide 45: Missing Critical Well Information

    Missing Critical Well Information Wellfiles do not adequately reflect well history, such as: • Lost in hole equipment • Equipment presently in the hole • Previous fluid levels / scale problems • Remedial work performed after the initial completion • Well deviations (dog leg severity) – evident by ho

  46. Slide 46: Caution! Incremental Oil via Optimized Pumping

    Incremental Oil via Optimized Pumping • Preliminary Estimates (below) indicate 79 BOPD incremental Oil • Troubling: Too many assumptions had to be made • Urgent need to validate well tests on active wells. • Test casing integrity above top perfs on future pullings/workovers • Reconfirm fluid levels

  47. Slide 47: Portable Well Test Equipment

    Portable Well Test Equipment How to Improve Well Tests

  48. Slide 48: Test Pumping Unit

    Test Pumping Unit How to Test Reactivation Candidates

  49. Slide 49: Why did the Waterflood Fail?

    Why did the Waterflood Fail? ay Provident Schlumberger

  50. Slide 50: Premature Water Channeling

    Oil Cum: 502 MBO Operator: <Ambiguous> Upper_Perf s_(Top): 3434' Water Cum: Water_Inj_Cum: 6 10 1299 MBW Premature Water Channeling 55702 MBWI Location: <Ambiguous> <Ambiguous> W 6.0 Well: Well Ty pe: P&A_INJ Lower_Perf s_(Base): 3450' Well_Status_Data: P&A_INJ Water Injection Rate (Cal.Day ) ( bbl/

  51. Slide 51: Horizontal Wells found in Glacier County, Mt.

    Horizontal Wells found in Glacier County, Mt. (none found in Pondera County)

  52. Slide 52: Cutbank Horizontal Wells

    Cutbank Horizontal Wells Well Name Section Location (T-R) TCBSU 11-7 11 32N-6W TCBSU 11-5 11 32N-6W CBAU 1-22H 22 33N-6W CBAU 2-22H 22 33N-6W CBAU 1-14H 14 33N-6W ARMSTRONG 3-14H 14 33N-6W ARMSTRONG 2-14H 14 33N-6W Klemens C405 5 32N-5W CBAU 1-23-14H 23 33N-6W Quicksilver Resources, Inc. CBAU 1-14H

  53. Slide 53: Production Rates

    QUICKSILVER RESOURCES INCORPORATED CBAU ARMSTRONG (2-14H) CBAU ARMSTRONG - CUT BANK 10,000 1,000 43 BOPD Water Production (bbl) 20 BWPD Oil Production (bbl) Gas Production (mcf) Production Rates Oil Production (bbl) 100 Gas Production (mcf) Water Production (bbl) 10 1 1993 1995 1997 1999 2001 2003 2

  54. Slide 54: Production Rates

    QUICKSILVER RESOURCES INCORPORATED C B A U - CUT BANK 10,000 C B A U (1-14H) 1,000 36 BOPD Oil Production (bbl) Production Rates Oil Production (bbl) Gas Production (mcf) Water Production (bbl) Water Production (bbl) 5 BWPD 100 10 1992 1993 1994 Time

  55. Slide 55: Production Rates

    K2 AMERICA CORPORATION DAMSON CB SU - CUT BANK DAMSON CB SU (11-5) 10,000 164 BWPD 1,000 Bbls/mo 17 BOPD Production Rates Oil Production (bbl) 100 Gas Production (mcf) Oil Production (bbl) Water Production (bbl) Water Production (bbl) 10 Gas Production (mcf) 1 1974 1977 1980 1983 1986 1989 1992 1995

  56. Slide 56: Production Rates

    K2 AMERICA CORPORATION DAMSON CB SU - CUT BANK 10,000 DAMSON CB SU (11-7) 1,000 30 BWPD 16 BOPD Production Rates Oil Production (bbl) Oil Production (bbl) 100 Water Production (bbl) Gas Production (mcf) Water Production (bbl) 10 Gas Production (mcf) 1 1974 1978 1982 1986 1990 1994 1998 2002 2006 201

  57. Slide 57: Conclusions

    Conclusions • TMCBSU reservoir pressure is close to original BHP. • There is incremental production to be gained from existing active wells. • Some active wells do not appear to be properly communicated with the reservoir. • There is missing critical well and field information • Portable Pumping Uni

  58. Slide 58: Recommendations

    Recommendations Short term production/reserves • Focus on existing production of active wells / reactivations Long term reserves • Need to source missing data and to evaluate Engineering, Geological and Operational information to opt for either: – Horizontal Well Drilling – Waterflood reinstallation

  59. Slide 59: Support Slides

    Support Slides ay Provident. Schlumberger

  60. Slide 60: Isopach Map

    Isopach Map 21-15 21-14 22-14 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 28-08 28-07 28-06 28-05 27-08 27-07 27-06 27-05 28-09 28-10 28-10X 28-11 27-09 28-12 27-10 27-11 26-09 27-12 26-10 26-11 28-16 28-15 27-16 28-14 28-13 27-15X 27-14 27-13 26-16 26-15 26-14 27-29 32-04 33-01 33-02 33-03 33-

  61. Slide 61: Structure Map

    21-15 21-14 22-14 Structure Map 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 28-08 28-07 28-06 28-05 27-08 27-07 27-06 27-05 28-09 28-10 28-10X 28-11 27-09 28-12 27-10 27-11 27-12 26-09 26-10 26-11 28-16 28-15 27-16 28-14 28-13 27-15X 27-13 27-14 26-16 26-15 26-14 27-29 32-04 33-01 33-02 33-03 3

  62. Slide 62: Oil Bubble Map

    21-15 21-14 Date:12/1/2008 22-14 28-01 28-02 28-03X 28-03 28-04 27-01 27-02 27-03 Oil Bubble Map 28-08 28-07 28-06 28-05 27-08 27-07 27-06 27-05 28-09 28-10 28-10X 28-11 27-09 28-12 27-10 27-11 27-12 26-09 26-10 26-11 28-16 28-15 27-16 28-14 28-13 27-15X 27-14 27-13 26-16 26-15 26-14 27-29 32-04 33-

  63. Slide 63: Proposed Next Steps

    Proposed Next Steps ¾ Begin Lifting Optimization & Testing Operations • Operations & Lifting experts can be sourced from Schlumberger ¾ Secure Missing Information - Complete Well Files Schlumberger Private • Schlumberger involvement key (Identify, Compile and Catalog data) ¾ Consider Geological Mode