Aurum Resources Limited · ASX:AUE
Aurum Resources — First International Symposium on Near Mine Minerals Exploration 2024
37 slides from Aurum Resources's conference presentation, Nov 18, 2024
Slide 1: Same Team on New Journey Exploring Gold in Côte D'Ivoire
HKIMA ASX澳交所股票代码:AUE 香港国际矿业协会 www.aurumres.com.au 金瑞资源有限公司 For personal use only Same Team on New Jourey Exploring Gold in Côte D’Ivoire 同一队伍在科特迪瓦勘探黄金的新历程 First International Symposium on Near Mine Minerals Exploration 首届就矿找矿国际研讨会 16 – 17 November 2024, Chengdu, China 中国成都、2024年11月16-17日
Slide 2: Rapidly Exploring the Boundiali Gold Project in Côte d'Ivoire
Rapidly Exploring 在科特迪瓦 the Boundiali Gold Project 快速勘探 ASX:AUE in Côte d’Ivoire 本加利金矿项目 www.aurumres.com.au For personal use only Our people our key asset 我们的团队是我们的核心资产
Slide 3: Disclaimer
Disclaimer This presentation prepared by Aurum Resources Ltd (“Company”) does not purport to contain all the not place undue reliance on these intentions, expectations, future plans, strategy and prospects. The information that a prospective investor may require in connection with any potential inve
Slide 4: Same Executive Management Team
Same Executive Management Team 同一支执行管理队伍 DR CAIGEN WANG At present 现在 For personal use only 王彩根博士 Aurum Resources Limited 金瑞资源有限公司 Managing Director 执行董事总经理 (Non-Executive Chairman Mr. Troy Flannery) Consolidated Boundiali Gold Project through Plusor Global Pty Ltd in late 2023 within 4 months and R
Slide 5: Same Executive Management Team (continued 1)
Same Executive Management Team (continued 1) 同一支执行管理队伍 (续 1) In the past 过去 Tietto Minerals Limited For personal use only 铁拓矿业有限公司 • Three exploration tenements comprising Abujar gold project for 1,114km2 三个探矿组成阿布贾金 矿项目,1,114平方公里 • Existence of large artisanal mining pits 具有大规模 的民采采坑 • Gold minerali
Slide 6: Same Executive Management Team (continued 2)
Same Executive Management Team (continued 2) 同一支执行管理队伍 (续 2) (Ref: AUE on ASX 29/7/2024) In the past 过去 Tietto Minerals Limited 铁拓矿业有限公司 • Discovered gold resources from 0 to 3.83Moz从零开始发 For personal use only 现了383万盎司的黄金资源量 • Raised capital A$373M 累计融资3.73亿澳元 • Built 4.5Mtpa Abujar Gold Mine with n
Slide 7: Acquisition of good exploration projects – Hard start half success
Acquisition of good exploration projects – Hard start half success 良好的勘探项目的获取 – 艰难的开端,成功的一半 Tietto Minerals Limited (ASX: TIE) (Ref: AUE on ASX 29/7/2024) Tietto’s first gold project in Côte D’Ivoire – Marandalah Project Tietto’s 2nd project in Côte D’Ivoire – Abujar Gold Project 阿布贾金矿项目是铁拓公司在科 铁拓公司
Slide 8: Time is money – Building a large scale gold mine within months
Time is money – Building a large scale gold mine within 11 months 时间就是金钱 – 在11个月建成了一座大型金矿(450万吨/年) Tietto Minerals Limited (ASX: TIE) (Ref: AUE on ASX 29/7/2024) For personal use only
Slide 9: Time is money – Building a large scale gold mine within months (continued)
Time is money – Building a large scale gold mine within 11 months (continued) Tietto Minerals Limited (ASX: TIE) 时间就是金钱 – 在11个月建成了一座大型金矿(450万吨/年) (续) (Ref: AUE on ASX 29/7/2024) February 2022 – 2022年2月 December 2022 – 2022年12月 For personal use only 14 January 2023 – 2023年1月14日 February 2022 – 2022年2
Slide 10: Highlights of Aurum Resources Limited
Highlights of Aurum Resources Limted 金瑞资源公司关注热点 • Focused on Boundiali Gold Project 聚焦科特迪瓦本加利金矿项目(工作重点) • In the process of taking over Mako Gold Limited For personal use only 正在收购Mako黄金有限公司的过程之中 Australian gold Changed the rules of Diamond drilling on high Board and Management Exploration upside ex
Slide 11: Boundiali Gold Project
Boundiali Gold Project 本加利金矿项目 PROSPECTIVE LAND PACKAGE有前景的地块组合 For personal use only Hosting prospective Birimian greenstones. Located within the same greenstone belt as the • Resolute’s large Syama (11.5Moz) and Perseus’ Sissingué (1.0 Moz) gold mines to the north, • Barrick’s Tongon mine (5.0Moz)
Slide 12: Boundiali Gold Project – Target Artisanal Working
Boundiali Gold Project – Target 1 Artisanal Working 本加利金矿项目一号霸区内非法民采坑 For personal use only AURUM RESOURCES 12
Slide 13: BD Gold JV Project - 13km by 3km Gold Corridor
BD Gold JV Project - 13km by 3km Gold Corridor 本加利金矿项目中BD合作矿权 – 13km x 3km 成矿走廊 33,700m DIAMOND CORE DRILLED SINCE – DECEMBER 20231 从2023年12月至今已经打了33,700米岩芯钻探工程 NYANGBOUE GOLD STRUCTURE金矿结构特征 For personal use only • Multiple corridors of +20ppb gold in soil anomalism1,2 • Higher gold values include
Slide 14: BD Target 1 X-Sections
BD Gold JV Project - 13km by 3km Gold Corridor 本加利金矿项目中BD合作矿权 – 13km x 3km 成矿走廊 BD TARGET 1 X-SECTIONS 1号霸区剖面图 For personal use only Section 1054330N (+/-40m) Section 1054250N (+/-30m) AURUM RESOURCES 14
Slide 15: BD Target 1 X-Sections
BD Gold JV Project - 13km by 3km Gold Corridor 本加利金矿项目中BD合作矿权 – 13km x 3km 成矿走廊 BD TARGET 1 X-SECTIONS 1号霸区剖面图 For personal use only AURUM RESOURCES 15 Section 1054500N (+/-25m) Section 1054400N (+/-25m)
Slide 16: First Stage Diamond Drill Scout Program – BD Target 2
BD Gold JV Project - 13km by 3km Gold Corridor 本加利金矿项目中BD合作矿权 – 13km x 3km 成矿走廊 FIRST STAGE DIAMOND DRILL SCOUT PROGRAM – BD TARGET 2 在BD矿证区2号霸区首轮岩芯钻探结果 For personal use only AURUM RESOURCES 16
Slide 17: BST Gold Project – Advanced Exploration Play
BST Gold Project – Advanced Exploration Play 矿证区BST(本加利南部矿证区)是一个详勘阶段的勘探项目 GROWING EXPLORATION FOOTPRINT WITH BOUNDIALI SOUTH ACQUISITION - BST矿证区的获得增加了勘探领地 MULTIPLE GOLD TARGETS DEFINED For personal use only 已经确定了多个黄金矿体霸区 Detailed surface geochemical sampling identified three strong gold anomalies:
Slide 18: BM Gold Project JV – Scout Drilling Results: Plan View
BM Gold Project JV – Scout Drilling Results: Plan View BM(本加利Minex)合作金矿项目初步踏勘钻探结果平面图 HISTORIC DATA 以往勘探数据 For personal use only • 93 AC drill holes • 816 rock chip assays (Gold only) • EM - Airborne geophysical survey • Four RC holes drilled by previous owners, best results include: • 22m @ 1.06 g/t
Slide 19: BM Gold Project JV – Scout Drilling Results Target 1: Section View
BM Gold Project JV – Scout Drilling Results Target 1: Section View BM(本加利Minex)合作金矿项目初步踏勘钻探1号霸区结果平面图 For personal use only AURUM RESOURCES 19
Slide 20: We care about our shareholders and look after all stakeholders
We care about our shareholders and look after all stakeholders 我们关心我们的股东并照顾好所有的利益相关方 (ESG的重要性) For personal use only AURUM RESOURCES 20
Slide 21: Drilling Exploration Dollars Further
Drilling Exploration Dollars Further 我们的钻探 – “一块钱掰成两块花” US$60m For personal use only US$50m US$40m US$30m US$20m US$10m Self-perform DD cost (ASX:TIE) Typical Explorer – contract drilling 350,000m DD completed WE OWN OUR DIAMOND DRILL RIGS AND OPERATORS ONGOING DRILLING OPERATIONS 我们拥有自己的钻机和钻机操作队员 持
Slide 22: West Africa - Destination of Gold Investment Choice
West Africa - Destination of Gold Investment Choice 西非 – 黄金投资选择的目的地 ANNUAL Au DISCOVERIES PRODUCTION BY AREA BY REGION 按照地区对比黄金资源发现 ANNUAL GOLD PRODUCTION BY REGION按照地区对比黄金年产量 2010-2021 IN MILLIONS OF OUNCES (2021) 在2021年的黄金产量(百万盎司) For personal use only 67Moz Mo z EXPLORATION CONSTRUCTION PRODUCTIO
Slide 23: West Africa - Destination of Choice (continued)
West Africa - Destination of Choice (continued) 西非 – 黄金投资选择的目的地(续) ANNUAL GOLD Au CONSTRUCTION PROJECT PRODUCTION 金矿建设年数 BY REGION GOLD PROJECT CONSTRUCTION 金矿建设成本 Based on 44 primary gold projects built since 2010 Capital intensity calculated as development capital costs For personal use only divid
Slide 24: Côte d'Ivoire – Growing Gold Producer
ôte d‘ oire – Growing Gold Producer 科特迪瓦 – 日益增长的黄金生产国 9 For personal use only Extensive Proven Nine operating Gold Excellent Stable 政局稳定 Underexplored Birimian jurisdiction mines infrastructure 尚未被充分勘探 巨大的比日米亚克拉通 已经被证明了的政法财 9座大型露天金矿在生产 优异的基础设施 Political Gold-bearing rocks 税体系 Extensive network of Wo
Slide 25: Why invest in Aurum
Why invest in Aurum 为什么要投资金瑞公司 For personal use only Experience 经验 Knowledge 知识 Trust 信任 Care 关心 Commitment 执着 Management has track More than 1 years’ By Government, investors A out shareholders’ Dedicated to ensure record of creating value experience in country and and project partners investment a
Slide 26: Aurum has launched a bid to acquire Mako
Aurum has launched a bid to acquire Mako Recommended Takeover Of Mako Gold By Aurum Resources – 16 October 20241 金瑞公司在2024年10月16日开启了对Mako公司100%的收购 程序、Mako公司董事会一致同意并推荐股东接受 Rapid growth in ounces –Mako’s e isting shallow, open pittable ounces will provide Aurum with a base load of 868,000 oz2, immedia
Slide 27: Transaction Summary – Mako Gold Acquisition
Transaction Summary – Mako Gold Acquisition 金瑞公司并购Mako公司要点 Proposed Merger • Acquisition of 100% of the fully paid ordinary shares in Mako Gold Limited (Mako) via an off-market takeover • Mako’s Napié Gold Project (Napié) hosts 868,000 ounces at 1.20g/t gold Maiden Mineral Resource and is located al
Slide 28: Growth Focused West African Gold Explorer
Growth Focused West African Gold Explorer 聚焦于在西非发展的黄金勘探公司 CREATING A WELL FUNDED, EXPLORATION AND DEVELOPMENT GOLD BUSINESS For personal use only Location Côte D’Ivoire Côte D’Ivoire Resource Targeted for late CY2024 868,000 ounces at 1.20g/t gold Projects Boundiali Gold Project Napié Gold Project •
Slide 29: Overview of Mako's Assets
Takeover bid launched on 16 October O er iew o o’s Assets 2024 – Success of TKO bid subject to Mako公司的资产简介 acceptance by Mako shareholders ADVANCING THE 868,000 OUNCE GOLD RESOURCE AT NAPIÉ & 8KM-LONG MANGANESE DISCOVERY For personal use only Napié Gold project – Napie金矿项目 • Mako owns the Napié Gold
Slide 30: Napié Project Significant potential along strike and at depth
Napié Project Significant potential along strike and at depth Napie金矿项目 在走向和倾向方向上 具有很大的增长潜力 Takeover bid launched on 16 For personal use only October 2024 – Success of TKO bid subject to acceptance by Mako shareholders AURUM RESOURCES 30 1 The information relating to the Mineral Resource at the Napi
Slide 31: Contact us
For personal use only Contact us + 61 8 6559 1792 Troy Flannery Chairman Email: contact@aurumres.com.au Dr Caigen Wang Managing Director Email: contact@aurumres.com.au Mark Strizek Executive Director Email: contact@aurumres.com.au AURUM RESOURCES AURUMAND CORPORATE RESOURCES | ASX: BOUNDIALI Au AUEU
Slide 32: Appendix
Appendix For personal use only AURUM RESOURCES 32
Slide 33: Aurum's Boundiali Gold Project
Aurum’s oundi li old Proje t The Boundiali Gold Project is comprised of four neighbouring exploration tenements (Figure 3): 1) Boundiali Minex Tenement PR0893 ("BM”), 4 km2, holder Minex West Africa, of which Aurum has 51% and is earning interest of up to 80- % through its fully owned su sidiary Plu
Slide 34: BM gold project JV
BM gold project JV Plusor owns 51% interest through carrying out 8,000m diamond drilling and is working to earn 80% interest. • Completed drilling of 4,000m diamond core to earn 30% interest For personal use only • Completed drilling of second 4,000m diamond core to earn accumulated 51% interest (AS
Slide 35: BD gold project JV
BD gold project JV Plusor owns % interest acquired from D Joint Venture Company’s two shareholders • acquired 45% share capital of DS Joint Venture Company Sarl by paying USD430k to DS Resources Sarl; and For personal use only • acquired 35% share capital of DS Joint Venture Company Sarl from Turaco
Slide 36: Consideration and payment for the BST binding term sheet
Consideration and payment for the BST binding term sheet • Purchase of the tenement is subject to Aurum obtaining a renewal of the BST tenement (or the granting of a replacement) and being satisfied that the terms of the renewal (or replacement permit) do not restrict exploration or potential future
Slide 37: BN gold project JV
BN gold project JV Aurum is earning interest through carrying out exploration to earn 70% interest in three stages: • Stage 1: Aurum earns 35% interest by spending USD 1.2 million within 36 months of license grant For personal use only • Stage 2: Aurum earns 51% interest by spending USD 2.5 million
Aurum Resources — First International Symposium on Near Mine Minerals Exploration 2024 on 6ix