Kinder Morgan, Inc. · NYSE:KMI
Kinder Morgan — Corporate Update (April 2017)
25 slides from Kinder Morgan's corporate update, Apr 20, 2017
Slide 1: WebEx April 20th 2017
www.kindermorgan.com WebEx April 20th 2017
Slide 2: Katie Cornutt, Customer Working Group Coordinator
www.kindermorgan.com Katie Cornutt Scheduling Representative Customer Working Group Coordinator
Slide 3: Agenda
Agenda • DART Conversion Update • Review of 2017 Prioritized List • Scheduling & Reporting Update • Contracts & Capacity Release Update • Allocations & Invoicing Update • Reminders & Next Steps 3
Slide 4: Wade Callen, Manager, Business Processes
www.kindermorgan.com Wade Callen Manager, Business Processes
Slide 5: DART Conversion Update
DART Conversion Update • Last of 4 EP2DART implementations to Go Live October 2017 • New flexibility for Point Operators will hopefully help minimize discrepancies scheduled in mid 2017 • Enhancements to MDQ Utilization window • Capacity Release Re-release Indicator – gives the releasing shipper the
Slide 6: Review of 2017 Prioritized List
KINDERJMORGAN Review of 2017 Prioritized List
Slide 7: 2017 Prioritized Request List
2017 Prioritized Request List 7
Slide 8: Gina Mabry, Manager, Scheduling
www.kindermorgan.com Gina Mabry Manager, Scheduling
Slide 9: Ranked Item #1: Add Totals to Cut Notices
Ranked Item # 1: Add Totals to Cut Notices • The proposed total could appear on either: – Option A- Location row under Change Qty – Option B- As a new row “Upstream Total” and “Downstream Total” 9
Slide 10: Ranked Item #5: Suppress Zeros on Reports
Ranked Item # 5: Suppress Zeros on Reports • Exclude 0’s from reports when nominated volume= 0. – Shipper summary – Shipper detail – Operator summary – Operator detail • A checkbox option is not available through Report Subscription 10
Slide 11: Ranked Item #6/#10: New Report- All Activity for GID
Ranked Item #6/#10: New Report- All Activity for GID • Buy/Sell Report available in DART today – Flowing Gas Additional Reports Company Point Activity (WIVL6010) – By single location or all points – Selected date range • New Report format – Buy/Sell Activity by Location • Keeps summary view • Det
Slide 12: Company Point Activity Report sample
Date: 4/12/2017 SNG Page 1 of 1 Company Point Activity Report wiveeoio FOR FLOW DATE 4/1/2017 THRU 4/1/2017 Point: 611001 SOUTH LA ZONE 0 POOL Physical FiowDtn: = 0 a wearer — ee = oS SS Upstream Totals 13,087 19.087 19,087 ° Coictre Sys Pkg 1D Stve Path Point = Company/Path Point Name. Agent Role T
Slide 13: Total Activity by GID
Total Activity by GID TSP Prop: "705 TSP Name: SOUTHERN NATURAL GAS CO. TSP 5300518 Svc Req Prop: 1234 ‘Sve Req Name: Houston Texans Svc Req 123458789 Contact Name: ‘Scheduling Hotine Contact Phone: (743) 420-7213 Beg Date: 07/01/2016 Statement Date: 0901/2016 Flow Period: Aug-16 End Date: 08/31/201
Slide 14: Total Activity by GID
Total Activity by GID TSP Prop: "70s TSP Name: SOUTHERN NATURAL GAS CO. TSP %200518 Sve Rea Prop: 1234 ‘Sve Reg Name Princpie Party Syo Rea 123458789 Contact Name: Scheduing Hotine Contact Phone: (713) 420-7213, Beg Date own12016 Statement Date ogn12016 Flow Perod: Aug-16 End Date: 0831/2016 Trodoe
Slide 15: Ranked Item #9 Default Package ID Box to be Checked
Ranked Item #9 Default Package ID Box to be Checked • This change has been requested and we will communicate an expected change date once it is determined 15
Slide 16: Sherry Noack, Manager, Contract Administration
www.kindermorgan.com Sherry Noack Manager, Contract Administration
Slide 17: Capacity Release Ranked Items
Capacity Release Ranked Items • Ranked Item #2 - Capacity Release Offer Creation: Have a check box option to auto-populate the release quantity (Max Offer Qty- Loc) at each location with 100% of the Available Prim Qty-Loc instead of manually typing in the quantity at each location. • Ranked Item #3
Slide 18: Capacity Release Ranked Items
Capacity Release Ranked Items • Ranked Item # 7 - Capacity Release Viewing: Add more Filters for on screen viewing of capacity release marketplace transactions (All Offers/Awards) - i.e., include/exclude Replacement Shipper Role, biddable/non-biddable. (Only the 2 listed or are there others?) • Rank
Slide 19: Tracey Nicholson, Manager, Account Services
www.kindermorgan.com Tracey Nicholson Manager, Account Services
Slide 20: No-Notice Withdrawals
No-Notice Withdrawals • SNG has been working to enhance the Swing and OPV/Swing PDAs to allow a no-notice withdrawal on the MFN contract without nominating – Operator Level PDA: A Delivery Operator with no- notice service designates itself to be the swing party as it does today – Shipper Level PDA:
Slide 21: WIVL9000 Loc Opr Alloc Report – Statement Month (RS)
WIVL9000 Loc Opr Alloc Report – Statement Month (RS) • The request was to use statement month for the WIVL9000 report (like WIVL3015) – Other pipelines were not interested in this change • SNG will create a new report called the Loc Opr Alloc Report – Statement Month (RS) – Statement Month vs Produc
Slide 22: Change the Invoice Schedule Sequence
Change the Invoice Schedule Sequence • Show Commodity Charges Before Demand Current Sequence Proposed Sequence Banner Page Banner Page Agent Summary (If Applic) Agent Summary (If Applic) Contract Summary Contract Summary FT RESV MFT COMM FT RESV MFN COMM FT RESV FT RESV FT RESV FT RESV MFT COMM FT R
Slide 23: Katie Cornutt, Customer Working Group Coordinator
www.kindermorgan.com Katie Cornutt Scheduling Representative Customer Working Group Coordinator
Slide 24: Reminders: SoNet Premier System
Reminders: SoNet Premier System 24
Slide 25: Next Steps
Next Steps • Next Customer Working Group WebEx Meeting – July 20th at 1:30 PM CST • Face-to-face meeting in Houston in conjunction with our Transportation/Storage Services Customer Appreciation Event that is being planned - Fall 2017. 25