Prospero Silver — Investor Presentation (January 2013)
25 slides from Prospero Silver's investor presentation, January 2013
Slide 1: Corporate Presentation
Corporate Presentation January 2013
Slide 2: Cautionary Statement
Cautionary Statement This presentation contains certain forward‐looking statements concerning anticipated developments in Prospero’s operations in the future. Forward‐looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “esti
Slide 3: Map of Mexican deposits and Prospero projects
sta. eULALIA Se MAGISTRAL 42 2s {, 4Q BATOPILAS Ws S. FCO. DELGRDR RA pan STA. BARBARA Saie . KPLATOS & os SANTA MARIA DEL ORO MAPIMI , GUANACEVI Ve be ip 6 Mtons 3.7¢/t Au, 475g/t Ag, 15% Pb CAM PANA LACENEGA + aS Ju 6Mitons 5.8g/t Au, 131g/t Ag, 1.5% Pb, 2.3% Zn — ) VELARDENA “i ; 's re GPE: vicip
Slide 4: Overview and Near-term Strategy
Overview • MEXICO‐BASED TEAM TOGETHER FOR 15+ YEARS; 60+ YEARS OF COLLECTIVE EXPERIENCE IN EXPLORATION AND PRODUCTION • SOLID SHAREHOLDER BASE; COMPANY KNOWS ~80% OF SHAREHOLDERS • LARGE PROJECTS, PROJECTS EACH CONSISTING OF CONTIGUOUS CLAIM BLOCKS • TEAM GENERATES AND MAINTAINS PROJECTS AT A LOW IN
Slide 5: Management
Management g Tawn Albinson, M.Sc (Economic Geology) President • Over 25 years experience in exploration l and d mine development, d l allll in Mexico. • Holds a BA of Science in Geology and a Masters of Science in Economic Geology. • Exploration Manager for Industrias Luismin and Grupo Catorce from
Slide 6: Management
Management g Martin Soto VP Exploration • Geological l l engineer with h over 20 years exploration l experience in Mexico and d Centrall America • Recently supervised the in‐fill drilling program at Baja Mining’s Boleo project • Responsible for placing the discovery hole at the Platosa mine in Duran
Slide 7: Share Structure
Share Structure TSX.V: PSL Shares Outstandingg 35,546,466 , , Options Outstanding 2,350,000 Warrants Outstanding 3,165,000 Management/Directors 19.5% Cash $475,000 (as of December 31, 2012) 52 Week Range 52‐Week $0 08 $0 25 $0.08‐$0.25 7
Slide 8: Baborigame (Au, Ag) Chihuahua
Baborigame g ((Au,, Ag) g) Chihuahua • Joint venture agreement signed with Hochschild Mining (Hochschild can earn 51%) in August 2012 • Over 12 veins (20km+) identified in district with potential to host medium medium‐size size epithermal deposit • Historic production from multiple high‐grade gold a
Slide 9: Plan View of the Baborigame District
SILVER CORP. PROSPERO Ooo EXPLANATION — ROADS cul CLAIM BOUNDARY a FAULT 8,736 HAS. A. VEIN Y=269,725.9002 M. (7) POST-VEIN IGNIMBRITES a CEBOLLAS NORTH FIGURE 2 PLAN VIEW OF THE BABORIGAME DISTRICT es \ 5 4% Sec ~ OW rS , - 4 ow PAG ee s I ee iCeRRADOpAKOR EN rE, JCERRADORA Ss o> I NALIT — Ze PAYEI
Slide 10: San Luis Del Cordero (Ag, Cu) Durango
San Luis Del Cordero ((Ag, g, Cu)) Durango • Letter of Intent signed with Silver Standard Resources for joint venture option • Historic production estimated at 70,000 tons mined to depth of 100m – Unverified mined grade on the order of 650 g/t Ag and 2.5% Cu – Direct shipping ore • Summary of 2010 d
Slide 11: Santa Rosa Vein Shaft and Skarn
STA. ROSA VEIN SHAFT SANTA ROSA EAST SKARN 11
Slide 12: | >. Y “LEGEND.
3 | >. Y “LEGEND. Ly” : > oe a BLOCK OF x CLAIMS: ~ bo / ~25,000 nas Y 3 ae a _ INTRUSIVE PP O}20A0Cn8s/Spot image 7 » — » Rocks Py image ©)2011)DigitaliGlobe KM google ST ae © 201n|Google
Slide 13: Campana (Au, Ag) Durango
Campana p ((Au,, Ag) g) Durango • Historic production took place on narrow high‐grade high grade silver‐bearing vein from a shaft ~ 100m deep • Data indicates this is a Peñasquito deposit look‐a‐like – Low‐grade o g ade gogold d co combined b ed with base metals e as – Intersections over substantial
Slide 14: Campana Hill 1: West Zone Based on Historic Holes
CAMPANA HILL 1: WEST ZONE BASED ON HISTORIC HOLES 14
Slide 15: Santa Maria Del Oro (Au, Ag) Durango
Santa Maria Del Oro (Au, Ag) Durango • Very large land position (33,800 hectares) staked by p Prospero in 2011/2012 / • Holdings sit both sides of Magistral del Oro mines (produced historically at average grade > 15 g/t Au) • Western Lineament zone ground magnetic survey indicates structural similar
Slide 16: Zone Locations at Santa Maria Del Oro Project
ZONE LOCATIONS AT SANTA MARIA DEL ORO PROJECT 16
Slide 17: View of Old Plant Site Looking West Towards Magistral Lineament
LOCATION OF MAGISTRAL LINEAMENT UNDER YOUNG VOLCANICS Tsi VIEW OF OLD PLANT SITE LOOKING WEST 17 TOWARDS MAGISTRAL LINEAMENT
Slide 18: Matorral System, Pastoria-Llanos Valley
PASTORIA – LLANOS VALLEY MATORRAL SYSTEM OLD PLANT SITE 18
Slide 19: Epithermal System: How Metals Reach Surface
Epithermal System: How Metals Reach Surface • Convective boiling water with CO2 (average 1.5%; Cola is 0.5%; dotted green zones in diagram) climbs through basement rocks to surface • Vapor from f this h water fforms stagnant, steam heated pools that cause clay alteration and low temperature silicifi
Slide 20: Matorral Geochemistry Highs
Matorral Geochemistryy Highs g • The Mexican Altiplano contains multiple epithermal deposits that are large and high‐grade in nature,, yyet the surface areas at most exhibit low or mere trace amounts of valuable minerals • Prospero’s Matorral target features exceptionally high readings at surface fo
Slide 21: El Petate (Au, Ag, Pb, Zn) Hidalgo
El Petate (Au, Ag, Pb, Zn) Hidalgo • Large land position (6,000 hectares) staked by Prospero in August 2012. No third party inner claims. • Two zones with high‐level silicified reefs occur within an area 5 Kms X 4.5 Kms, hosted within the Mesozoic fold belt of Sierra Madre Oriental. • 360 rock chip
Slide 22: El Petate Project Plan View with Geology and Rock Geochemistry
PROSPERO SILVER CORP. LEGEND N [Qal | Alluvium Pachuca Group Andesites w E Mendez Fm Shales, sandstones El Abra Fm - Ss Limestones [fa] Dikes - Andesite/Syenite Float & outcrops of jasperoid + Recumbent syncline Roads ~~ Creek LAESCOBA NGBTH Or 3B) / 100961 LA ESCOBA CENTRAL PETATE 2251000 000 (APAR
Slide 23: El Petate Plan View with Geology and Rock Geochemistry
PROSPERO SILVER CORP. © LAESCORA NORTH ie | __ LEGEND ‘i fi Sem 3 |s | [@al] Attuvium > y = | : es [ag] Pachuca Group . Fa Wes Caan | LEB andesites Ww E ag? COBA | Mendez Fm Km | Shales, sandstones i | i El Abra Fm - Ss M2} | imestones * | Fal Dikes - * oe AAS yy, at = | ka Andesite/Syenite fupers =
Slide 24: Milestones
Milestones Objective Target Date Status Phase 2 drill program Cordero Summer 2011 Phase 1 drill program Campana Winter 2011 Santa Maria field work Spring/Summer 2012 Joint venture Baborigame g Summer 2012 Joint venture Cordero January 2013 Baborigame drilling (by Hochschild) February 2013
Slide 25: Investment Highlights
Investment Highlights g g TSX‐V: TSX V: PSL • Management team with extensive PROSPERO SILVER CORP. experience in: 390-3600 LYSANDER LANE > Mexico RICHMOND, B.C. V7B 1C3 > Exploration E l ti & D Development l t 604 248 0797 604-248-0797 > Finance & Construction INVESTOR INQUIRIES: • Excellent share s
Prospero Silver — Investor Presentation (January 2013) on 6ix