Boral Ltd.

Boral — Corporate Update (September 2021)

36 slides from Boral's corporate update, Sep 24, 2021

  1. Slide 1: Berrima Colliery – Closure Working Group Meeting #11

    Click to edit Master title style Subheader Berrima Colliery – Closure Working Group Meeting #11 24 September 2021

  2. Slide 2: Agenda

    Agenda 1. Welcome and Apologies - Introductions 2. Terms of Reference - Conduct of CWG Members 3. Review of minutes & actions 4. Water Quality Results update - Greg Johnson 5. Water treatment update- Greg Johnson/David Spears 6. Mine Operations Plan Status– Greg Johnson 7. Pit top treatment approval

  3. Slide 3: Welcome and Apologies

    01 Welcome and Apologies

  4. Slide 4: CWG Representatives, Apologies & Guests

    CWG Representatives, Apologies & Guests ● Boral - Girish Yadwad, Greg Johnson, David Spears, Kate Woodbridge ● Resource Regulator - Greg Kininmonth, Peter McMillan ● Environment Protection Authority - William Dove, Andrew Couldridge (apology), ● WaterNSW - Ravi Sundaram ● Wingecarribee Shire Council

  5. Slide 5: Terms of Reference – Code of Conduct

    02 Terms of Reference – Code of Conduct

  6. Slide 6: Terms of Reference – Code of Conduct

    Terms of Reference – Code of Conduct 6

  7. Slide 7: Review of minutes and actions

    03 Review of minutes and actions

  8. Slide 8: Review of Minutes – suggested amendments

    Review of Minutes – suggested amendments 8

  9. Slide 9: Review of minutes - actions

    Review of minutes - actions Boral to commence discussions with the Belbin’s in relation to their bore. Tony McCormick to contact Terry Renahan in relation to arranging a meeting with Boral. Boral to prepare a newsletter with particular emphasis on the pit top treatment project and target the Medway

  10. Slide 10: Water Quality Results Update

    04 Water Quality Results Update

  11. Slide 11: Surface Water Monitoring Update

    Surface Water Monitoring Update 11

  12. Slide 12: Water Quality Guidelines

    Water Quality Guidelines In order to interpret and give context to the water quality monitoring results from the Colliery we are now including details, where applicable, against the Australian Water Quality Guidelines for Freshwater Protection, Australian Water Quality Guidelines – Primary Industry

  13. Slide 13: Adit discharge update – Volume, pH & EC

    Adit discharge update – Volume, pH & EC Volume discharged – 1.7 ML per day (av.) pH – dosing is continuing EC – stabilising at or below 1000uS/cm 13

  14. Slide 14: Adit discharge update – Iron & Manganese

    Adit discharge update – Iron & Manganese Iron – Continues to remain low Manganese – improving trend down. 14

  15. Slide 15: Adit discharge update – Nickel and Zinc

    Adit discharge update – Nickel and Zinc Nickel – stabilised to levels seen during mining. Zinc – stabilised to levels seen during mining. Commentary – Lime dosing has had the desired effect on slightly raising the pH while reducing Ni and Zn to historical levels. Aeration is the key driver to manage

  16. Slide 16: River Quality Update

    River Quality Update BCRAL ©

  17. Slide 17: River quality update – pH & EC

    River quality update – pH & EC Note: we no longer are required to monitor at the 100m, 1km, 2km or 3km points downstream pH – No influence in river at Biloela (6km) EC – No influence in river at Biloela (6km) 17

  18. Slide 18: River quality update – iron & manganese

    River quality update – iron & manganese Iron – Levels remain low, discharge concentrations are below usual river levels. Manganese – Low levels continue to be recorded in the river 18

  19. Slide 19: River quality update – Nickel and Zinc

    River quality update – Nickel and Zinc Nickel – Discharges influencing levels within mixing zone, river is well below 95% protection down stream. Zinc – Levels below 95% protection downstream. Upstream influence in July 2021 sampling. 19

  20. Slide 20: River quality update – Sulphate and commentary

    River quality update – Sulphate and commentary Copper – Below stock drinking levels. Other sources influencing. Sulphate – Discharges influencing downstream, however, well below any trigger points. 20

  21. Slide 21: Water Treatment Update

    OS Water Treatment Update eee

  22. Slide 22: Water treatment update

    Water treatment update • The temporary lime dosing system remains in place, to raise the pH of mine water discharge. • Dosing rate has been successful in raising pH from 6.5 to 7.2. • As we will continue to dose with lime going forward a continuous dosing system is being investigated and the install

  23. Slide 23: Bulkhead water level update

    Bulkhead water level update Discharge averaged 1.7ML/day between June 2021 and September 2021 23

  24. Slide 24: Mine Operations Plan Status

    06 Mine Operations Plan Status

  25. Slide 25: Mine Operations Plan

    Mine Operations Plan • The Stage 2 Final Closure MOP has been placed on hold. • The original goal was to have the Stage 2 MOP approved and once completed seek to relinquish the lease. • Further studies on underground water quality post installation of pit top treatment is expected to determine if th

  26. Slide 26: Pit Top Treatment Approval Pathway

    07 Pit Top Treatment Approval Pathway

  27. Slide 27: Tip Top Treatment and Pipeline – Approval Pathway

    Tip Top Treatment and Pipeline – Approval Pathway • Scoping report prepared and submitted to DPIE • Meetings held with DPIE, RR and EPA (July & August) • RR raised concerns about long term management of waters, if the pit top treatment was the best option in the longer term, risks to closing mine an

  28. Slide 28: Environmental Protection Licence and Mining Lease Update

    08 Environmental Protection Licence and Mining Lease Update

  29. Slide 29: Environmental Protection Licence & Mining Lease

    Environmental Protection Licence & Mining Lease EPL 608 The licence was amended in August 2021 to remove the requirement to undertake dust monitoring and testing of oil and grease in discharge waters. Annual PIRMP drill was undertaken on 20th September, with a review underway of the PIRMP. CCL 748 S

  30. Slide 30: Mandemar Lane Update

    09 Mandemar Lane Update

  31. Slide 31: Mandemar Lane update - Subsidence

    Mandemar Lane update - Subsidence No update on groundwater this quarter, which was to be the final. Lockdown and restrictions on regional travel prevented downloads and analysis by Dr Katarina David. Subsidence – Matthew Montgomery from Subsidence Advisory is a guest today (claims). Note Principal S

  32. Slide 32: Communications Update

    10 Communications Update

  33. Slide 33: Communications update

    • Introduction – Kate Woodbridge new Stakeholder Relations Manager NSW/ACT • Newsletter – September 2021 newsletter released last week. Distribution limited to CWG members and Berrima PO notice board • Media relations – ongoing communication and announcements will be through media contacts managed b

  34. Slide 34: General Business

    11 General Business

  35. Slide 35: Next Meeting

    12 Next Meeting Friday 10 December 2021

  36. Slide 36: Thanks for your participation

    Thanks for your participation 36