Buru Energy Ltd · ASX:BRU

Buru Energy — Investor Presentation (September 2012)

37 slides from Buru Energy's investor presentation, Sep 11, 2012

  1. Slide 1: ASX Announcement: Corporate Presentation

    Buru Energy Limited ABN 71 130 651 437 Level 2, 97 William Street Perth WA 6000 PO Box 7794, Perth Cloisters Square WA 6850 Ph: 61-8 9215 1800 Fax: 61-8 9215 1899 www.buruenergy.com For personal use only ASX ANNOUNCEMENT (ASX: BRU) 11 September 2012 Corporate Presentation Buru Energy Limited (“Buru”

  2. Slide 2: Corporate Update September 2012

    For personal use only Corporate Update September 2012

  3. Slide 3: Buru Energy – Investment Proposition

    Buru Energy – Investment Proposition  Enormous Buru acreage spread in the most exciting onshore Australian basin For personal use only  “Company Maker” Ungani frontier oil discovery has transformed the conventional exploration potential of the basin  Multi TCF tight gas resources defined with hig

  4. Slide 4: Regional Setting

    For personal use only Regional Setting 3

  5. Slide 5: Australia in Context

    Australia in Context Australia has a major conventional gas industry with major CSG to LNG industry and rapidly developing shale and tight gas For personal use only industry Substantial gas reserves • Total 2P conventional gas reserves of around 170 TCF as at January 2010 • Major CSM to LNG industry

  6. Slide 6: Western Australia in Context

    Western Australia in Context Western Australia is a major energy hub with a well developed export market For personal use only WA statistics • ~64% of Australia’s natural gas reserves are in WA • In 2010 WA produced ~1.3 TCF of gas (including 16.57 MMT LNG for export), 46.3 million barrels of conden

  7. Slide 7: Canning Superbasin – Infrastructure

    Canning Superbasin – Infrastructure Overview For personal use only • Two regional centres (Broome and Derby) provide support infrastructure, airline access etc. • The Kimberley is the size of Texas or France with a population of 41,000 people. Half the population are of Aboriginal or Torres Strait d

  8. Slide 8: Native Title and Heritage

    Native Title and Heritage • Covered by 10 major native title groups For personal use only • Heritage Protection Agreements are required prior to grant of Titles • Heritage clearances required before ground disturbing works • Production agreements required prior to issue of production licences • Over

  9. Slide 9: Corporate Background

    For personal use only Corporate Background 8

  10. Slide 10: Corporate Snapshot

    Corporate Snapshot Activity provides continuing re-rating potential Quick Facts • Listed on Australian Securities Exchange (ticker BRU), For personal use only included in S&P/ASX 200 Index Share price (7 September 2012) $2.65 • Tightly held shareholder register transitioning to greater Shares 251,03

  11. Slide 11: Proven Management Team and Capability for Growth

    Proven Management Team and Capability for Growth Buru’s Board and management has extensive oil and gas experience with a proven ability to develop oil and For personal use only gas companies, delivering material upside to shareholders • Board: ‒ Currently appropriately small board of two Non- execut

  12. Slide 12: Unmatched Acreage Position

    Unmatched Acreage Position Largest acreage holder in Canning Superbasin covering all major conventional and unconventional plays For personal use only • Net ~14 million acres (~57,000 sq km) with high permit equities and operatorship. Portfolio optimisation ongoing • Acreage position allows a system

  13. Slide 13: Regional Geological Background and Conventional Potential

    For personal use only Regional Geological Background and Conventional Potential 12

  14. Slide 14: Canning Superbasin – Underexplored and Highly Prospective

    Canning Superbasin – Underexplored and Highly Prospective Huge underexplored Palaeozoic aged Superbasin with three major petroleum systems For personal use only (a Superbasin is a composite basin made up of a number of smaller basins) Ordovician – Silurian: Thick, high quality source rocks and regio

  15. Slide 15: Superbasin Exploration History

    Superbasin Exploration History For personal use only Canning Superbasin drilling history • ~250 wells drilled and 78,000 kms of seismic acquired • Well density per 10,000 sq km (2.5 million acres) - Canning 4 wells Canning Superbasin seismic and well density - US Palaeozoic basins 500 wells • Cannin

  16. Slide 16: Operational Exploration and Development Process

    Operational Exploration and Development Process Buru has undertaken a detailed review of the geology of the Superbasin to For personal use only focus its exploration efforts • Exploration driven by province evaluation and general prospectivity • Deep and high quality portfolio means prioritisation a

  17. Slide 17: Conventional Oil and Gas Potential

    Conventional Oil and Gas Potential “Company Maker” oil discovery at Ungani • Ungani oil discovery in late 2011 opened a new play For personal use only type with substantial regional potential • Conventional good quality reservoir • Appraisal drilling program planned following 3D seismic acquisition

  18. Slide 18: Ungani Trend: Huge Follow-Up Potential

    Ungani Trend: Huge Follow-Up Potential Ungani oil discovery a “game changer” for the Superbasin For personal use only • Substantial oil column (+50m) in very high quality conventional dolomite reservoir confirmed by two wells • Excellent quality 37o API high yield sweet crude oil – benchmarked to Br

  19. Slide 19: Ungani Oilfield Development

    Ungani Oilfield Development • The Ungani Oilfield was discovered in October 2011 and commenced test production in June 2012 • The facility is operated 24 hours per day by operators working 12 hour day shifts • The system provides three phase oil/gas/water separation (there is currently no gas or sig

  20. Slide 20: Ungani North-1: Large Conventional Ungani Trend Structure

    Ungani North-1: Large Conventional Ungani Trend Structure Large conventional oil prospect - Next well to be completed with Ensign Rig#32 For personal use only • Located ~6 km north of the Ungani Field within the Ungani “Declaration of Location” graticular blocks • Ungani North structure has the pote

  21. Slide 21: Unconventional Potential

    For personal use only Unconventional Potential 20

  22. Slide 22: Canning Superbasin Unconventional: Regional and Tight Gas

    Canning Superbasin “Unconventional” : Regional and Tight Gas The US Energy Information Agency (“EIA”) identifies the Canning Superbasin as having For personal use only the largest “shale” or unconventional gas potential in Australia • Independent consultant NSAI reviewed the potential for Buru • Bur

  23. Slide 23: Canning Superbasin – Unconventional Potential

    Canning Superbasin – Unconventional Potential Five major unconventional plays in the Superbasin – Buru is currently concentrating on two: For personal use only • Laurel Formation – very widespread, thick and gas mature with significant liquids content. New and existing wells confirm a Basin Centred

  24. Slide 24: Major Gas Resources – Laurel Formation Accumulations

    Major Gas Resources – Laurel Formation Accumulations Major tight gas accumulation with regional basin centred extent For personal use only • Laurel Formation is a thick, regionally extensive package of sands, shales and limestones with in excess of 1,300 meters of gas saturations in recent wells • M

  25. Slide 25: Major Gas Resources – Laurel BCGA

    Major Gas Resources – Laurel BCGA Valhalla - major tight gas accumulation confirmed by independent review For personal use only • McDaniel & Associates a specialist North American tight gas and unconventional resource assessment consulting group, have completed an independent assessment of the prosp

  26. Slide 26: Yulleroo-3: Major Laurel Formation Gas Accumulation

    Yulleroo-3: Major Laurel Formation Gas Accumulation Yulleroo wet gas field has major resources and is on the pathway to development For personal use only • Current resource estimate of Yulleroo field – independent review by RISC confirms gross mean recoverable resources of: ‒ 352 PJ (332 BCF) recove

  27. Slide 27: Asgard-1 well summary

    Asgard-1 well summary Strategic test of the southern extension of the Valhalla BCGA For personal use only • Located ~35 km southeast of the Valhalla-2 well • Deliberately sited off structure (although seismic data in the area is sparse) • Currently drilling vertical well with a prognosed total depth

  28. Slide 28: Major Oil and Gas Potential – Goldwyer Shale

    Major Oil and Gas Potential – Goldwyer Shale Goldwyer Shale Formation - thick, regionally extensive organic rich shale, “Bakken” For personal use only analogue • Proven potential in Buru's acreage from well intersections, and Buru analysis work • Thick, organic rich shales in the oil window grading

  29. Slide 29: Forward Program

    For personal use only Forward Program 28

  30. Slide 30: Extensive Continuous Appraisal and Exploration Program

    Extensive Continuous Appraisal and Exploration Program 2012/13 program a complementary mix of exploration and appraisal For personal use only • Long term rig contract with Ensign Drilling, other rigs contracted as needed • Focussed program on highly prospective areas Ungani • 3D seismic • Appraisal/

  31. Slide 31: Major company participation increasing

    Major company participation increasing Value proposition being recognised • Intense interest in the Superbasin with majors For personal use only taking positions • No significant vacant acreage remaining • Corporate/farmin deals now the only entry points • Mitsubishi farmin to Buru a first mover adv

  32. Slide 32: Commercialisation Activity On Track

    Commercialisation Activity On Track Buru’s focused and well developed business plan is being successfully executed by bringing resources into For personal use only production Oil • Ungani field “Location” declared by the DMP – the first step in obtaining a Production Licence • Production Licence app

  33. Slide 33: Staged Gas Commercialisation

    Staged Gas Commercialisation The overall commercialisation project has For personal use only the following key steps: • Stage 1: 2012/2013 Exploration Stage – Completion of quantification of 3C reserves by current drilling program. Stimulate and test up to 7 wells • Stage 2: 2014 Pilot projects - Pa

  34. Slide 34: Corporate Summary

    For personal use only Corporate Summary 33

  35. Slide 35: Committed to Social and Environmental Responsibility

    Committed to Social and Environmental Responsibility Buru is committed to ensuring it does not breach its “social licence to operate” by ensuring: For personal use only Exemplary environmental performance • Minimising its impact on the environment and on the communities in which it operates • A proc

  36. Slide 36: Disclaimer

    Disclaimer Important notice For personal use only This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru"). This presentation contains certain statements which may constitute "forward-looking statements". It is believed that the expectations reflected in these statements ar

  37. Slide 37: For personal use only

    For personal use only Corporate Update September 2012

Buru Energy — Investor Presentation (September 2012) on 6ix