Etrion Corp. · OTC:ETRXF

Etrion — Renewables & Mining Summit and Exhibition 2014

20 slides from Etrion's conference presentation, Oct 16, 2014

  1. Slide 1: Renewables & Mining Summit and Exhibition

    Renewables & Mining Summit and Exhibition “Lessons Learned from Exploring a Long‐Term PPA with a Mine” Presented by: Marco Antonio Northland, Chief Executive Officer October 16, 2014 1

  2. Slide 2: Corporate Overview

    CORPORATE OVERVIEW 2

  3. Slide 3: The Lundin Group

    THE LUNDIN GROUP  Etrion is part of the Lundin Group of Companies, 11 publicly‐traded companies in the mining and energy sectors  The companies range from exploration stage to advanced development and production, operating in over 30 countries worldwide with a combined market capitalization of ove

  4. Slide 4: Etrion Corporation

    ETRION CORPORATION Company Overview Financial Summary  Independent power producer (IPP) that builds, owns and Recent Share Price (TSX/OMX: ETX) CAD$0.50 / SEK 3.31 operates ground‐based solar photovoltaic (PV) power generation plants focusing on three key markets (Italy, Chile and Japan) Shares Out

  5. Slide 5: Utility-Scale Solar Power Generation

    UTILITY‐SCALE SOLAR POWER GENERATION Goal: Build, own and operate solar electricity plants at lowest cost per kWh Competitive Advantages of Solar Power Easy to permit Lowest marginal cost Fast to build Competitive at all sizes Simplicity Economics Easy to operate Low risk High flexibility in locatio

  6. Slide 6: Business Model – Key Drivers

    BUSINESS MODEL – KEY DRIVERS Key drivers Rationale PREDICTIBLE & STABLE REVENUES 1. Long‐term contracts  Annual solar irradiation varies less than 10% REVENUE 2. Solar irradiation  Economic growth increasing power demand and wholesale electricity prices  Improving technology increasing plant perf

  7. Slide 7: Etrion Assets and Global Solar Capacity (2013)

    ETRION ASSETS AND GLOBAL SOLAR CAPACITY (2013) 7

  8. Slide 8: Case Study: Our Experience in Chile

    CASE STUDY: OUR EXPERIENCE IN CHILE 8

  9. Slide 9: Chilean Power Market

    CHILEAN POWER MARKET Overview Chile – Installed Capacity by Source 2013  In 2013, Chile had 18 GW of total installed power capacity, of which 17% Wind large hydro and natural gas made up more than 50% 21% 2% Biomass & Waste  Solar installed capacity expected to reach over 550 MW by the end of 2% 8

  10. Slide 10: Two Non-Exclusive Ways for Solar IPP to Operate in Chile

    PPA VS. MERCHANT ELECTRICITY MARKET IN CHILE Benefits: TWO NON‐EXCLUSIVE WAYS FOR SOLAR IPP TO OPERATE IN CHILE  Long‐term contracts, providing stable/predictable price for mining companies LONG‐TERM  Ability to obtain attractive project finance (in terms of tenor and pricing) PPAs Challenges: (so

  11. Slide 11: Project Salvador – 70 MW, 200 GWh per Year

    PROJECT SALVADOR – 70 MW, 200 GWH PER YEAR SALVADOR (70 MW) Project Details Capacity 70 (49 net) MW Irradiation Yield 2,916 kWh/kWp Merchant project in the SIC (spot market pricing Revenue Stream with ability to secure future PPAs) Production 200 (140 net) GWh/year Land Government concession Start o

  12. Slide 12: Etrion Addressing the Mining Sector

    ETRION ADDRESSING THE MINING SECTOR ISSUE ETRION’S SOLUTION Energy Cost Defined price for the length of the PPA to on‐grid / off‐grid mining operations Solar plant can be built in close proximity to mine Location (using mine’s substation and transmission line) or off‐site Highly reliable solution wi

  13. Slide 13: Aguas Blancas Project

    AGUAS BLANCAS PROJECT  Project (Aguas Blancas): 8.8 MW PV solar power plant located in the north of Chile within the province of Antofagasta. Aguas Blancas, comprised of one site, located approximately 3 km from the mine, was to be connected directly to the mine’s substation (minimizing transmissio

  14. Slide 14: Site Location – Main Decision Factors

    SITE LOCATION – MAIN DECISION FACTORS BENEFITS CHALLENGES On Site Avoid interconnection losses Interconnection ownership during and after PPA Avoid marginal costs delta/risk Site ownership during and Faster permitting (mining rights easements) after the PPA “Close to Heart and Eyes” of off‐taker Log

  15. Slide 15: Value Proposition – Cost Benefit Analysis

    VALUE PROPOSION – COST BENEFIT ANALYSIS ITEM VALUE PROPOSITION Energy Solution Etrion addressed 30% of AMC's energy needs. Over 99.5% availability Scalability & Reliability and expansion capacity based on future needs PPA Price Proposed PPA options of 15‐20 years. Priced competitively nearly 10% Pea

  16. Slide 16: Externalities

    EXTERNALITIES Iodine prices (USD/kg) 60.0 55.0 50.0 USD/KG 45.0 40.0 35.0 30.0 Etrion signs 15 year PPA with AMC AMC announces suspension of production 16

  17. Slide 17: Summary

    SUMMARY 17

  18. Slide 18: Etrion – The Energy Solution for Mining Companies

    ETRION – THE ENERGY SOLUTION FOR MINING COMPANIES  60 MW of installed capacity in Italy  Operating platform of 17 solar power plants in Italy consistently OPERATIONAL perform above plan with 99.6% availability (YTD) EXCELLENCE  Centralised monitoring system and effective asset management structur

  19. Slide 19: Disclaimer

    DISCLAIMER These materials and the information contained herein are being presented by Etrion Corporation (the “Company”). By attending a meeting where these materials are presented, or by reading them, you agree to be bound by the following limitations and notifications. These materials are strictl

  20. Slide 20: Contact Details

    Contact Details Etrion Corporation Rue de la Rotisserie 1 CH ‐ 1204 Geneva Switzerland Phone: +41 22 715 20 90 Email: info@etrion.com Website: www.etrion.com 20