Xtract Resources PLC · LSE:XTR

Xtract Resources — Investor Presentation (June 2016)

15 slides from Xtract Resources's investor presentation, Jun 16, 2016

  1. Slide 1: Xtract Resources Plc - Our future growth

    Xtract Resources Plc (AIM:XTR) Our future growth London – 16 June 2016

  2. Slide 2: Welcome

    Welcome Thank you for being here today 2

  3. Slide 3: Strategy

    Strategy Our core asset is the Chepica gold mine (it is our top priority) with a large lease area This asset despite all the problems we have experienced (which is normal for any small start up operation) it is well capitilised and is producing The Manica asset is a great project (not a producer yet

  4. Slide 4: Manica

    Manica The Company acquired the Manica Asset for total of $12.5 million: • $4 million in Xtract Shares • $5 million in cash (to date) • $2.5 million final cash payment • $1 million BFS costs Gross Proceeds $17.5 million Net position realised $5 million 4

  5. Slide 5: Chepica Gold Mine

    Chepica Gold Mine Aerial view of mine taken with Phantom 3 Professional Drone 5

  6. Slide 6: Key operating metrics

    Key operating metrics • Most of tons sent to mill comes from on reef development • Total re-design was undertaken of mine in October 2015 after massive earthquake • Completed limited stoping to date (three levels remain pre-developed/ready to be mined) • Note: mill tons to increase to approximately

  7. Slide 7: Further scope to increase volume from underground

    Further scope to increase volume from underground Chepica is consistently delivering on volume of 280t/day Upgrading crushing circuit to provide capacity to produce volume of up to 340t/day (next six months) Upgrade in crushing circuit is improving milling capacity and grind (improved recoveries) Un

  8. Slide 8: Significant drilled resource at Colin

    Significant drilled resource at Colin Another 6 levels of mineralization defined at widths of 1,5 to 4,25m at grades of 1 to 12,8g/t of Au 8

  9. Slide 9: Three high grade levels ready for stoping and more high grade mineralization below

    Three high grade levels ready for stoping and more high grade mineralization below 9

  10. Slide 10: Pb-Zn concentrate in addition to Au concentrate

    Pb-Zn concentrate in addition to Au concentrate Ore body at depth at Colin has signifcant quantities of Pb and Zn Up to 1% Zn in rock samples and core Pb-Zn has caused a problem in past 2 months in terms of floating gold We have changed the plant circuit and will now produce a Pb-Zn and Gold concent

  11. Slide 11: Chepica tailings dam project

    Chepica tailings dam project Surface stockpiles Processing plant ±225kt @ 1g/t Tailings dam extension 11

  12. Slide 12: Increase production from tailings operation by 10kt/mth

    Increase production from tailings operation by 10kt/mth We are allocating debt capital to start construction of 6 tailings ponds that will leach an additional 10kt/mth Capital of US$1.25m to complete the project Have completed raising the current tailings dam wall by 4m and have doubled the wall thi

  13. Slide 13: A Reality check

    A Reality check Chepica goals: Consitant delivery of tons to the plant Consistant concentrate mass and grade Short interval control All other areas resolved at Chepica – so focussing on cash flow from this production asset Realising significant cash from the sale of Manica 13

  14. Slide 14: Contact Details

    Media and Investor Enquiries: Justine James Gable Communications 34 Lime Street London EC3M 7AT T: +44 (0) 7525 324431 e-mail: xtract@gablecommunications.com Company Secretary: Phil Dexter St James’s Corporate Services Limited Suite 31, 2nd Floor, 107 Cheapside London EC2V 6DN T: +44 (0) 20 7796 864

  15. Slide 15: Disclaimer

    Disclaimer This presentation (“Presentation”) is being issued by Xtract Resources PLC. (the “Company” or “Xtract”) for information purposes only. The content of this Presentation has not been approved by an authorised person for the purposes of Section 21(2)(b) of the Financial Services and Markets