  1. Slide 1: Escondida site tour

    Escondida site tour Edgar Basto President Escondida 1 October 2012

  2. Slide 2: Disclaimer

    Disclaimer Forward looking statements This presentation includes forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 regarding future events, conditions circumstances and the future financial performance of BHP Billiton conditions, Billiton, inc

  3. Slide 3: Disclaimer: Exploration Targets and Mineral Resources

    Disclaimer Exploration Targets and Mineral Resources This presentation includes information on Exploration Targets (Potential Mineralisation) and Mineral Resources. Mineral Resources are compiled by: L Soto (MAusIMM) (MAusIMM), M Cortes (MAusIMM) and R Preece (FAusIMM) – Escondida mineral district d

  4. Slide 4: Chilean site tour program

    Chilean site tour program Day 1: Sunday, 30 September 2012 Welcome and safety induction Brendan Harris Non-ferrous overview Andrew Mackenzie Well positioned to deliver low risk copper growth Peter Beaven Base Metals performance overview Margaret Beck Low risk, high return projects Peter Beaven Our c

  5. Slide 5: Escondida visit

    Escondida visit Time Description 07:00 – 09:30 Coach transfer from Terrado Suites to Escondida 09:30 – 11:00 Escondida management presentations 11:00 – 12:00 Lunch with Escondida management 12:00 – 15:00 Escondida site tour 15:00 – 15:30 Afternoon tea 15 30 – 18:00 15:30 18 00 C Coach h ttransfer f

  6. Slide 6: Visitor safety induction

    Visitor safety induction • Stay with your escort at all times – especially if an emergency occurs • You will be advised when to wear – a reflective vest and safety helmet – safety glasses (fit over prescription glasses) – face mask – gloves – hearing protection • Use handrails when on stairs • Keep

  7. Slide 7: Key themes

    Key themes • A well established, experienced and diverse management team • Leading industry HSEC performance • Operation is performing well following temporary challenges in FY12 • The release of latent capacity will deliver material unit cost savings • Low risk, high return growth projects will sus

  8. Slide 8: Escondida leadership team

    Escondida leadership team Well established, experienced and diverse President Escondida Edgar Basto Head of Head of Head of HR Head of HSEC Finance Production Jorge Lopez Marcelo Maree Pedro Damjanic Ocampo Robertson Head of Head of Manager Projects Resource External Affairs Claudio Monken Planning

  9. Slide 9: Strong focus on health, safety, environment and the community

    Strong focus on health, safety, environment and the communityy • Use of forced air helmets in electrowinning plant to reduce exposure to acid mist alth • Implementation of plans to minimise exposure e pos re to silica, silica noise and acid mist Hea • Monitoring and managing fatigue • Monitoring cam

  10. Slide 10: Industry leading HSEC performance

    Industry leading HSEC performance • Reduction in Significant Incidents and Escondida Total Recordable Injury Frequency (TRIF) benchmark TRIF despitep increased level (number of recordable injuries per million hours worked) of activity from major projects 4 3 • Significant development in Material Ris

  11. Slide 11: Good community citizen

    Good community citizen • Recognised as the leading mining company Chile’s most respected companies (2012) in Chile Minera Escondida ZOFRI • We have good relationships with the ENTEL community, supported by our foundations CODELCO and local community programs FORUS Andina Sociedad Punta del Cobre • M

  12. Slide 12: Escondida: the world's leading copper mine

    Escondida: the world’s leading copper mine • Largest copper mine in the world – Escondida pit › depth 645 m › dimensions 3.9 km x 2.7km – Escondida Norte pit p › depth 525 m › dimensions 2.5 km x 2.2 km Escondida and Escondida Norte pits • BHP Billiton 57.5% 57 5% interest and operator • 4,000 emplo

  13. Slide 13: Escondida: operations overview

    Escondida: operations overview Los Colorados Escondida Pit Escondida Norte Pit Laguna Seca Approximately Concentrator Plants 230 ktpd ore processed Crusher Copper Coloso Port Waste Oxide Mix Ore Sulphide p Concentrate Approximately pp y 3.5 mtpa of Crusher concentrate shipped Sulphide Ore Stock Dump

  14. Slide 14: Escondida: mine operations overview

    Escondida: mine operations overview Mine mobile equipment Total material moved per day (mtpd) • 18 shovels • 171 trucks 1.6 • 5 front end loaders • 20 drills • 22 bulldozers 1.2 • 19 wheel tyre dozer • 14 graders • 13 water trucks 0.8 Mine fixed equipment • 5 primary crushers • 35 km conveyor belts

  15. Slide 15: Escondida: concentrator plants overview

    Escondida: concentrator plants overview Los Colorados Los Colorados • Started operations in 1990 • 120 ktpd design capacity • Average monthly energy consumption of 62,000 MWh Laguna Seca • Started operations in 2002 • 110 ktpd design capacity • Average monthly energy consumption of 62,000 MWh BHP Bi

  16. Slide 16: Escondida: hydrometallurgy processes overview

    Escondida: hydrometallurgy processes overview • Two solvent extraction plants (oxide and Electrowinning area sulphide) p ) • Sulphide and oxide ore leached in separate pads • Electrowinning with a nominal capacity of 330 ktpa • The cathodes produced are transported to A t f Antofagasta t portt for f

  17. Slide 17: Strong growth over the last years

    Strong growth over the last 20 years Escondida copper production Sulphide Leach Head grade (mt, 100% basis) 180 kt (%) Laguna Seca 1.5 Oxide Leach Debottleneck 4 150 kt Phase 4 Escondida Phase 3.5 Ore Access 1.2 25 ktpd p 120 ktpd 3 0.9 Phase 3 Phase 2 50 ktpd +50 2 +15 ktpd 0.6 Phase 1 35 ktpd 1 03

  18. Slide 18: Concentrate production and throughput affected by temporary challenges

    Concentrate production and throughput affected by y temporary p y challenges g • In recent years, throughput affected by Throughput Payable metal (ktpd, 100% basis) (kt, 100% basis) – crushing and conveying equipment reliability issues due to aging of the 300 1,400 system 225 1,050 – ore hardness, w

  19. Slide 19: Strong recovery underway

    Strong recovery underway • Successfully carried out the largest Equipment vulnerability index (crusher and conveyor)1 maintenance shut-down in the history y of (%) Escondida during July and August 2012 15 – will impact production in Q1 FY13 as 10 planned 5 – no change to FY13 production guidance 0 A

  20. Slide 20: Unit costs affected by industrial action and one-off events

    Unit costs affected by industrial action and one-off events • Copper unit cash costs increase by 24% in Cost breakdown FY12 due to a number of temporary p y (FY12) challenges – grade decline Other 30% Contractors 31% – labour unrest – equipment reliability issues Replacement parts 12% Labour 14% • O

  21. Slide 21: Targeting significant unit cost savings

    Targeting significant unit cost savings • Economies of scale benefits Unit cash cost (index, FY08=100) – access to higher grade ore with the completion of Escondida Ore Access project 250 – increased throughput capacity with completion 200 of Laguna Seca Debottlenecking project 150 100 • Reversal of

  22. Slide 22: High return, rapid payback projects underpin significant momentum

    High return, rapid payback projects underpin significant g momentum in the business • Escondida Ore Access completed in the Escondida forecast copper production1 June 2012 qquarter, p providing g access to high g (index, FY12=100) grade ore (over 1% copper head grade) 150 • Laguna Seca debottlenecki

  23. Slide 23: Escondida Ore Access project provides access to higher grade ore

    Escondida Ore Access project provides access to higher g grade g ore • Escondida Ore Access project on time and Crusher relocation on budget g – investment of US$554 million (100% basis) • Project relocated the two existing in-pit in pit crushing stations (2 and 3) to a location outside of the curre

  24. Slide 24: Laguna Seca Debottlenecking project delivers increased throughput

    Laguna Seca Debottlenecking project delivers increased throughput g p and improved p recoveries • Laguna Seca Debottlenecking project Laguna Seca increases throughput g p by y 15 ktpd p and improves overall recoveries – completed on time and on budget – investment of US$300 million (100% bbasis) i )

  25. Slide 25: OGP1 generates strong returns

    OGP1 generates strong returns • Construction of a 152 ktpd concentrator to OGP1 – setting a new benchmark for the industry replace Los Colorados Concentrator (LCC) and d provide id early l access tto hi high h ore grade d – on track and on schedule – investment of US$3.8 billion (100% basis) – commi

  26. Slide 26: Extending the life of our leaching operations

    Extending the life of our leaching operations Escondida Bio Leach Pad Extension III Sulphide leach pad • Provides P id additional dditi l strips t i ((pad d surface f area), ) equipment and new facilities to sustain production of the sulphide leach plant • Investment In estment of US$354 million (10

  27. Slide 27: Infrastructure projects to enable Escondida's growth plan

    Infrastructure projects to enable Escondida’s growth plan g p Escondida Water Supply Antofagasta • Expansion E i off th the currentt desalination d li ti plant l t tto meet Escondida’s future water demands New Facilities Mine Maintenance • Construction of a replacement maintenance facility to allow

  28. Slide 28: A highly successful exploration program has delivered a substantial increase in resource base

    A highly successful exploration program has delivered a substantial increase in resource base • High quality resource base with 21.7 bt @ 0.54% copper1 B • Substantial increase in Escondida mineral district resources including: g Escondida 1 Zaldivar – 11% increase in resources from 30 June 2011 Nor

  29. Slide 29: Substantial future growth potential

    Substantial future growth potential • Significant copper resource base Escondida – providing +100 years of production1 – multiple plant expansion opportunities • Longer term growth will require investment in additional throughput thro ghp t capacity capacit – enabling technology studies underway • S

  30. Slide 30: Enabling long term growth by applying technological solutions to key constraints

    Enabling long term growth by applying technological g solutions to key y constraints Growth • Intensity and costs of • Intensity and costs of • Complexity of constraint mining operations processing future low operations grade, harder ores Technology T h l • Bulk B lk material i lhhandling dli • Sele

  31. Slide 31: Key themes

    Key themes • A well established, experienced and diverse management team • Leading industry HSEC performance • Operation is performing well following temporary challenges in FY12 • The release of latent capacity will deliver material unit cost savings • Low risk, high return growth projects will sus

  32. Slide 32: BHP Billiton: resourcing the future

    él ohpbilliton resourcing the future

BHP Billiton — Technical Presentation (October 2012) on 6ix