Argenta Silver Corp · TSXV:AGAG

Argenta Silver — Investor Presentation (June 2025)

24 slides from Argenta Silver's investor presentation, June 2025

  1. Slide 1: A New Force in Silver's Future: El Quevar Project

    A New Force in Silver’s Future El Quevar Project TSX.V: AGAG argentasilver.com JUNE 2025

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation may contain forward-looking statements that are not historical facts. Forward Looking Information includes, but is not limited to, disclosure regarding possible events, conditions or financial performance that is based on assumptions about future economic

  3. Slide 3: The Right Silver Opportunity

    The Right Silver Opportunity For 40 years, I’ve dreamed of building a pure silver company in Latin America. Exceptional pure silver assets are incredibly rare, and when the El Quevar opportunity presented itself, I knew instantly—this is it. We have a clear vision to scale this into a much larger co

  4. Slide 4: Investment Overview

    Investment Overview High-Grade, Low-Tonnage Attractive Valuation & Acquisition Expansion and Mineralization at a Fraction of Value Growth Potential Small-scale discoveries can significantly Post-deal market cap of ~C$25M with Positioned for growth in a rising silver boost resources, supported by a s

  5. Slide 5: Latin America silver deposits: message from the CEO

    Latin America is home to some of the most significant silver deposits on the planet, a legacy from nature, forged by extraordinary, powerful, and enduring geo- logical events that shaped the region millions of years ago, leaving behind an enormous wealth of untapped silver for the future. Our work n

  6. Slide 6: Salta: Latin-America's Premier Mining Region

    Salta: Latin- America’s Premier El Quevar Mining Region Located in Salta Argentina, most pro-mining province in the country. Major companies working in the province, including Rio Tinto, First Quantum, Aldebaran, AbraSilver, and Fortuna Mining. Circa 35 registered projects, mostly lithium, followed

  7. Slide 7: Accessible For New Discoveries

    Solar Farm Solar Farm Salta Accessible For Camp New Discoveries • Pocitos • Land package of 57,000 hectares. • Located along a major continental structural corridor, home to giant mines like El Abra and Chuquicamata. • Year-round accessibility with all-vehicle road access. • Close to the community o

  8. Slide 8: El Quevar Project

    El Quevar Project High-grade, low-tonnage, pure silver play Mineral Resource Estimate (2024)(1) Category Tonnage (Mt) Silver Grade (g/t) Metal Cont. (Moz Ag) Indicated 2.93 482 45.3 Inferred 0.31 417 4.1 Unlocked expansion potential due to previous lack of funding and mismanagement. (1) Source: Refe

  9. Slide 9: High-grade, Low-tonnage Silver: Visual Scale

    High-grade, El Quevar Indicated Resource 2.93 Mt containing 45.3 Moz of silver at 482 g/t Ag. 1 Low-tonnage Silver (1) Source: Refer to NI43-101 technical report with effective date of September 30, 2024, titled “NI 43-101 Technical Report on the Mineral Resource Estimate of the El Quevar Project Sa

  10. Slide 10: Past Drilling Success, New Multiple Targets

    N Consistent multiple high-grade intercepts El Quevar claim Past Drilling Success, New Multiple Targets Highlighting Exceptional, High-Grade Results TSX.V: AGAG argentasilver.com 10

  11. Slide 11: Untapped Potential

    Untapped Historical soil information showing regional untapped potential for Silver and Potential Gold, evidence of a much larger system. TSX.V: AGAG

  12. Slide 12: Unfollowed Added Value: Gold Results

    N Gold intercepts in deeper drillholes El Quevar claim Unfollowed Added Value Gold Results Additional to Silver Intercepts in Historical Drilling Related to the Mineral Resource Estimate Area TSX.V: AGAG argentasilver.com 12

  13. Slide 13: Infrastructure for Success

    Infrastructure Internal for Success Ready-to-use camp for 100 workers. Over 60kms of internal roads (high construction cost). Over 400 drillholes (100,000 meters drilled). 1,250-meter underground decline ramp. Multiple onsite generators. Core logging facilities. Multiple buildings, warehouses, fuel

  14. Slide 14: Fully Operational Site

    [real aerial picture] Fully Operational Site Access Road Provincial Road 100-people ready-to-use camp. High quality, high-cost infrastructure. Completely equipped. Kitchen Waste-water plant Dinner Nursery Core yard Cold storages Access gate Offices Sleeping area Laundry Power Generation Area Core lo

  15. Slide 15: Exploration Plan

    Exploration Plan Season 2024 - 2025 PHASE 1 PHASE 2 -Camp reconditioning. -Internal roads rehabilitation. -Drilling targets from Phase 1. -Historical database compilation. ~4,000 meters distributed in: -Re-log of historical drillcore. • 15% Confirmation drilling -Targeted surface sampling program. •

  16. Slide 16: Company Timeline

    Company Timeline Sept to Oct 2024 Nov to Dec 2024 Jan to Aug 2025 Expected Opportunity Key personnel hired. Phase 1 started 03-JAN- Resource expansion and identification. 2025: 23,000mts of Exploration drilling based Restructuration and historical core re-logged. on results from combined Non-Brokere

  17. Slide 17: Local Support & Diversity

    Local Support & Positive engagement with Diversity Indigenous and Government leaders in Salta Province. 90% of contracted services are from Salta. 80% of our workforce is from Salta. >45% of our workforce is from Local Communities. 4-to-6 ratio of women/men “Argenta is our example for mining compani

  18. Slide 18: Leadership

    Leadership Management, Advisors, & Directors Joaquin Marias Aaron Triplett Vanessa Bogaert President, CEO Chief Financial VP Investor Relations & Director Officer & Communications Michelle Borthwick Diego Mendilaharzu Guillermo Peralta Willem Middelkoop VP Corporate Affairs & Argentina Legal Rep. &

  19. Slide 19: Capital Share Structure

    19,013,000 Capital Share TSX.V: AGAG OTCQB: AGAGF FRA: T1K Structure ~C$ 50M Market Capitalization at share price of C$ 0.28 13.5% Issued & Outstanding Frank Giustra Common Shares 196,169,377 Stock Options 19,013,000 12.7% IFIS LTD.* Warrants 14,845,000 54.8% Fully Diluted 230,027,377 Retail C$11 Mi

  20. Slide 20: Argentina is Open for Business

    Argentina is Open for Business Under President Javier Milei, Argentina is attracting foreign direct investment after years of market isolation. Strengthened institutions have positioned Argentina as a key opportunity in South America. New regulations supporting natural resource industries, and inves

  21. Slide 21: Silver Today for Tomorrow

    Silver Today for Tomorrow Silver demand is rising, boosting price performance. Strong demand from the photovoltaic industry. Immediate need for next-gen silver batteries. Prices climbing due to geopolitical concerns. Silver remains undervalued compared to gold. Argentina’s Silver Exports 835.5 Milli

  22. Slide 22: Top Tier Silver Asset

    Top Tier Stock listed on TSX.V: AGAG Silver Asset Third-largest undeveloped single silver resource in Argentina. 92% of the Mineral Resource Estimate is in Indicated category. Upside potential for resource expansion and optimization. Pure silver play, with exceptional high grade. El Quevar Indicated

  23. Slide 23: Reasons to Invest in Argenta Silver

    Reasons to Invest in Argenta Silver Growth Potential Promising Exploration Upside Ground-level Valuation Proven Track Record Significant Silver Resource Timing Backed by the Fiore Group, led by renowned El Quevar boasts 45.3 Moz of silver at 482 g/t Positioned to capitalize on rising metals prices,

  24. Slide 24: El Quevar Project: Contact

    A New Force in Silver’s Future El Quevar Project For further information, please contact: Joaquín Marias Vanessa Bogaert President, CEO and Director – Argenta Silver VP Investor Relations and Communications – Argenta Silver jm@argentasilver.com | +1 778 3192415 vb@argentasilver.com | +1 604 7217773

Argenta Silver — Investor Presentation (June 2025) on 6ix