Mondelez International, Inc. · NASDAQ:MDLZ

Mondelez International — Technical Presentation (2025)

20 slides from Mondelez International's technical presentation, Sep 23, 2025

  1. Slide 1: Welcome to the Hold & Release Capability Session

    WELCOME TO THE HOLD & RELEASE CAPABILITY SESSION Mondelez International Public

  2. Slide 2: Please pay attention to our instructions

    PLEASE PAY ATTENTION IN OUR INSTRUCTIONS Grab your cellphone This session is recorded and posted into MDLZ website We might answer your question privately if there Is something confidential involved Have a nice Please fill the survey. Link will be shared in the Q&A You can turn on subtitles (we have

  3. Slide 3: Moderator and presenter for today's training

    MODERATOR FOR TODAY’S TRAINING Nathalia Galliano Supplier Quality Manager Mondelēz Global Supplier Quality São Paulo, Brazil Today’s Presenter Tamiris Fonseca Plant Quality Manager Curitiba Plant, BU BRAZIL Curitiba, Brazil MDLZ Curitiba is the second-largest plant in the world within the MDLZ sites

  4. Slide 4: Mondelez International Public

    6 Mondelez International Public

  5. Slide 5: What is included on this program?

    WHAT IS IT INCLUDED ON THIS PROGRAM? RAW Materials Records of: Packaging Materials Quantities Code dates labels Batch numbers Semi-finished products Product numbers Reason for hold/release finished products Investigative information Disposition Rework traceability Materials and products pending test

  6. Slide 6: Session 8.4

    Tough requirements complied by Curitiba plant will come to your screen! Because they are Internal Manufacturers, they must follow more restrictive requirements Important allerts will appear in our slides with these watch outs! In case you have questions about it, it is highly recommended to read Sup

  7. Slide 7: Importance of a robust hold and release program

    IMPORTANCE OF A ROBUST HOLD AND RELEASE PROGRAM Protecting Product Quality and Mitigating Risks and Costs safeguarding Consumers and Safety Brand Integrity It minimizes the risk of costly The core function of the Hold recalls and reputational damage The ultimate goal of the and Release program is by

  8. Slide 8: Training objectives

    TRAINING OBJECTIVES Understand mdlz hold and release program Understand how to properly identify products requiring hold Understand how to execute the program How to implement continuous improvement in the process 10 Mondelez International Public

  9. Slide 9: Definitions

    DEFINITIONS The process of segregating and controlling materials (raw materials, packaging, work-in-progress, or finished goods) that hold potentially do not meet required quality, safety, or regulatory standards. release The formal authorization to use, process, or ship materials that were previous

  10. Slide 10: Stages of hold

    STAGES OF HOLD First: Comunication Communicate all involded areas: manufacturing, Second: inventory quality, logistic Initial quantity of product, SIXTH: Disposition material, ingredient on hold It consists of ensuring the final disposal, according to the decision of use or destination, for example:

  11. Slide 11: Classification of hold

    CLASSIFICATION OF HOLD A lot of NCs related SQE requires minimally 2 different types of hold by severity Level 1: Food safety or regulatory issues Level 2: Quality issues You can have more levels if you need Hold 1 Hold 2 Hold 3 CONFIRMED food safety problem or high POTENCIAL food safety, regulatory

  12. Slide 12: Important difference between Hold 1 and 2 for suppliers

    IMPORTANT DIFFERENCE BETWEEN HOLD 1 AND 2 FOR SUPPLIERS Hold 1 Hold 2 All affected product or material shall be - Each shipping unit of product or visually identified as being on hold within its material shall be visually identified with storage location (e.g., segregation of an hold stickers, tags

  13. Slide 13: How a Hold 1 works

    HOW A HOLD 1 WORKS First moment: the special situation is identified, classified as Hold I. STEP’S RESPONSABILITYS cOMMENTS Communication: corporate quality and manufacturing are warned, and production communication quality activities are stopped. Inventory: after the retention request, made by the

  14. Slide 14: Here is an example of Hold 1 process

    HERE IS AN EXEMPLE OF HOLD 1 PROCESS communication Inventory Segregation disposal Considering the decision for the involved batch was destruction, it is necessary to monitor the entire process until the product's Initial Hold notification is communicated via a The hold is communicated via email to a

  15. Slide 15: How a Hold 2 works

    HOW A HOLD 2 WORKS For Internal Manufacturers Hold 2 includes regulatory issues and Hold 3 is about quality First moment: the special situation is identified, classified as Hold issues. For II. Suppliers Hold 2 is already connected with quality issues only STEP’S RESPONSABILITYS cOMMENTS Communicati

  16. Slide 16: Defining a robust process

    DEFINING A ROBUST PROCESS Best practices that ensure a robust hold and release program GOOD PRACTICES standard operating procedure training of all areas DEFINE GOVERNANCE FOR THE Health check of the program involved in the SOP HOLD AND RELEASE PROGRAM Develop a comprehensive procedure for the hold C

  17. Slide 17: Governance example

    GOVERNANCE EXAMPLE Governance over the management of the hold program must be robust and provide relevant information for future evaluation, such as trend analysis. database Power bi Action plans (solvace) DATAbASE THE iNFORMATiON’S: DASHbOARD THE quAliTY iNFORMATiON’S Corrective action and preventi

  18. Slide 18: Continuous improvement in the process

    CONTINUOUS IMPROVEMENT IN THE PROCESS A systematic evaluation/ audit of the hold and release program shall be conducted at least annually at each site to assure the system functions properly. This audit and the follow up and close out of MONITORING relevantLOSS ERRADICATION identified corrective act

  19. Slide 19: To suppliers

    Personnel shall be designated with the authority and responsibility for management of hold and release programs Where product or material placed on holds needs to be moved to external storage or between facilities, procedures shall be in place to maintain the integrity of the hold TO SUPPLIERS After

  20. Slide 20: Thank you!

    THANK Please, don’t forget to fill our survey You know it is important for all of us ;) YOU! 26 Mondelez International Public

Mondelez International — Technical Presentation (2025) on 6ix