Capitaland India Trust · SGX:CY6U

Capitaland India Trust — H1 2025 Earnings Presentation

43 slides from Capitaland India Trust's earnings presentation, Jul 30, 2025

  1. Slide 1: 1H FY 2025 Financial Results

    CapitaLand India Trust 1H FY 2025 Financial Results 30 July 2025 31

  2. Slide 2: Disclaimer

    Disclaimer This presentation may contain forward-looking statements. Actual future performance, outcomes and results may differ materially from those expressed in forward- looking statements as a result of a number of risks, uncertainties and assumptions. Representative examples of these factors inc

  3. Slide 3: Contents

    Contents 04 14 Highlights Operational Review 07 21 Financial Review Growth Strategy 11 24 Capital Management Appendix aVance II, Pune 33

  4. Slide 4: 1H FY 2025 Highlights

    1H FY 2025 Highlights International Tech Park Bangalore 34

  5. Slide 5: Strong Growth in 1H FY 2025

    Strong Growth in 1H FY 2025 Portfolio Highlights • Income contribution from newly completed developments, MTB 6 at International Tech Park Bangalore and CyberVale 1H FY 2025 NPI 1H FY 2025 DPU NAV/Unit Free Trade Warehousing Zone which are fully leased S$113.6m 3.97 S$1.29 • Announced proposed acqui

  6. Slide 6: Driving Growth

    Driving Growth Leverage India’s Economic Growth1 CLINT’s Growth Levers ~7% 4 Recycle Capital GDP growth forecast • Potential divestment of 33% stake in the data centre portfolio to unlock value, in 2025 and 2026 deleverage and reduce capital expenditure • Potential buyers have commenced due diligenc

  7. Slide 7: Financial Review

    Financial Review MTB 6, International Tech Park Bangalore 37

  8. Slide 8: 1H FY 2025 vs 1H FY 2024 Results

    1H FY 2025 vs 1H FY 2024 Results 1H FY 2025 1H FY 2024 Variance • Increase due to higher rental income from existing properties; S$/INR FX rate1 64.5 61.9 4% • Income contribution from newly completed developments (MTB 6 at ITPB and CyberVale INR9,625 million INR8,420 million 14% FTWZ); and Total Pr

  9. Slide 9: 1H FY 2025 vs 2H FY 2024 Results

    1H FY 2025 vs 2H FY 2024 Results 1H FY 2025 2H FY 2024 Variance • Increase due to higher rental income from existing S$/INR FX rate1 64.5 63.0 2% properties; and • Income contribution from newly completed INR9,625 million INR8,958 million 7% developments (MTB 6 at ITPB and CyberVale Total Property I

  10. Slide 10: CLINT’s 1H FY 2025 DPU Up 9%

    CLINT’s 1H FY 2025 DPU Up 9% Distribution per Unit (DPU) Distribution Period 1 January to 30 June 2025 (Singapore cents) Distribution Schedule 6.84 Notice of Record Date 30 July 2025 3.20 Last Day of Trading on ‘cum’ Basis 7 September 2025, 5.00 pm 2H Ex-Date 8 September 2025, 9.00 am 3.97 3.64 Reco

  11. Slide 11: Capital Management

    Capital Management Logistics Park, Navi Mumbai 3 11

  12. Slide 12: Well-spread Debt Maturity Profile

    Well-spread Debt Maturity Profile Effective Average Term Sustainability- Hedging Ratio Borrowings1 to Maturity Linked Loans INR: 54.2% S$1,898 million 2.5 years 59% SGD: 45.8% S$ million FY 2025 refinancing largely completed 411.2 328.9 327.7 305.9 256.6 267.6 93.1 31.5 180.9 68.1 27.6 220.9 176.7 1

  13. Slide 13: Proactive Capital Management

    Proactive Capital Management Financial Indicators As at 30 June 2025 (unless otherwise stated) Pro Forma Gearing in July 2025 including issuance of perpetual securities1 40.1% Gearing Ratio 42.3%2 Interest Coverage Ratio (ICR) 2.5x ICR Sensitivity3 (i) 10% decrease in EBITDA 2.3x (ii) 100 bps increa

  14. Slide 14: Operational Review

    Operational Review Block A, International Tech Park Hyderabad

  15. Slide 15: Diversified Portfolio

    Diversified Portfolio Mumbai Mumbai 8% 8% Hyderabad Bangalore Chennai 28% 31% Chennai 18% 17% Customer Base Total Number of Tenants: 329 Portfolio Average Space per Tenant: ~59,000 sq ft breakdown by base rent Pune Largest tenant accounts for Pune 19% Bangalore 19% 27% 12% of portfolio base rent Hyd

  16. Slide 16: Diversified Tenant Base

    Diversified Tenant Base Breakdown of tenant core business and country of origin by base rent Others 8% Others Retail and F&B 13% Telecom 1% 2% Singapore Healthcare 2% 4% Banking & Financial Services France 5% 6% Automobile Technology & USA 6% Tenant Core Software Development Country of 45% Business

  17. Slide 17: Quality Tenants

    Quality Tenants Top 10 Tenants % of Portfolio Base Rent Asset Class 1 Tata Consultancy Services 12% 2 Applied Materials 8% 3 Infosys 4% 4 Amazon 3% IT Park 5 Renault Nissan 3% 6 Synechron 3% 7 UnitedHealth Group 2% 8 Pegatron 2% Industrial 9 Bristol Myers Squibb 2% IT Park 10 Société Générale 2% Tot

  18. Slide 18: Portfolio Occupancy

    Portfolio Occupancy1 Committed Occupancy 92% (including options and ROFR) 90% (excluding options and ROFR) Bangalore Chennai Hyderabad Mumbai Pune 95% 96% 100% 99% 100% 96% 93% 92% 91% 82% 84% 88% 73% 54% ITPB ITPC CyberVale IF, MWC ITPH aVance CyberPearl Building Building aVance I, ITPP-H aVance II

  19. Slide 19: Lease Expiry Profile

    Lease Expiry Profile Weighted Average Lease Term Weighted Average Lease Expiry 6.6 years 3.7 years Monthly base rent expiring (INR million) 600 43% 500 >70% of remaining leases expiring in 400 2025 are either renewed or highly 300 likely to be renewed 22% 18% 200 13% 100 4% 0 2025 2026 2027 2028 202

  20. Slide 20: Portfolio Rental Reversion

    Portfolio Rental Reversion Maintained Positive Rental Reversion +9% 18% 12% 10% Signing of large leases with rent-free periods -3% Bangalore Chennai Hyderabad City Bangalore Chennai Hyderabad Pune Total No. of eligible transactions 42 12 9 9 72 SBA (sq ft) 500,000 470,000 180,000 480,000 1,630,000 N

  21. Slide 21: Growth Strategy

    Growth Strategy Artist Impression of CapitaLand Data Centre, Chennai 3 21

  22. Slide 22: Growth based on Committed Pipeline

    Growth based on Floor area (million sq ft) Committed Pipeline 35.0 33.3 0.9 2.4 30.0 47% 7.3 25.0 Portfolio 22.7 Forward Purchases 20.0 Data Centre Developments 15.0 IT Building Developments 22.7 22.7 10.0 5.0 0.0 Jun 2025 Committed Pipeline 3 22 C a p i t a L a n d I n d i a Tr u s t 1H FY 2025 Fin

  23. Slide 23: The End

    The End For enquiries, please contact: CapitaLand India Trust Management Pte. Ltd. Office: (65) 6713 2888 Email: enquiries@clint.com.sg Website: www.clint.com.sg Gardencity, Bangalore 3 23

  24. Slide 24: Appendix – Glossary

    Appendix Glossary CY : Calendar year Derivative financial : Includes cross currency swaps (entered to hedge S$ borrowings into INR), interest rate swaps, options and forward foreign instruments exchange contracts DPU : Distribution per unit EBITDA : Earnings before interest expense, tax, depreciatio

  25. Slide 25: Good Growth Track Record

    Good Growth Portfolio size increased by more than 5 times since IPO Track Record Floor area (million sq ft) 11% CAGR 22.7 21.9 0.8 2.3 19.6 Total Developments 2.7 7.8 million sq ft 15.5 1.4 15.0 0.7 13.8 1.2 13.1 12.6 0.7 Total 3rd Party acquisitions 12.0 0.6 0.5 8.6 million sq ft 1.9 21.9 9.7 0.4 1

  26. Slide 26: Increasing Distribution per Unit

    Increasing Distribution per Unit 10-year CAGR1 INR DPU: +6% S$ DPU: +4% S$150 million Private Placement DPU1 (S cents) DPU1 (INR) S$150.1 million 5.0 10.0 Preferential Offering S$100 million 4.5 Private Placement 9.0 4.0 8.0 3.5 7.0 3.0 6.0 2.5 5.0 2.0 4.0 1.5 3.0 1.0 2.0 0.5 1.0 4.78 5.40 5.54 5.98

  27. Slide 27: Capital Management

    Capital Management Currency hedging strategy Funding strategy Balance sheet • The Trustee-Manager’s approach to equity raising is 50% use of Core CL Blue predicated on maintaining a strong balance sheet by keeping • Trustee-Manager does not hedge equity the Trust’s gearing ratio at an appropriate le

  28. Slide 28: Balance Sheet

    Balance Sheet As at 30 June 2025 INR S$ Total assets 295.6 billion 4,488.0 million Total borrowings 127.6 billion 1,937.5 million Deferred consideration1 1.8 billion 27.6 million Derivative financial instruments (4.4 billion) (67.2 million) Effective borrowings2 125.0 billion 1,897.9 million Long te

  29. Slide 29: Macro Drivers Signal India’s Growth Potential

    Macro Drivers Signal India’s Growth Potential 1 Economic Growth 2 Infrastructure Growth India’s GDP is poised to grow by India’s commitment ~7% in 2025 and to invest in 2026. infrastructure will India is expected propel growth over to retain its position the coming years. as the fastest- growing maj

  30. Slide 30: Appendix – Portfolio Information

    Appendix – Portfolio Information Building Q1, Navi Mumbai 3 30

  31. Slide 31: World-class Assets

    World-class Assets City Bangalore Chennai Hyderabad Pune Mumbai • International Tech • CyberVale • aVance Hyderabad • aVance I, Pune • Building Q1 & Q2 Park Bangalore • Industrial Facility 1, 2 & 3, • CyberPearl • aVance II, Pune • Logistics Park Property MWC • International Tech • International Tec

  32. Slide 32: Lease Expiry Profile by Base Rent

    Lease Expiry Profile by Base Rent 2029 City 2025 2026 2027 2028 Total & beyond Bangalore 0.9% 9.0% 3.9% 2.4% 15.2% 31.4% Hyderabad 1.3% 1.5% 5.7% 10.0% 6.8% 25.3% Chennai 1.0% 2.2% 5.0% 3.4% 5.3% 16.9% Pune 0.3% 0.5% 1.2% 4.3% 12.6% 18.9% Mumbai 0.2% 0.2% 2.3% 1.9% 3.0% 7.6% Total 3.7% 13.4% 18.0% 2

  33. Slide 33: Lease Expiry Profile by Area

    Lease Expiry Profile by Area 2029 City 2025 2026 2027 2028 Total & beyond Bangalore 0.8% 8.8% 3.9% 2.3% 14.0% 29.8% Hyderabad 1.1% 1.3% 4.8% 9.1% 6.6% 22.9% Chennai 0.8% 2.1% 4.4% 4.1% 6.1% 17.5% Pune 0.3% 0.7% 1.2% 5.3% 14.8% 22.3% Mumbai 0.2% 0.2% 2.3% 1.7% 3.0% 7.4% Total 3.1% 13.1% 16.7% 22.5% 4

  34. Slide 34: Long Term Growth Strategy

    Long Term Growth Strategy DATA CENTRE DEVELOPMENTS 50 MW Data Centre (Tower 1) at Airoli, Navi Mumbai 55 MW Data Centre (Tower 2) at Airoli, Navi Mumbai 42 MW Data Centre at ITPH, Hyderabad 53 MW Data Centre at Ambattur, Chennai SPONSOR ASSETS 43 MW Data Centre at ITPB, Bangalore DEVELOPMENT PIPELIN

  35. Slide 35: Growth Pipeline

    Growth Pipeline aVance Casa Grande – aVance Business Hub 2 Gardencity Ebisu Total Hyderabad OneHub Maia Chennai aVance 5 aVance A1 aVance A2 Project I Project II Building 1 Phase 1, 2 & 3 Floor area 1.16 0.83 0.55 1.26 0.39 1.15 0.79 1.13 7.26 (million sq ft) Time of Construction 2H 2025 building Co

  36. Slide 36: Development: ITPB Pipeline

    Growth Strategy Development: ITPB Pipeline ITPL Metro Station Future Development Potential • Remaining development potential of 2.3 million sq ft MTB 6 • Site has been identified for development of a data centre MTB 7 & 8 • ITPB’s 40 Mega Volt Amperes (MVA) air Park Square insulated substation has b

  37. Slide 37: Development: ITPH redevelopment

    Growth Strategy Development: ITPH redevelopment Original Master Plan (1.3 million sq ft) Proposed Master Plan (4.9 million sq ft) MLCP Capella Vega Atria Phase I completed Phase I Orion Auditorium Auriga Mariner Data Centre Under Data Centre under construction Development under construction Redevelo

  38. Slide 38: IT Park: aVance Hyderabad

    Growth Strategy (Forward Purchase) IT Park: aVance Hyderabad Site Area 3 6 8 4 25.7 acres / 10.4 ha 2 7 5 1 9 Asset Ownership 10 CLINT Assets Vendor Assets Landowner Assets CLINT has ROFR to (7), (8), (9) & (10) aVance 5 Proposed acquisition of (5)1 – 1.16 million sq ft • Occupancy Certificate recei

  39. Slide 39: IT Park: aVance Business Hub 2, Hyderabad

    Growth Strategy (Forward Purchase) IT Park: aVance Business Hub 2, Hyderabad Site Area 14.4 acres / 5.8 ha Asset Ownership Vendor Assets Landowner Assets Proposed acquisition of (A1) to (A5)1: 4.75 million sq ft Construction Status Construction of A1 building is completed with landscaping works in p

  40. Slide 40: IT Park: Gardencity, Bangalore

    Growth Strategy (Forward Purchase) IT Park: Gardencity, Bangalore Location Hebbal, Bangalore Floor Area Project I: 1.3 million sq ft; Project II: 0.4 million sq ft Expected Completion Project I: 2H 2025 Project II: 2H 2027 Construction Status Construction of Project I at an advanced stage. 3 40 C a

  41. Slide 41: IT Park: Ebisu, Bangalore

    Growth Strategy (Forward Purchase) IT Park: Ebisu, Bangalore Location Building 1 Outer Ring Road, Bangalore Floor Area Building 1: 1.15 million sq ft Expected Completion 4Q 2026 Construction Status Basement works completed. Superstructure works in progress. Artist’s impression 3 41 C a p i t a L a n

  42. Slide 42: IT Park: Office Project at Nagawara, Bangalore

    Growth Strategy (Forward Purchase) IT Park: Office Project at Nagawara, Bangalore Location Outer Ring Road, Bangalore Floor Area 1.13 million sq ft Expected Completion 4Q 2028 Construction Status Pre-construction approvals being obtained Artist’s impression 3 42 C a p i t a L a n d I n d i a Tr u s

  43. Slide 43: Industrial: Casa Grande – OneHub, Chennai

    Growth Strategy (Forward Purchase) Industrial: Casa Grande – OneHub, Chennai Location OneHub, Chennai Floor Area Phase 1: 0.48 million sq ft Phase 2: 0.16 million sq ft Phase 3: 0.15 million sq ft Construction Status Phase 1: Construction underway OneHub Chennai 3 43 C a p i t a L a n d I n d i a Tr

CapitaLand India Trust — H1 2025 Earnings Presentation on 6ix