  1. Slide 1: Corporate Operational Presentation December 2021

    We strive to be a responsible, value driven and innovative PGM / Chrome business to the benefit of all stakeholders Corporate Operational Presentation December 2021 Values – Zero-Harm, Integrity, High performance, Low cost & Growth

  2. Slide 2: Bushveld Complex Properties

    Bushveld Complex Properties Values – Zero-Harm, Integrity, High performance, Low cost & Growth 2

  3. Slide 3: Experienced and Strong Team

    Experienced and Strong Team Directors Management Diana Hu Wylie Hui Chief Executive Officer Chief Financial Officer & Corporate & Director Secretary George G. Dorin Director, Board Chair, Corporate Andrea Zhang Governance and Compensation Chief Operating Officer Committee Chair Michael Cosic Hanneli

  4. Slide 4: Share Structure

    Share Structure Stock Symbol TSX: ELR / JSE: EPS Share Price at Dec 13/2021 C$0.28 52 week high/low C$0.57 / C$0.265 Issued and outstanding 137,820,773 Stock options outstanding 5,340,000 Warrants outstanding 5,960,000 Fully diluted 149,120,773 Market capitalization C$38.6M Values – Zero-Harm, Integ

  5. Slide 5: Overview – December 2021

    Overview – December 2021 • Crocodile River Mine (“CRM”) transformed from care and maintenance to revenue generating from the Retreatment Project (remining Zandfontein tailings area to recover chrome) in December 2018 • PGM Scavenger Plant - Circuit D and PGM Main Circuit B (collectively, the “PGM op

  6. Slide 6: Revenue and EBITDA

    Revenue and EBITDA Source: Company Reports Values – Zero-Harm, Integrity, High performance, Low cost & Growth 6

  7. Slide 7: Chrome and PGM Operations

    Chrome and PGM Operations Crocodile River Mine (Zandfontein and Crocette ore bodies, Tailings) • Retreatment Project – Remining Zandfontein tailings area to recover chrome • Chrome Recovery Plant was commissioned in December 2018 • Optimization project on-going into 2022 • PGM Scavenger Plant - Circ

  8. Slide 8: Zandfontein Overview Map

    Zandfontein Overview Map Values – Zero-Harm, Integrity, High performance, Low cost & Growth 8

  9. Slide 9: Zandfontein Tailings Storage Facility

    Zandfontein Tailings Storage Facility Return and Storm water Facilities Area B1 Current Deposition Area Area C – future mining area Area B2 Current Mining Area Deposition Dam Area A Values – Zero-Harm, Integrity, High performance, Low cost & Growth 9

  10. Slide 10: Zandfontein Plant and Equipment

    Zandfontein Plant and Equipment Values – Zero-Harm, Integrity, High performance, Low cost & Growth 10

  11. Slide 11: Retreatment Project - Resources

    Retreatment Project - Resources Mineral resource estimate of 13,680,000 tons at an average grade of 20.72% chromium oxide Tonnage 3E PGE Pt Pd Rh Au Cr2O3 3E PGE Au Cr2O3 Category (Mt) (g/t) (g/t) (g/t) (g/t) (g/t) (%) (Oz) (Oz) (Mt) Measured 12.489 1.225 0.747 0.309 0.170 0.008 20.85 494,003 3,179

  12. Slide 12: Retreatment Project

    Retreatment Project • The Retreatment Project is a proprietary operation in South Africa which includes a combined hydro and mechanical remining method, magnetic separation applied to produce chrome concentrates, thus obtaining superior yield results compared to traditional gravity technology. • The

  13. Slide 13: PGM Operation Summary

    PGM Operation Summary • During 2020, the Company completed the refurbishment of the small- scale PGM circuit (previously the scavenger plant circuit) (“PGM Circuit D”). • The Company began operating the PGM Circuit D in Q4 2020 (following the mandatory general lockdown imposed by the Government of S

  14. Slide 14: PGM Operation Summary (con't)

    PGM Operation Summary (con’t) • The Company worked to optimize Circuit D in Q1 2021 to obtain higher levels of operation consistency and product quality. The optimized circuit re-commissioned in late March. • During April, the first production month following Circuit D’s recommissioning, the Company

  15. Slide 15: Circuit B

    Circuit B Values – Zero-Harm, Integrity, High performance, Low cost & Growth 15

  16. Slide 16: Circuit D

    Circuit D 16

  17. Slide 17: Circuit D and B Production Data

    Circuit D and B Production Data Dispatched to Impala (Project to Date) PGM Ounces Month1 Wet Tons Dry Tons Contained Dec-20 32.06 23.24 51.19 Jan-21 61.50 43.53 105.34 Apr-21 371.74 199.82 523.59 May-21 302.08 163.48 278.03 Jun-21 386.58 175.66 310.74 Jul-21 500.92 218.06 439.89 Aug-21 273.58 147.76

  18. Slide 18: Operations Forecast

    Operations Forecast Crocodile River Mine – Zandfontein section Retreatment Project (re-mining the tailings storage facility (“TSF”) to produce chrome concentrates) • Purchase of the Chrome Retreatment Plant to be considered and assessed  the due date is 210 days after the date of issuing the commis

  19. Slide 19: Operations Forecast (con't)

    Operations Forecast (con’t) Crocodile River Mine – Zandfontein section (con’t) PGM Circuit D and PGM Circuit B (producing PGM concentrates from the tailings circuits following the above Retreatment Project) • PGM Circuit B commissioned in Oct 2021, to be followed by optimization in conjunction with

  20. Slide 20: CRM Zandfontein Underground

    CRM Zandfontein Underground • Mine Design completed with scope included: • Comparing all Mine Design scenarios and proposing the best option, taking in consideration safety, minimal ore dilution, and cost. • Designs on support and ventilation • Scheduling of currently available reserves from 3 to 5

  21. Slide 21: Updated Mine Design & Schedule for Zandfontein

    Updated Mine Design & Schedule for Zandfontein – 27 years of Mining (30m tons) Source: Company Reports Values – Zero-Harm, Integrity, High performance, Low cost & Growth 21

  22. Slide 22: Update on Maroelabult property sale

    Update on Maroelabult property sale • October 2019 - sale of the mining rights, immovable property, infrastructure and equipment • Consideration on closing: • $1,363,000 (ZAR 20 million) • Release of the rehabilitation obligation • Immediate transfer (November 2019) of the care and maintenance costs

  23. Slide 23: Other Projects in the Pipeline

    Other Projects in the Pipeline Mareesburg • Excellent opportunity to develop opencast mine • EA legal scan in process • The Company plans to continue work on an updated internal project assessment and then follow on with mine design study and technical review, environmental studies and amendments. S

  24. Slide 24: Notice

    Notice Page 1 of 2 The information contained in this Presentation is provided for informational purposes only and does not constitute an offer to sell, or the solicitation of an offer to buy securities. The information contained herein is not investment or financial product advice and has been prepa

  25. Slide 25: Notice

    Notice Page 2 of 2 This Presentation contains certain statements that may be “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws. Forward looking statements are statements that are not historical facts and are often, but not always, identifi

  26. Slide 26: Thank you

    We strive to be a responsible, value driven and innovative PGM / Chrome business to the benefit of all stakeholders Thank you Values – Zero-Harm, Integrity, High performance, Low cost & Growth

Eastern Platinum — Investor Presentation (December 2021) on 6ix