Elia Group SA/NV · EURONEXT:ELI

Elia Group SA/NV — Investor Presentation (December 2014)

32 slides from Elia Group SA/NV's investor presentation, Dec 10, 2014

  1. Slide 1: Expert Working Group

    Expert Working Group Dec 10th, 2014

  2. Slide 2: Agenda

    Agenda • Baselining (9:30-10:30) • SDR 2015 process for prequalification (10:30-11:30) • Planning submission offer to ELIA (11:30-12:00) Expert Working Group – 10/12/2014 2

  3. Slide 3: Agenda

    Agenda • Baselining (9:30-10:30) • SDR 2015 process for prequalification (10:30-11:30) • Planning submission offer to ELIA (11:30-12:00) Expert Working Group – 10/12/2014 3

  4. Slide 4: Introduction

    Intoduction Reminder • A baseline is an estimate of the electricity that would have been consumed/produced by a customer in the absence of a demand response event. effectively activated Event duration energy volume Consumption P [kW] Fixed shedding limit • The baseline is required at least for the c

  5. Slide 5: Baseline method

    Baseline method General  Calculation of the baseline is based on 1/4h-measured data coming from individual meter (headmeter @DSO-grid and submeter @Elia-grid).  For SDR, the demand response (DR) period is defined as the period between the ‘verification deadline’ and the notification of the end. Th

  6. Slide 6: Proposal of baseline method

    Proposal of baseline method Slide presented at Expert WG 17/11/2014 by Aggregators AMR = Automatic Meter Reading Expert Working Group – 10/12/2014 6

  7. Slide 7: Baseline method: High X of Y

    Baseline method High X of Y • Type of days  Weekday  Week-end day and holiday • Excluding days  Days on which a demand response event has occurred  Days on which a strategic reserve trigger (both economical and technical) has occurred  Non-representative days meaning days on which a specific ev

  8. Slide 8: Baseline method: High X of Y

    Baseline method High X of Y • Methodology The start of the event defines the type of the day. If the event occurs on a weekday, apply the methodology High 4 of 5 (average calculation):  Taking into account the excluding days, take the 5 most recent weekdays prior to the event day.  For each of the

  9. Slide 9: Baseline method: High X of Y example

    Baseline method High 4 of 5 – example Consumption [kW] 1 day [1/4h] Expert Working Group – 10/12/2014 9

  10. Slide 10: Baseline method: High X of Y

    Baseline method High X of Y • Methodology If the event occurs on a weekend day, apply the methodology High 2 of 3 just as described on the previous slide. Expert Working Group – 10/12/2014 10

  11. Slide 11: Baseline method: Adjustment

    Baseline method Adjustment • Adjustment (uncapped symmetric additive) The proposed adjustment is made on the measured data of the day, prior to the notification.  Calculate the average consumption over the 4 days on the period of 3 hours preceding the notification of the event.  Calculate the aver

  12. Slide 12: Baseline method: Adjustment example

    Baseline method Adjustment – example Consumption [kW] -1145 kW 1 day [1/4h] Expert Working Group – 10/12/2014 12

  13. Slide 13: Baseline method: Precision

    Baseline method Precision • Relative RMSE n baseline value − measured value 2 𝑅𝑀𝑆𝐸 = i=1 i i n RMSE 𝑅𝑒𝑙𝑎𝑡𝑖𝑣𝑒 𝑅𝑀𝑆𝐸 = n i=1 measured valuei n avec n = number of 1/4h corresponding to the DR period • Example : RRMSE = 3,4% Expert Working Group – 10/12/2014 13

  14. Slide 14: Baseline method: Example

    Baseline method Example (Saturday at the end of December) RRMSE = 15,5% Expert Working Group – 10/12/2014 14

  15. Slide 15: Agenda

    Agenda • Baselining (9:30-10:30) • SDR 2015 process for prequalification (10:30-11:30) • Planning submission offer to ELIA (11:30-12:00) Expert Working Group – 10/12/2014 15

  16. Slide 16: R3DP 2016 SDR DSO 2015-2016

    R3DP 2016 SDR DSO 2015-2016 Expert WG ELIA 10/12/2014

  17. Slide 17: Agenda

    Agenda SDR2015/2016 & R3DP2016  High level proces  Detailed description Questions & Answers - NETWORK FLEX STUDY  Why is this needed?  Why is there no NFS for the on/off campaign?  What is the process if an EAN is “colored red” after an NFS? - At the end:  Discussion on the overall process (ti

  18. Slide 18: High level process: DNO viewpoint

    SDR2015-2016 & R3DP2016: DNO viewpoint  High level proces Signing framework contract: DNB-FSP Customer Connection Contract Check Deadline tendering b c (Elia – Aggr.) Start product End product d a NFS Certification Update Data services Elia (SDR) pool FSP DNB - TNB (appendix) yy/yy/yyyy Deadline fo

  19. Slide 19: High level process: state of an EAN

    SDR2015-2016 & R3DP2016: EAN viewpoint  High level proces: state of an EAN * CCCC NFS ( cert )( ) Contr DS Access Customer Positive Flex register – Activation Register Contract Network Flex list of EANs register – Check Study combined with calculated flex product and per EAN (and FSP then aggregate

  20. Slide 20: Customer Connection Contract Check

    SDR2015-2016 & R3DP2016 Customer Connection Contract Check  Customer Connection Contract Check Customer Contract  What? Check • Summary of the connection contract  What not? • A way to change the connection contract  this is a business as usual process  How? • Automatically for customers who al

  21. Slide 21: NFS

    SDR2015-2016 & R3DP2016 NFS  NFS DNB - TNB Positive Network Flex Note: Check of customer contract is a prerequisite (needed to minimize the lead time) study  What? • Study to investigate possible problems with simultaneity • Independent of the product (R3DP or SDR) • Permission for an EAN to take

  22. Slide 22: Certification / Tendering / Contract

    SDR2015-2016 & R3DP2016 Certifi- Contract  Certification / Tendering / Contract cation Flex register – list of  Certification EANs combined with • Elia task (cfr. Taskforce iSR) only in case for the pool of EANs that wants to take part in Strategic Reserves product and FSP  Tendering • Elia task

  23. Slide 23: Data services

    SDR2015-2016 & R3DP2016 Data  Data services services Activation register – Note: only for EANs present in the flex register calculated flex per  What? EAN (and then aggregated to • Data services are only delivered to Elia (and others if necessary) on metering data requestor) that is present in our

  24. Slide 24: Agenda

    Agenda SDR2015/2016 & R3DP2016  High level proces  Detailed description Questions & Answers - NETWORK FLEX STUDY  Why is this needed?  Why is there no NFS for the on/off campaign?  What is the process if an EAN is “colored red” after an NFS? 24 Expert Working Group – 10/12/2014

  25. Slide 25: Questions & Answers – search for solutions

    Questions & Answers – search for solutions NETWORK FLEX STUDY  Why is this needed? The NFS is performed in order to avoid two kind of problems related to simultaneity:  Congestion caused by local production units because of simultaneous reduction of local load. o Considering the fact that for SDR

  26. Slide 26: Questions & Answers – search for solutions

    Questions & Answers – search for solutions NETWORK FLEX STUDY  Why is there no NFS for the on/off campaign?  Indeed the on/off campaign is a possible risk for the operational security, but:  This is not comparable, because there is no “one moment” of activation.  Furthermore, focusses at low vol

  27. Slide 27: Questions & Answers – search for solutions

    Questions & Answers – search for solutions NETWORK FLEX STUDY  What is the process if an EAN is “colored red” after an NFS?  DNOs will give full motivation on the reasons why an EAN is colored red  Whenever possible, we will more strictly define the time windows where problems could occur.  pres

  28. Slide 28: Thank you for your attention

    Thank you for your attention 28 Expert Working Group – 10/12/2014

  29. Slide 29: Agenda

    Agenda • Baselining (9:30-10:30) • SDR 2015 process for prequalification (10:30-11:30) • Planning submission offer to ELIA (11:30-12:00) 29 Expert Working Group – 10/12/2014

  30. Slide 30: Customer Contract Check

    deadli certifi reque Customer result to ELIA Contract Customer Check Contract request Check dead to DSO by DSO NFS- reque to DS Customer result Contract Customer deadline result deadline outcome Check Contract NFS-request NFS-request certification certification request Check to DSO by DSO request by

  31. Slide 31: Planning (to be confirmed at next TFiSR)

    Planning (to be confirmed at next TFiSR) 15/4/2015 • a = CCC process • b = NFS process • c = ELIA certification process • d = offer preparation time for candidates Deadline submission offer to ELIA … Sun 22/2/2015 Fri 13/3/2015 Mon 16/3/2015 Mon 30/3/2015 Wed 1/4/2015 Fri 10/4/2015 15/4/2015 31 Expe

  32. Slide 32: Thanks for your attention.

    Thanks for your attention. Expert Working Group – 10/12/2014 32