  1. Slide 1: Avalon Minerals Ltd. Investor Presentation

    AVALON MINERALS Ltd. Investor Presentation Copper in Sweden - Near Term Development - Growth January 2015

  2. Slide 2: Avalon Minerals – Disclaimer

    Avalon Minerals – Disclaimer Forward-looking Statements This Presentation includes certain statements that may be deemed “forward-looking statements”. All statements in this Presentation, other than statements of historical facts, that address future activities and events or developments that Avalon

  3. Slide 3: Avalon Minerals – At a Glance

    Avalon Minerals – At a Glance Ticker ASX:AVI Top 10 shareholders hold 63% of shares on issue Share Price (30 day VWAP)* $0.025 Board and management hold 2% Shares on Issue 144,735,608 Market Cap $3.62 mill Substantial shareholders Cash (31 Dec 2014) $1,802,000 NAME % 52 week trading $0.02 - $0.15 Ta

  4. Slide 4: Viscaria Project – At a Glance

    Viscaria Project – At a Glance  A COPPER Project:  Scoping study in progress and assessing copper-only start up – targeting lower CAPEX and higher grade  Viscaria copper-magnetite project is a robust development scenario based on a 2014 updated Scoping Study, but weakness in iron price dictates a

  5. Slide 5: Viscaria Project – At a Glance

    Viscaria Project – At a Glance As a • high grade, • low CAPEX, • copper only project, with a staged development plan • with existing high quality infrastructure • exploration upside Avalon Minerals is considered to be heavily discounted relative to its peers (See slide 22 for comparables) 5

  6. Slide 6: Viscaria Project – Location

    Viscaria Project – Location Viscaria Project N 1 km Fe Mine and processing Cu Smelter Cu Refinery Cu Mine 6

  7. Slide 7: Existing Infrastructure

    Avalon Minerals – Existing Infrastructure  Town (Kiruna, pop. 20,000; skilled workforce)  Sealed national highway to mine gate  Electrified rail (Public Access) to mine gate  Power (Low Cost; ~8c/kWh) and abundant supply  Contractors and OEM presence in Kiruna  >100 year mining heritage  Loca

  8. Slide 8: Resource Estimate Summary

    Viscaria Project – Resource Estimate Summary OVERALL RESOURCE 2014 SCOPING STUDY OPEN PIT RESOURCE* *Represents the portion of the resource captured in open pit shells Cu Fe 32 Mt @ 0.7% Cu 16% Measured 64Mt @ 35Mt @ 51% Indicated 1.05% 29.8% & 23% Fe1 33% Inferred - See Cautionary Statement pg 35 6

  9. Slide 9: 2015 Scoping Study

    Viscaria Project – 2015 Scoping Study Robust 2014 Scoping Study, but …… Maximising shareholder return and weakness in the Fe price dictates review of other options Now optimising project to deliver • Lower CAPEX (~$100 mill) • Higher grade, copper only start-up (range of grades 1.2 – 2.5% Cu) • Shor

  10. Slide 10: Opportunities being investigated

    Viscaria Project – Opportunities being investigated • High grade copper only opportunities exist at A Zone, B Zone and D Zone • Current timetable has a potential decision to build in 2017 • At A Zone grades in excess of 1.25% Cu in opencut positions (for example see slide 34) and in excess of 2.5% i

  11. Slide 11: A Zone long section

    Viscaria Project – A Zone long section High grade copper targets defined down plunge across several areas at A Zone X-section Proposed drill holes, ~4,000m Previously mined by Outokumpu – 15 years of production to 1997 – 12.5Mt of 2.3% Cu at 850,000tpa, producing a concentrate of 26% Cu, 2% Zn & 0.5

  12. Slide 12: A Zone – FW and HW copper zones defined

    Viscaria Project – A Zone – FW and HW copper zones defined Drill hole VDD0182 completed in December 2014 A Zone HW • To assess the A Zone footwall mineralisation mineralisation • to assess the main A Zone orebody  Positive results Original A Zone open pit  Potential increase in open pit mineral A

  13. Slide 13: D Zone high grade copper sulphide potential

    Viscaria Project – D Zone high grade copper sulphide potential Proposed drill holes, ~4,500m 13

  14. Slide 14: D Zone copper oxide potential

    Viscaria Project – D Zone copper oxide potential Oxide copper target zone; drilling Q1, 2015 Oxide Oxide Sulphide Sulphide Recently announced copper oxide results VDD0180 – 5.6m @ 1.6% Cu within 15.5m @ 0.7% Cu VDD0181 – 24m @ 0.4% Cu above main target zone (hole abandoned in target zone) Order of M

  15. Slide 15: Metallurgy

    Viscaria Project – Metallurgy • 12 year mining history delivered good quality concentrates • High quality products • Low technical risk • Independent review completed (Ausenco) Copper • D Zone copper sulphide mineralisation is chalcopyrite and produces a concentrate with 26% copper and 94% copper re

  16. Slide 16: Copper Price Forecasts

    Viscaria Project – Copper Price Forecasts Avalon is targeting production at a higher copper price environment, forecast for post 2017 Source: Glencore Investor Day, December 2014 16

  17. Slide 17: Copper Price Forecasts

    Viscaria Project – Copper Price Forecasts Forecast consensus … Forecast expansions and new supply will not materialise as planned Supply deficit from 2017 Healthy demand from China and US “The year which is likely to see the heaviest volume of oversupply is 2016, at which time we expect a surplus of

  18. Slide 18: The Pipeline – opportunities being investigated

    Viscaria Project – The Pipeline – opportunities being investigated Scale Source Products A Zone Open Pit (1.25% Cu) Cu in concentrate ~1 mtpa A Zone Underground (>2.5% Cu) Cu in concentrate D Zone Underground (>1.7% Cu) Cu in concentrate D Zone Copper Oxide Cu cathode Expansion D Zone Open Pit Cu +

  19. Slide 19: Belt Scale Exploration Upside

    Viscaria Project – Belt Scale Exploration Upside Several targets Iso Gruvavaara  Historic workings  Rock chips up to 1g/t Au and 0.9% Cu West Nukutus  Magnetic anomaly of similar magnitude and scale to D Zone  The closest historic drill hole (150m to the east) intersected up to 0.3% Cu and 0.5g/

  20. Slide 20: Belt Scale Exploration Upside

    Viscaria Project – Belt Scale Exploration Upside Nihka Target • Similar style to D Zone mag anomaly • But larger, and greater depth extent • No previous drilling • Q1 drill test 20

  21. Slide 21: Regional Scale Exploration

    Viscaria Project – Regional Scale Exploration Tjavelk Targets Several conductors and magnetic anomalies Previous exploration returned Cu + Au anomalies Recent geophysical modelling completed Drill targets defined Tjarro Target Previous drilling 15m @ 1.3% Cu 34m @ 0.6% Cu & 0.4g/t Au 11m @ 0.4% Cu &

  22. Slide 22: Peer Group Comparison

    Viscaria Project – Peer Group Comparison  LOW Capital Intensity, forecast at 7,500 $/t Viscaria  LOW Cost/lb copper production, <$2/lb forecast for copper only project × LOW Valuation - EV/Resource lb of Copper, very low at <1c/lb share price EV/lb Cu in Capital Company Code (A$) shares on issue C

  23. Slide 23: Stakeholder Management

    Viscaria Project – Stakeholder Management • Proposed development areas are in windows surrounded by multiple land use areas • The key issues are (1) a strong mining heritage, (2) reindeer herding, (3) Natura 2000, and (4) recreation 23

  24. Slide 24: Planning to Deliver

    Avalon Minerals – Planning to Deliver 2015 2016 2017 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Stakeholder Engagement Stakeholder plans, forums, reviews Studies & Exploration Copper production during 2018 Drilling; Studies and Exploration Scoping and Pre-Feasibility Studies Feasibility Study DFS Permittin

  25. Slide 25: Value Growth Drivers

    Avalon Minerals – Value Growth Drivers CURRENT NEAR TERM (within 12 months) LONGER TERM (>12 months) Manage appropriate funding position  Define optimised path good progress Secure Environmental Permit and all development approvals Advance selected studies (high grade targets, De-risk project throu

  26. Slide 26: Avalon Minerals Ltd.

    AVALON MINERALS Ltd. www.avalonminerals.com.au January 2015

  27. Slide 27: Appendices

    Avalon Minerals – Appendices 27

  28. Slide 28: Corporate Re-positioning

    Avalon Minerals – Corporate Re-positioning  New Board and Management Chairman Appointed November 2013. Mr. Ascough is a senior resources executive with more than 23 years of industry experience evaluating mineral Graham Ascough projects and resources in Australia and overseas. He is currently non-e

  29. Slide 29: Coverage 2014

    Avalon Minerals – Coverage 2014 Breakaway Research – • September 2014 • ‘Overlooked Northern Star’ – Speculative BUY • “Modelling indicates potential to produce up to $US110m free cash flow per year” • “Risked base case valuation of $0.068/share” (pre 10:1 share consolidation) Morgans Research – • 2

  30. Slide 30: August 2014 Scoping Study

    Viscaria Project – August 2014 Scoping Study Scoping Study assumed: 3.5Mtpa US$199 M CAPEX • a central processing facility at plant (start up) Viscaria of 3.5 Mtpa 69% Fe >10 year • feed from 4 open pits, but mine life magnetite con Open pit only dominated by D Zone and Discovery Zone 1Mtpa PRODUCTI

  31. Slide 31: Resource Estimate Summary

    Avalon Minerals – Resource Estimate Summary Currently Defined Mineral Resource for Copper reported on the Viscaria Project above a 0.4% Cu cut-off. Resource Name Classification Tonnes (Million Cu Grade (%) Cu Metal (t) Tonnes) A Zone Measured 14.44 1.7 240,000 Indicated 4.69 1.2 57,200 Inferred 2.48

  32. Slide 32: Resource Estimate Summary

    Avalon Minerals – Resource Estimate Summary Currently Defined Mineral Resource for Iron reported on the Viscaria Project above a 15% Mass Recovery cut-off Resource Name Classification Tonnes (Million Fe Grade (%) Mass Recovery Estimated recoverable Tonnes) (%) iron (Million Tonnes) D Zone Measured 2

  33. Slide 33: Resource Estimate Summary - Notes

    Avalon Minerals – Resource Estimate Summary - Notes • The A, B D and Discovery Zone Mineral Resources were prepared and first disclosed under the JORC Code 2004. They have been updated since to comply with the JORC Code (2012). • All Copper Mineral Resource estimates are reported above a block cut-o

  34. Slide 34: Resource Estimate Summary

    Avalon Minerals – Resource Estimate Summary From August 2014 Scoping Study 34

  35. Slide 35: Scoping Study Cautionary Statement

    Viscaria Project – Scoping Study Cautionary Statement The Scoping Study referred to in this presentation is based on lower-level technical and economic assessments and is insufficient to support estimation of Ore Reserves, or to provide assurance of an economic development case at this stage, or to

  36. Slide 36: Competent Persons Statement

    Competent Persons Statement Competent Persons Statement The information in this report that relates to the 2014 Scoping Study is based upon information compiled by, or under the supervision of Manish Garg B.Eng. (Hons.), Master of Applied Finance, MAusIMM, MAICD; Tim Horsley B.Sc. (Hons) (Mining Eng

  37. Slide 37: Perfectly located significant copper-iron resource

    Avalon Minerals – Perfectly located significant copper-iron resource Discovery Zone A Zone B Zone 680,000 t, or 1.5 Billion lbs Copper D Zone 9.1 Million t Recoverable iron 37