Slide 1: Paleoplacer Gold in Ontario
Paleoplacer Gold in Ontario February 2019 IVS inventusmining.com

Slide 2: Pardo Project Summary
2 Pardo Project Summary Located 65 km northeast of Sudbury, Ontario, or 200 km South of Timmins 100% ownership in 190 square km property Gold occurs in flat lying conglomerate “reefs” similar to Witwatersrand Typical gold bearing reefs are 1 to 3 m in thickness at a depth of 0 to 40 m Drilling has s

Slide 3: Regional Geology
3 Regional Geology Regional Geology of the Huronian Supergroup 16,000 km2 Sedimentary Rift Basin Cobalt Host to Elliot Lake Uranium Embayment Paleoplacers Deposited between 2.2 and 2.4 Ga Local Geology at Pardo Mississagi and Matinenda formation are fluvial sandstones and conglomerate

Slide 4: Boulder Conglomerate
4 Boulder Conglomerate Godzilla Zone Outcrop: 140 m at 5.2 g/t gold

Slide 5: Similar to Witwatersrand
5 Similar to Witwatersrand Pardo 007 Reef 30.7 g/t Au

Slide 6: Pyrite – Gold Association
6 Pyrite – Gold Association Au = gold Py = pyrite qz = quartz ru = rutile ch = chlorite ch(bi) = chlorite-biotite

Slide 7: Gold Cluster in 2017 Drill Core
7 Gold Cluster in 2017 Drill Core PD-17-04 @ 20 m depth

Slide 8: Gravity Recoverable Gold
8 Gravity Recoverable Gold 1,024 mg of fine gold panned from the tip of a gravity concentrate made from 110 kg sample of Pardo 007 Zone 1 cm

Slide 9: Pardo Project Location + Terrain
9 Pardo Project Location + Terrain Principal Area of Focus Majority of Drilling Four Season Road Current Outline of Target Geology 4km N 65 km to Sudbury

Slide 10: Drilling Highlights
10 Drilling Highlights 2017 Drilling 2007-2015 Drilling Current Outline of PD-17-56: 3.13 g/t over 2.12 m PD-12-37: 6.3 g/t over 1.25 m incl 9.41 g/t over 0.50 m Boulder Conglomerate PD-07-38: 27.2 g/t over 0.25 m PD-12-39: 24.9 g/t over 0.43 m PD-17-04: 13.2 g/t over 3.2 m PD-12-46: 3.2 g/t over 1.

Slide 11: Known Target Size
11 Known Target Size N 300 m 400 m

Slide 12: Grade x Thickness
12 Grade x Thickness N 300 m 400 m

Slide 13: X-Section View
X-Section View Aerial Photo of Pardo illustrating depth and Grade Thickness of Conglomerate Grade Drill Collars in Green ce Thickness 4 and Greater §), e 3 16m Average depth to conglomerate from surface Pee Open we : . : es Bulk Sample Site if Trench 2 007 ae Eastern Reef Near Surface Z : Looking Do

Slide 14: Sampling Challenges
14 Sampling Challenges Gold unevenly distributed in the matrix Drill Hole Matrix accounts for 10 – 40% by volume Grade determination is not unusual challenge for paleoplacers Core drilling very good for determining thickness of gold bearing reefs, but only an indication of grade. Necessitates bulk s

Slide 15: 2017 Bulk Sample Summary
15 2017 Bulk Sample Summary • 1,000 t Bulk Sample Location: Trench 1 • Completed Oct to Dec 2017 • Processed at McEwen Mining Black Fox Mill near Timmins • Results released Jan 3, 2018 • Head Grade 4.2 g/t gold 4m/0.8gpt 1.5m/4gpt • 89% Metallurgical Recovery 2.75/1.5gpt 2m/5.8gpt 4.25/2gpt 2.25/2.6

Slide 16: 2017 Bulk Sample Photos
16 2017 Bulk Sample Photos Location: Trench 1 Drill Blast Truck Pour Mill Deliver

Slide 17: 2017 Bulk Sample Details
17 2017 Bulk Sample Details Location: Trench 1 Actual Weight Mined 1,018 tonnes Calculated Dry Weight Mined 985 tonnes Au Recovered 3.72 kg / 119.5 oz Au in Tailings 0.44 kg / 14.2 oz Au Recovery % 89 % Au Total Contained 4.16 kg / 133.7 oz Calculated Au Head Grade 4.2 g/t

Slide 18: Pardo Project Milestones
18 Pardo Project Milestones Objectives in 2017: 1. Complete drilling and modeling on initial 330,000 m2 area containing approx. 1.7 million t ✔ 2. Raise funds for bulk sampling and exploration ✔ 3. Prove high-grade, mineable, flat lying layer with 1,000 t bulk sample at Trench 1 ✔ Objectives for 201

Slide 19: 2019 Bulk Sample
19 2019 Bulk Sample Location: Closure Plan Submitted for 50,000 Trench 1 t Sample Targeting Spring 2019 start, 10,000 tonnes sent to Black Fox Mill, Timmins. First Target Area for Bulk Sampling – 007 Zone 007 Mineralization exposed on surface, minimal waste mining. Impressive high grades in channel

Slide 20: 007 Zone Bulk Sampling
20 007 Zone Bulk Sampling Location: Trench 1 Bulk Sample Area

Slide 21: NI 43-101 Aug 2018 Exploration Target Size
21 NI 43-101 Aug 2018 Exploration Target Size What does it mean? 1. Estimates tonnage potential based on existing drilling using probabilistic approach. 2. Estimates grade potential based on bulk sampling, trenching and drilling. 3. Not a resource estimate.

Slide 22: NI 43-101 Aug 2018 Exploration Target Size
22 NI 43-101 Aug 2018 Exploration Target Size Parameter P10 P50 P90 Tonnage (t) 450,000 8,600,000 12,500,000 Gold Grade (g/t) 4.20 3.50 3.50 Metal Content (oz) 60,000 950,000 1,400,000 Modeled boundary covers about 5% of the Pardo Property. P10 – Pessimistic case. Assumes mineralization restricted t

Slide 23: Pardo Advantage
23 Pardo Advantage Underground Strip Mine Open Pit CAPEX: Very High OPEX: Very High ✗ CAPEX: Low OPEX: Low ✓ CAPEX: High OPEX: Medium ✗ Sortable Ore ✓ Low risk ✓ Profitable ✓ Quick Development ✓

Slide 24: Share Structure
24 Share Structure Shares Outstanding 110,301,069 Warrants 9,996,666 at $0.25 expiring 2019-2021 Options 3,627,500 Share Capital (fully diluted) 123,925,235 Share Price $0.12 Market Capitalization $13 million Cash $0.5 million (1) Updated as of February 1, 2019. All amounts in Canadian Dollars.

Slide 25: Major Shareholders TSX Venture: IVS
25 Major Shareholders TSX Venture: IVS Endurance Gold Corp.2 23% Contact Information: Rob McEwen 21% Stefan Spears Eric Sprott 13% Chairman and CEO Management 7% info@inventusmining.com Osisko Gold Royalties 6% (647) 408-1849 Total Group 69% (2) Acquired Nov 2016 in exchange for a direct 35.5% inter
Source: Internet Archive copy of static1.squarespace.com
More decks from Inventus Mining Corp.
Investor Presentation (October 2026)22 slides · October 2026
Investor Presentation (September 2026)21 slides · September 2026
Metals Investor Forum May 202615 slides · May 2026
Fact Sheet (2026)2 slides · Apr 11, 2026
Fact Sheet (July 2025)1 slide · July 2025
Investor Presentation (February 2024)22 slides · February 2024