    • Diversification strategy underway: two significant new copper projects • Strategic partnership: leading Brazilian exploration group • SPP underway: to underpin imminent exploration programs For personal use only November 2015 – Corporate Presentation Darren Gordon – Managing Director

  2. Slide 2: Disclaimer

    Disclaimer This presentation does not constitute investment advice. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation does not take into a

  3. Slide 3: Centaurus – The Investment Opportunity

    Centaurus – The Investment Opportunity o Diversified ASX-listed resource company with extensive Post-Equity Raise asset portfolio in Brazil For personal use only Capital Structure Current & Asset Acq’n o Strategy to reposition the Company well underway: Shares on Issue (incl Escrowed) 355.9m ~494.0m

  4. Slide 4: New Strategic Partner, New Opportunities

    New Strategic Partner, New Opportunities New Strategic Alliance established with Terrativa Minerais SA For personal use only o (TA), one of Brazil’s pre-eminent private exploration groups o TA holds an extensive tenement position in Brazil comprising some 200 tenements o TA set to become a major sha

  5. Slide 5: Aurora Copper – New Horizons

    Aurora Copper – New Horizons For personal use only Aurora Copper Project 5

  6. Slide 6: Aurora Copper – Project Location

    Aurora Copper – Project Location For personal use only 6

  7. Slide 7: Aurora Copper – Outstanding Logistics & Infrastructure

    Aurora Copper – Outstanding Logistics & Infrastructure o 15km from Federal highway BR-116 and less than 10km from the Transnordestina Rail (completion in 2016) For personal use only o Project rail-head is roughly 350km to the fully operational bulk cargo port of Pecém o A high tension power lines tr

  8. Slide 8: Aurora Copper – Copper Sulphide Mineralisation

    Aurora Copper – Copper Sulphide Mineralisation o Zone of extensional tectonics on a secondary shear zone For personal use only of the Patos Shear (primary shear zone of NE Brazil) o Copper sulphides identified in core as both semi-massive veins and disseminated mineralisation o Sulphide assemblage:

  9. Slide 9: Aurora Copper – Copper Oxide Mineralisation

    Aurora Copper – Copper Oxide Mineralisation o Multiple expressions of secondary copper minerals (malachite) along 3km strike, correlating well with sulphide intersections at depth For personal use only o Malachite predominant along fracture features o Grades of up to 16% Cu were returned when CTM di

  10. Slide 10: Aurora Copper – Outstanding New Targets from Historical Data

    Aurora Copper – Outstanding New Targets from Historical Data Terrativa completed ground mag For personal use only o and gravity surveys on 100m spaced lines over main target areas o From public reports Centaurus has identified that Vale completed soil geochem and IP survey work over entire project a

  11. Slide 11: Aurora Copper – Initial Exploration Program

    Aurora Copper – Initial Exploration Program Work Program for 2015/2016: For personal use only o Re-assess all CPRM and Terrativa core and field data and integrate with other public data (Vale) – Underway o Re-process Terrativa geophysical data to generate 3D inversion and compare with historical dri

  12. Slide 12: Parambu Copper – Project Location

    Parambu Copper – Project Location For personal use only 12

  13. Slide 13: Parambu Copper – Copper Oxide Mineralisation

    Parambu Copper – Copper Oxide Mineralisation o Parambu Copper Project For personal use only acquired under Strategic Alliance with Terrativa o Good Logistics and infrastructure – 150km from Transnordestina Rail and 380km from Ceará’s State capital, Fortaleza o Tenements cover the north and south lim

  14. Slide 14: Brazilian Domestic Iron Ore – Conquista DSO Iron Ore Project

    Brazilian Domestic Iron Ore For personal use only Conquista DSO Iron Ore Project 14

  15. Slide 15: Conquista DSO Project – Ground Magnetics

    Conquista DSO Project – Ground Magnetics For personal use only Conquista Project located only 8km from the recently sold Candonga DSO Iron Ore Project Significant high-grade (+64% Fe) DSO outcrop already identified on the Conquista ground over 2.5km of strike 15

  16. Slide 16: Conquista – DSO Exploration Target

    Conquista – DSO Exploration Target Rock chip samples collected to date grade 64-70% Fe with low impurities For personal use only DSO Exploration Target established at Conquista of 3.5-8Mt grading 64% to 67% Fe based on outcrop, field mapping and knowledge of the Candonga Project. The Exploration Tar

  17. Slide 17: Conquista DSO Project – Value Proposition

    Conquista DSO Project – Value Proposition  Capital and Operating Costs for Conquista likely to be very similar to Candonga Project that is only 8km away but For personal use only Project expected to be bigger based on Exploration Target Candonga Project Summary – Economics (From Feasibility Study)

  18. Slide 18: Brazilian Domestic Project Hub – Jambreiro Project

    Brazilian Domestic Project Hub For personal use only Jambreiro Project 18

  19. Slide 19: Jambreiro – Project Location

    Jambreiro – Project Location For personal use only • 110km from Ipatinga steel- making region • JORC Resource of 350km 128Mt • Initial Ore Reserve of 48.5Mt 110km • Over 19,000 metres of diamond and RC drilling to support JORC resource and 140km reserve • Extensive data set (including drill core) av

  20. Slide 20: Jambreiro – A Development-Ready Project

    Jambreiro – A Development-Ready Project Key Financial Outcome Total A significant asset that remains highly valuable to Production Rate 1Mtpa the Company For personal use only Mine Life 18 years Total Revenue A$750 million All Environmental and Mines Department approvals EBITDA A$350 million in plac

  21. Slide 21: Mombuca - Regionally Exciting Gold Project

    Mombuca - Regionally Exciting Gold Project For personal use only Mombuca Gold Project 21

  22. Slide 22: Mombuca – Project Location

    Mombuca – Project Location For personal use only 22

  23. Slide 23: Mombuca Project – Gold and Iron Ore Potential

    Mombuca Project – Gold and Iron Ore Potential Regionally significant magnetic For personal use only o anomaly (4.8km x 3.5km) with significant high-grade gold and iron ore potential o The anomaly is of similar magnitude to that covering the world-class Itabira Iron Ore Complex, located just 20km to

  24. Slide 24: Mombuca Project – Initial Target Zone, Soil Geochem

    Mombuca Project – Initial Target Zone, Soil Geochem o Detailed soils geochem program has For personal use only been conducted over the Initial Target Zone (ITZ) o Gold values in soils up to 0.8g/t Au returned over an extensive, open-ended zone 1.5km long and varying in width from 50-150m o Strongest

  25. Slide 25: Mombuca Project – Recent Stream Sediment Work

    Mombuca Project – Recent Stream Sediment Work o Three highly anomalous catchments identified by a stream sediment survey For personal use only o Stream sediment assays up to 904 ppb (0.9 g/t) Au received with nine of the 49 samples returning more than 100ppb o Anomalous catchments coincident with ma

  26. Slide 26: Mombuca Project – Regional Aeromagnetics

    Mombuca Project – Regional Aeromagnetics For personal use only  Crustal scale lineaments evident in First Vertical Derivative (1VD) delivering excellent exploration targets  Both magnetic high (hydrothermal magnetite development) and low (iron oxide depletion zones due to sulfidation) are linked w

  27. Slide 27: Centaurus – Investment Summary

    Centaurus – Investment Summary Rejuvenated and repositioned Brazilian-focused resource developer For personal use only Strategy to realize value from extensive iron ore portfolio underway First transaction completed on Candonga DSO Project New Strategic Alliance secured with prominent Brazilian expl

  28. Slide 28: New Partner, New Opportunities, New Directions in Brazil

    NEW PARTNER, NEW OPPORTUNITIES, NEW DIRECTIONS IN BRAZIL For personal use only November 2015 – Corporate Presentation Darren Gordon – Managing Director 28

Centaurus Metals — Investor Presentation (November 2015) on 6ix