Sanu Gold Corp. · CSE:SANU
Sanu Gold — Investor Presentation (January 2026)
24 slides from Sanu Gold's investor presentation, January 2026
Slide 1: Strategically Backed for Success
Strategically Backed for CSE:SANU | OTCQB:SNGCF | FRA:L73 Success Exploring Tier-1 Gold Projects in West Africa CORPORATE PRESENTATION January 2026 S A N U G O L D C O R P . C O M GUINEA HIGH-GRADE DRILLING MULTI-MILLION WEST AFRICA GOLD DISCOVERY IN PROGRESS OUNCE GOLD POTENTIAL
Slide 2: Disclaimer
Disclaimer This presentation contains certain statements that may be deemed “forward-looking statements” with respect to the This information is not intended to be and should not be construed as an offering Company within the meaning of applicable securities laws. Forward-looking statements are stat
Slide 3: The Next Big West African Discovery?
Company websites, presentations, and 43-101 technical reports. References to nearby projects The Next Big are for information purposes only and there are no assurances that the Company’s projects will receive similar results. West African Discovery? Guinea West Africa Siguiri Mine Odienné Mineral Re
Slide 4: Capital Structure
Capital Structure CSE:SANU Ticker OTCQB:SNGCF Strong Strategic, Institutional & Insider Ownership FRA:L73 Attests to quality of the projects and team’s track record Share Price* $0.30 CAD 19.5% Market Cap* $129.4M Cash* $22.1M 10% Common Shares (Issued & Outstanding) 431.4M 10% Stock Options 37.2M R
Slide 5: Guinea: An Emerging Mining Power House
Guinea: An Emerging Mining Power House French-speaking West African republic; similar in size to the UK Transitional government since 2021 with no major red tape GUINEA impediments to efficient execution of drill campaigns* Mining is a major economic driver, accounting for: 18% & 75% of GDP ¹ of exp
Slide 6: Drilling for Multi-Million Ounce Discovery
P R O J E C T P O R T F O L I O The Prolific Siguiri Basin Gold District Drilling for Multi-Million Host to multiple multi-million-ounce gold deposits Ounce Discovery Daina Diguifara Daina Extensive gold mineralisation confirmed 7.9M oz Au over multiple kilometres, open along strike and at depth Lef
Slide 7: High Grade Gold Discovery
TARGET 2 | MAIN ZONE DAI-RC-034-B DAI-RC-004 DAI-AC-088 15m of 5.48 g/t Au 21m of 4.75 g/t Au 10m of 1.54 g/t Au D A I N A P R O J E C T from 76m from 56m from 14m incl. High Grade Gold Discovery ↳ 2m of 6.81 g/t Au DAI-RC-001 DAI-RC-013 37m of 1.99 g/t Au 11m of 5.50 g/t Au From 21m from 80m with >
Slide 8: Significant Discoveries at Surface Across a Growing Mineralized Corridor
D A I N A P R O J E C T Daina 2 Main Zone + Daina 2 South Significant Discoveries at Surface Across a Growing Mineralized Corridor ~2.1 km of mineralized strike with high-grade intercepts extending from Daina 2 Main Zone to Daina 2 South Gold mineralisation confirmed from surface to ~245m vertical d
Slide 9: Broad Mineralised System Open in All Directions
D A I N A P R O J E C T Broad Mineralised System ~2.1 km of continuous gold mineralisation from Daina 2 Main Zone to South Extensions, Open in All Directions remaining open along strike and down dip Sparse drilling between key mineralised zones, highlighting significant upside through infill and ste
Slide 10: Daina South: Southern Target Along the Daina Structural Corridor
D A I N A P R O J E C T Daina 1 South: Daina 1 South Southern Target Along the Daina Structural Corridor Recent AC and RC drilling has confirmed continuity of near-surface gold mineralisation Mineralisation is defined over a ~1.3 km long geophysical trend, indicating a broad, structurally controlled
Slide 11: Salat East: An Early-Stage Gold Discovery
* The Company does not have sufficient information to make a determination of the true widths of the drill hole intercepts reported from Daina to date. For additional information see the Company’s news releases dated Oct 3, 2022, Oct 18, 2022, Jan 21, 2025, June 4, 2025, Dec 11, 2025. D A I N A P R
Slide 12: Large Mineralized System
B A N T A B A Y E P R O J E C T Large Mineralized System Bantabaye North & South Highly attractive structural setting for gold mineralization with nearby deposits of Lefa Gold Mine (7.9M oz Au) and Bankan Gold Project (5.5M oz Au) Bantabaye North Bantabaye South High-grade gold system within a ~8 km
Slide 13: Bantabaye North: High-Grade Discovery with 3km of Untested Structure
B A N T A B A Y E N O R T H High-Grade Discovery Drilling confirms gold mineralization hosted in a with 3km of untested structure coherent structural corridor Target 2 demonstrating continuity and potential * See July 27, 2023, Nov. 16, 2023, July 10, 2024, Dec 11, 2025 news releases for additional
Slide 14: >8 km Gold Corridor
D I G U I F A R A P R O J E C T >8 km Gold Corridor within trucking distance to * See Aug 18, 2022 news release for more information. world-class Siguiri Gold Mine Gold exploration permit in the NE Siguiri Basin, in between Endeavour and AngloGold Ashanti Joint Technical Committee with Strategic Inv
Slide 15: Footprint Comparison: Mined Areas vs Sanu Gold Anomalies
Footprint Comparison Mined Areas vs Sanu Gold Anomalies Mined footprints Auger Anomalies Auger Anomalies (>50 ppb_Au) (>100 ppb_Au) Termite Gold Termite Gold Anomalies Anomalies (>100 ppb_Au) (>100 ppb_Au) Daina 2 Main Zone 4.5 14.5 km km 15.6 km 13.3 km 4 km 4 km 4 km Siguiri Mine Diguifara Daina 6
Slide 16: H1 2026 Work Program
U P C O M I N G C A T A L Y S T S H1 2026 Work Program Fully funded drill program planned for H1 2026 across all 3 projects Field work in progress at high priority targets Further Extension of IP geophysics in progress Additional high-value targets or extensions to be identified from geophysics surv
Slide 17: Sanu Gold Leadership with Significant West African Experience
Sanu Gold Leadership with Significant West African Experience Management Technical Team Directors Over 50 years combined experience Martin Pawlitschek Martino De Ciccio Team’s West African Serigne Dieng PhD, MAIG President & CEO, Director Exploration Manager Chairman, Director Company Experience: Ga
Slide 18: The Next Big West African Discovery?
S A N U G O L D C O R P The Next Big West African Discovery? Focused on making West Africa's Building Scale Through Discovery next tier-1 gold discovery and System Expansion Exploring our 3 high quality projects District-scale gold potential surrounded by world-class multi-million ounce across three
Slide 19: For more information please contact
CSE:SANU | OTCQB:SNGCF | FRA:L73 For more information please contact Anthony Simone Investor Relations ir@sanugoldcorp.com +1-416-881-5154 GUINEA HIGH-GRADE DRILLING MULTI-MILLION S A N U G O L D C O R P . C O M WEST AFRICA GOLD DISCOVERY IN PROGRESS OUNCE GOLD POTENTIAL
Slide 20: Appendix
Appendix CSE:SANU | OTCQB:SNGCF | FRA:L73 | 20
Slide 21: Daina & Diguifara Projects – Blue Chip Address
F E A T U R E D P R O J E C T S Daina & Diguifara Projects – Blue Chip Address Large untested gold trends on permits surrounded by majors Combined >15 km strike length in 5 undrilled targets + 2 high priority targets for follow-up AngloGold Ashanti active on adjacent permits, and has large processin
Slide 22: Key Landholdings in the Siguiri Basin
M A L I Daina Key Landholdings in the Siguiri Basin S I G U I R I B A S I N Diguifara Lefa (Nordgold) Sanu Gold Corp AngloGold Ashanti Hummingbird M A L I Endeavour Mining Robex / Sycamore Bantabaye Siguiri (AngloGold Ashanti) Siguiri Resolute Mining Managem Dinguiraye Nordgold Lidya Madencilik Pred
Slide 23: Recent Major Investment in the Transportation Network across Guinea
Recent Major Investment in the Transportation Network across Guinea Extensive upgrades Co-development Development of a A multi-user to the 650 km long of a 670 km long port stockyard at rail network highway rail line Morébaya in construction connecting the capital of between Government & With the co
Slide 24: Earn-In Option Key Terms
Earn-In Option Key Terms Stage 1 Stage 2 Stage 3 Stage 4 DAINA DAINA DAINA DAINA BANTABAYE BANTABAYE BANTABAYE BANTABAYE DIGUIFARA DIGUIFARA DIGUIFARA DIGUIFARA USD $400,000 expenditure USD $600,000 additional USD $1 million of additional Completion of a DFS per permit in 18 months to expenditure pe