Orex Minerals Inc. · TSXV:REX
Orex Minerals — Investor Presentation (August 2015)
25 slides from Orex Minerals's investor presentation, August 2015
Slide 1: Sweden – Mexico – Canada
SWEDEN - MEXICO - CANADA GOLD –SILVER – COPPER - EXPLORATION SWEDEN – MEXICO – CANADA August 2015 1
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation of Orex Minerals Inc. (the “Company”) contains “forward-looking information” within the meaning of the United States “Private Securities Litigation Reform Act of 1995” and applicable Canadian securities legislation. Statements containing forward-looking i
Slide 3: It Takes a Team
It Takes a Team Gary Cope President, Director Ben Whiting, M.Sc., P.Geo. Vice President Exploration Art Freeze, P.Geo. Director & Technical Advisor Dale Brittliffe, P.Geo. Technical Advisor Photo (left to right): George Cavey, P.Geo Ben Whiting, Gary Cope, George Cavey, Art Freeze Advisor to Board O
Slide 4: Capital Structure
Capital Structure Current as of August 6, 2015 Share Structure Issued 101,890,199 Warrants (avg. price $0.30) 13,357,500 Options (avg. price $0.46) 6,294,000 Avg. Daily Vol. (12 Wks) 13,645 Agent’s Options ($0.25) 1,286,180 52-Week High $0.43 Fully Diluted Shares 123,982,879 52-Week Low $0.135 Notab
Slide 5: Project Portfolio
Project Portfolio CANADA SWEDEN Gold - Copper Gold and Polymetallic MEXICO Gold - Silver - Copper 5
Slide 6: Barsele Gold Project
Barsele Gold Project 45% ownership of 32,709 hectares (80,826 acres) of mineral concessions Storuman Västerbottens Län SWEDEN 6
Slide 7: Barsele Gold Project
Barsele Gold Project Located 600 km N of Stockholm Orex has 45% Ownership JV with Agnico Eagle Mines Ltd. Property is set in midst of the Fennoscandian Shield Host rocks part of prolific Proterozoic “Skellefte Trend”, where it meets ‘Gold Line’ of Sweden In the area with major producers
Slide 8: Barsele Gold Project
Barsele Gold Project MINERALS INC. SWEDEN Vasterbottens Lan a o SEY ons: Nan \Svartliden \\ Faboliden LEGEND 9 OREX Minerals Project 0 100 km \ e VMS Deposits Gold Deposits Scale 8
Slide 9: Barsele Gold Project
Barsele Gold Project Agnico Eagle Mines Ltd. JV Summary Agnico Eagle owns Agnico Eagle has an Agnico Eagle either 55% Orex owns 45% option to increase to buys additional 30% 70% by taking or continue to share Agnico Eagle pays Project to Pre- costs at 70-30 split US$10M (US$6M Feasibility up
Slide 10: Barsele Gold Project
Barsele Gold Project Why Agnico Eagle? Name recognition One of the top performing senior mining stocks Very active in M&A Strong management team Well respected in sector as senior Miner Understand Region Successful operation at Kittila Mine in Lapland, Finland Knowledgeable and well
Slide 11: Barsele Gold Project
Barsele Gold Project Spinout into Barsele Minerals Inc Why Spinout Barsele Gold Project? Increase Shareholder Value Current Orex Shareholders receive shares in NewCo Protect other assets in case of takeover Pareto Securities to raise capital Acquire other Scandinavian assets Listed on TS
Slide 12: Barsele Gold Project
Barsele Gold Project Phase-I Diamond Drill Results Central Zone – Select Drill Intercepts Core Au From To Hole Length (g/t) (m) (m) (m) Au-AA26 11CNT001 16.75 292.30 275.55 0.81 includes 35.40 234.30 198.90 1.07 11CNT002 29.65 320.40 290.75 0.92 includes 165.30 234.40 69.10 1.81 11CNT004 41.00 393.3
Slide 13: NI 43-101 Resource Estimate – Nov. 5, 2012
NI 43-101 Resource Estimate – Nov. 5, 2012 Au Cut-off Resource Au Grade Contained Zone Tonnes Central-Avan- (g/t) Category (g/t) oz Au Skiråsen Gold Zones Central Indicated 13,610,000 1.22 532,000 Indicated Resources: Central-Skiråsen Inferred 9,840,000 1.08 340,000 547,000 oz Au 0.60 Avan Indicated
Slide 14: Barsele Gold Project
Barsele Gold Project MINERALS INC. 1300000 we 86000 sw NE i Section 6575N g N ; . 081 Does i d f.07¢/t Au /198.90m _ A i; Sam i i f = /1.25g/t Au / 352, 35m i 4 — 2.25¢/t Au / 19.30m As ae i : = Ontrisket B.43q/t Au / 102.35m 1.81g/t Au / 69.10m § i [a.s7@/t au / 48.55m — PE 2 eft au /52.50m] 1008 S
Slide 15: Coneto Silver-Gold Project
Coneto Silver-Gold Project 100% ownership of 15,700 hectares (38,800 acres) of mineral concessions Coneto de Comonfort Durango State 15 MEXICO
Slide 16: Coneto Silver-Gold Project
Coneto Silver-Gold Project 16
Slide 17: Coneto Silver-Gold Project
Coneto Silver-Gold Project In the heart of the “Mexican Silver Trend” which hosts some of world's largest silver deposits: Fresnillo Guanajuato La Pitarrilla La Preciosa Real de Angeles Zacatecas Located 100 km N of city of Durango, Mexico Coneto Mining Camp has over 450 years of m
Slide 18: Coneto Silver-Gold Project
Coneto Silver-Gold Project Fresnillo PLC Association Agreement Summary Fresnillo PLC has right to Phase-IV Orex contributes Joint increase NewCo ownership Diamond Drill after Fresnillo PLC Management to 70% by advancing Program meets 70% Exploration Coneto Project to Completed in requirement Program
Slide 19: Coneto Silver-Gold Project
Coneto Silver-Gold Project Phases-I & II Diamond Drill Results Select Drill Intercepts Core True From To Au Ag Ag-Eq Hole Vein Length Width (m) (m) (g/t) (g/t) (g/t) (m) (m) CC-10-01 Loma Verde 184.10 192.90 8.80 7.72 0.47 165 193 Incl. 188.70 192.40 3.70 3.03 0.45 265 292 CC-10-12 Impulsora 109.40
Slide 20: Coneto – Diamond Drill Core
Coneto – Diamond Drill Core Oxide Mineralization 20
Slide 21: Coneto – Diamond Drill Core
Coneto – Diamond Drill Core Sulphide Mineralization Hole BCO-11 – Sample # 324423 Au = 38.3 g/t – Ag = 4,990 g/t Cu = 1.39 % – Pb = 2.51 % – Zn = 3.51 % 21
Slide 22: Coneto Silver-Gold Project
Coneto Silver-Gold Project Exploration Objectives Target size = > 100 million oz of silver equivalent 2010 2012-14 2015 Fresnillo currently completing program Fresnillo completes Orex Completes to earn 55% phase 2 & 3 Phase 1 5,000m 21 ownership on project. 22,800m 59 holes hole program Initial reso
Slide 23: Jumping Josephine Gold Project
Jumping Josephine Gold Project 100% ownership of 11,200 hectares (28,700 acres) in the West Kootenay Region, Southwestern BC, Canada NI 43-101-compliant resource estimate (cut-off of 0.5 g/t Au) that has defined 34,000 ounces of gold indicated (363,000 tonnes grading 2.95 g/t Au) and 30,000 ounces
Slide 24: Orex Advantages
Orex Advantages Orex has Three Projects in Three Mining Friendly Jurisdictions Barsele has a Joint Venture with Agnico Eagle Mines Ltd.: Orogenic Gold Deposits at surface – NI 43-101 Resource Volcanogenic Massive Sulphides (VMS) polymetallic deposits unexplored Spinout gives you shares in tw
Slide 25: Contact Information
Contact Information Orex Minerals Inc. Suite 1130 - 1055 W. Hastings Street Vancouver, BC Canada V6E 2E9 (604) 687-8566 (604) 687-6365 info@orexminerals.com www.orexminerals.com 25