IRC Limited · HKEX:1029

IRC — Q2 2012 Earnings Presentation

21 slides from IRC's earnings presentation, July 2012

  1. Slide 1: Second Quarter 2012 Trading Update

    1029.HK Second Quarter 2012 Trading Update

  2. Slide 2: IRC Q2 Conference Call reminder

    IRC Q2 Conference Call reminder 11h00 Hong Kong Time, Thursday 12 July 2012 +852 3005 2050 Passcode is 728235# please continue for slides

  3. Slide 3: Highlights

    Highlights KURANAKH • Iron ore production and sales increased • Ilmenite production and sales increased • Annual production targets reaffirmed K&S • Quarter construction activities to schedule • Electrical substation completed and processing plant foundations commenced Exploration Portfolio • Garins

  4. Slide 4: Presentation Overview

    PRESENTATION OVERVIEW 1. Introduction to IRC 2. Operations Review 3. Outlook 4

  5. Slide 5: Strategic Location

    Strategic Location for BS GARINSKOYE Heilongjiang HEL Blagoveschensk Birobidjan Heihe eS ml & Khabarovsk Manzfiouli K&S# ay Aah Es 3. eh By Shuanyashan ba Tt) MONGOLIA i as a Harbin iS ISR Suifenhe CHINA gisdh By Vladivostok Beijing IER Tianjin NORTH KOREA aot Ee SOUTH KOREA Be veel BAM Railway B ho

  6. Slide 6: Project Pyramid

    Project Pyramid Proven ability to develop develop assets through to production expand 6

  7. Slide 7: A Track Record of Delivery

    A Track Record of Delivery 2015 2014 Garinskoye K&S Commissioning 2012 Kuranakh Ilmenite Garinskoye DSO 2011 Production targets exceeded & maiden profit Dec 2011 ICBC drawdown & first SRP production Oct 2011 Kuranakh Fe full production, 1 million tonne milestone Aug 2011 K&S optimisation study: doub

  8. Slide 8: Competitive Advantages

    Competitive Advantages  Location on Chinese border: preferred supplier status  World class infrastructure and skills  Proven operator with a respected heritage  Diverse portfolio with exploration, development and producing assets  Strong growth profile being delivered across multiple assets  F

  9. Slide 9: Optionality: Project Pyramid iron ore production

    Project Pyramid million tonnes IRON ORE PRODUCTION 9.6 TOTAL 10 OPTIONALITY 9 2.1 8 7 6 3.1 5 FUNDED 4 3 3.2 1.6 2 1 0.90 1.1 1.2 1.2 1.2 0.23 0 2010 2011 2012 2013 2014 2015 CAPACITY: Kuranakh 900,000 Fe/160,000 Ilmenite K&S Kimkan: 3.2m & Sutara: 3.1m Garinskoye Initial DSO:2.1m & Full Scale Opera

  10. Slide 10: Presentation Overview

    PRESENTATION OVERVIEW 1. Introduction to IRC 2. Operations Review 3. Outlook PHOTOGRAPH: Product loading for transportation at Kuranakh 10

  11. Slide 11: Kuranakh Annual production targets on track

    Kuranakh Annual production targets on track Iron Ore: Actual 820,000 tonnes Ilmenite: Actual 125,000 tonnes Quarterly production  iron ore concentrate +19% to 203,481 tonnes Ilmenite concentrate +95% to 28,694 tonnes iron ore concentrate +24% q-on-q to 432,310 tonnes Interim production Ilmenite con

  12. Slide 12: Kuranakh Production Statistics

    Kuranakh Production Statistics 2011 2012 Q2 Q3 Q4 Q1 Q2 IRON ORE Concentrate Produced t 171,591 217,147 233,908 228,830 203,481 Concentrate Sold t 199,886 210,293 192,810 217,689 206,332 Average Price (Fe 62.5%) $/t 149 150 131 117 127 ILMENITE Concentrate Produced t 14,707 17,948 23,371 26,751 28,6

  13. Slide 13: K&S Update

    K&S Update Progress on track and fully funded Electrical substation ready for connection & Processing Plant foundations commenced MILESTONE • During quarter 750,000 m3 overburden removed - ahead of plan • Ore stockpile ahead of plan • EPC site works advancing on schedule • Processing Plant construct

  14. Slide 14: Mining & Beneficiation Plant at K&S

    Mining & Beneficiation Plant at K&S 14

  15. Slide 15: K&S: Bridge over Transiberian Railway

    K&S: Bridge over Transiberian Railway 15

  16. Slide 16: Presentation Overview

    PRESENTATION OVERVIEW 1. Introduction to IRC 2. Operations Review 3. Outlook PHOTOGRAPH: Rail transport at Kuranakh 16

  17. Slide 17: Dollar:Rouble and Iron Ore Price

    0.0 5.0 10.0 15.0 20.0 25.0 35.0 40.0 30.0 Jul-11 USD RUB Aug-11 Sep-11 Oct-11 Dollar : Rouble Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 0 20 40 60 80 100 120 140 160 180 200 $/tonne Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Iron Ore Price 17

  18. Slide 18: Outlook

    Outlook • Strong demand and firm prices for our commodities • Ongoing ramp-up of ilmenite production at Kuranakh Mine • Continued and fully funded development of K&S Project • New opportunities for low cost growth at Garinskoye • Opportunity to increase ilmenite production from Bolshoi-Seym • New ex

  19. Slide 19: Conference Call Q & A

    Conference Call Q & A

  20. Slide 20: Disclaimer

    Disclaimer 本简报或当中所述文件所载的部分陈述属于或可能属于前瞻性陈述。该等陈述反映本公司现时对未来事件的看法,或会涉及风险、假设、不明朗因 素及其他并非本公司所能控制的因素,可能导致实际结果有别于该等陈述所列者。尽管本公司相信该等前瞻性陈述(仅截至本简报日期)均属合 理,惟无法保证有关内容正确。因此,阁下不应过份依赖该等陈述。 无法保证本简报所载前瞻性陈述涉及的结果及事件将会实现。本公司并无责 任刊发有关该等前瞻性陈述的任何修订以反映本简报日期后发生的事件、情况或不可预见事项,惟法律或任何相关监管机关规定者除外。本简报或 当中所述文件所载的资料不得视为溢利预测。 本公司及其股份过往

  21. Slide 21: IR contact

    1029.HK IR contact: Nick Bias ir@ircgroup.com.hk +852 9088 1029 www.ircgroup.com.hk

IRC — Q2 2012 Earnings Presentation on 6ix