Nexans SA · EURONEXT:NEX

Nexans SA — Investor Day (February 2021)

11 slides from Nexans SA's investor day presentation, Feb 17, 2021

  1. Slide 1: Winds of Change

    Slide 1: Winds of Change

    WINDS OF CHANGE 17 FEBRUARY 2021

  2. Slide 2: How to Change? Transform and Innovate

    Slide 2: How to Change? Transform and Innovate

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY HOW TO CHANGE? TRANSFORM AND INNOVATE 045 @2021 Nexans CMD presentation

  3. Slide 3: Generation & Transmission, Distribution, Usages

    Slide 3: Generation & Transmission, Distribution, Usages

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY 01 GENERATION & TRANSMISSION 02 DISTRIBUTION 03 USAGES 046 @2021 Nexans CMD presentation

  4. Slide 4: What is Generation and Transmission?

    Slide 4: What is Generation and Transmission?

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY WHAT IS Distributed generation Distributed generation GENERATION (Utility scale) (Private) AND TRANSMISSION? Offshore wind Residential Onshore wind Datacentres Solar Infrastructures Hydro Industrial Centr

  5. Slide 5: Offshore wind farms enable the green transition

    Slide 5: Offshore wind farms enable the green transition

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY OFFSHORE WIND FARMS ENABLE THE GREEN TRANSITION 2.5X CABLE MARKET GROWTH NEXT DECADE CABLE MARKET FORECAST MAIN DRIVERS €8bn* COMPETITIVE COST OF ENERGY VS OTHER CAGR RENEWABLE SOURCES €250-400m +200GW +1

  6. Slide 6: Building the energy highway

    Slide 6: Building the energy highway

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY BUILDING THE ENERGY HIGHWAY BRINGING ENERGY FROM THE GENERATION AREA TO THE CONSUMPTION AREA TRANSMISSION MAIN DRIVERS >€25bn INCREASING SHARE OF RENEWABLES BUT GEOGRAPHICAL MISMATCH MORE POWER, +72.000 k

  7. Slide 7: Nexans has invested >€500m in the energy transition at a targeted IRR >20%

    Slide 7: Nexans has invested >€500m in the energy transition at a targeted IRR >20%

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY NEXANS HAS INVESTED > €500m IN THE ENERGY TRANSITION AT A TARGETED IRR > 20% PHASE 1 CHARLESTON PLANT NEXANS AURORA 2018-2021 THE 1ST SUBSEA HV MANUFACTURING STATE-OF-THE ART CABLE €360M FACILITY IN THE U

  8. Slide 8: Focus our resources in the best portfolio

    Slide 8: Focus our resources in the best portfolio

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY FOCUS OUR RESOURCES IN THE BEST PORTFOLIO MODELIZE TO PRICE RISK AT ITS FAIR VALUE #01 PROJECT RISK #02 ASSETS YIELD Nexans has reshuffled the backlog, lowering risk – Technology risk – Vessels & Installa

  9. Slide 9: Building reliable green energy generation & transmission

    Slide 9: Building reliable green energy generation & transmission

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY BUILDING RELIABLE GREEN ENERGY GENERATION & TRANSMISSION COMBINING ANALYTICS WITH A SOUND RISK MANAGEMENT TRACK RECORD Nexans end-to-end approach of risk management for Subsea and Land EPCI projects combi

  10. Slide 10: Manage critical generation & transmission assets

    Slide 10: Manage critical generation & transmission assets

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY MANAGE CRITICAL GENERATION & TRANSMISSION ASSETS SECURE ENERGY SUPPLY €9.3bn 1 YEAR Expected cost of 2020-2030 interconnection Worst case repair duration due to cable outage, which is 2x to 5x more than c

  11. Slide 11: Pushing technical frontiers

    Slide 11: Pushing technical frontiers

    01 02 03 04 05 INTRODUCTION WHY CHANGE? WHAT TO CHANGE? HOW TO CHANGE? NEW FINANCIAL TRAJECTORY PUSHING TECHNICAL FRONTIERS BROADENING THE SCOPE OF POSSIBILITIES FOR OUR CLIENTS 2020 2024 CUTTING EDGE TECHNOLOGY AMPLIFY TECHNOLOGY LEADERSHIP HVDC Extruded: 525kV Subsea and Land cable system • Increa

Source: Internet Archive copy of nexans.com