Blue Thunder Mining — Investor Presentation (January 2022)
16 slides from Blue Thunder Mining's investor presentation, January 2022
Slide 1: The right location, time and team for an exciting new discovery
The right location, time and team for an exciting new discovery JANUARY 2022
Slide 2: Forward Looking Statements
Forward Looking Statements This document contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein includ
Slide 3: Investment Highlights
Investment Highlights Large land package •~51,000 ha south of the Chibougamau- in an emerging Chapais Mining Camp (produced >3B lbs Cu and 4M oz Au)3 gold camp •Highly prospective area, on trend with the recent At the crossroads of Nelligan (3.2M oz Au at 1.0 g/t Au)1 & Monster three major structure
Slide 4: Capital Markets Profile
Capital Markets Profile § Highly supportive shareholder base § Compelling valuation relative to peers Ticker TSXV:BLUE OTCQB: BLTMF Share Price TSXV (Jan 10, 2022) C$0.035 Share Price OTCQB (Jan 10, 2022) USD$0.025 Principal Shareholders Basic Shares Outstanding 102.80M Retail and Red Cloud Options
Slide 5: Strong Management Team, Accomplished Board
Strong Management Team Accomplished Board Chad Williams Jean François Métail Executive Chairman and Director President § Founder and Chairman of Red Cloud Securities and § 30 years of international experience advancing Sharechest Inc. gold projects from exploration and § Former CEO of Victoria Gold
Slide 6: Located in an Emerging Gold Camp
Located in an Emerging Gold Camp Revived Gold District South of Historic Chibougamau-Chapais Mining Camp Produced over 3 billion lbs of copper and over 4 million oz of gold1 Chibougamau Chapais Highway 113 Embry Hi gh wa Fancamp Chevrier y1 67 Monster Lake Muus East Muus Philibert Joe Mann Meston Pr
Slide 7: Muus Project at a Glance
Muus Project at a Glance Southern Chapais Chibougamau-Chapais MUUS Project The rise of a new mining camp § World-Class mining camp with renewed § The Guercheville Fault System: A new § 51,000 ha of ground with limited interest for gold deposits gold bearing complex structure historical exploration §
Slide 8: Muus Project: Outstanding Location
Muus Project: Outstanding Location Chevrier Main Zone Deposit (3): Ind: 11Mt @ 1.2 g/t = 423Koz Inf: 7.4 Mt @ 1.3 g/t = 303Koz Monster Lake Deposit (1): Fancamp Inf: 1.1Mt @ 12 g/t = 433Koz Au Joe Mann Mine camp Muus East Historical Production (4): n Fa DZ 1.8Moz @ 8.5 g/t Au Guer Muus chev il DZ le
Slide 9: Muus Project History
Muus Project History Historic Exploration Blue Thunder Exploration Activities § Muus Property explored 1950’s to 1980’s § Acquired Muus property (12,000 ha) in 2017 § Fancamp mostly drilled 1950’s to 1990’s § Expanded landholdings to ~51,000 ha § Nisk, Muus East and Embry remain mostly § Exploration
Slide 10: Muus Project Geophysics Surveys
Muus Project Geophysics Surveys Embry Fancamp (14KM) Muus East p DZ cam n Muus Fa Guer chev il le DZ Dru illet te S yn c l i ne Resource Definition Advanced Exploration Drill testing Target Delineation Grassroot Nisk Total magnetic intensity “Deposits and Showings” and “Regional Structures” adapted
Slide 11: Muus Project Geochemical Surveys
Muus Project Geochemical Surveys Secondary Environment – Sediment Samples Legend Fancamp Sampling Showings Till samples Muus Soil samples East Regional Structures Deformation zones Blue Thunder Properties Muus Resource Definition Advanced Exploration Nisk Drill testing Target Delineation Total magne
Slide 12: Muus Project Recent Drilling
Muus Project Recent Drilling Drilling 2020 Fancamp - 14 DDH 2,808m Muus - 6 DDH 1,278m Drilling 2021 Fancamp - 5 DDH 787m Muus - 7 DDH 1,721m Fancamp camp Muus East n Fa DZ Guer Muus chev il DZ le Dru Resource illet Guercheville te S Definition ync line Advanced DZ Exploration Drill testing Target D
Slide 13: In 2022 we're taking Muus to the next level
In 2022 we’re taking Muus to the next level We’re expecting 2022 to be a pivotal year as we continue to aggressively explore for multiple styles of gold and base- metal mineralization § Complete compilation of historical work Compilation & § Refine structural and geochemical interpretation to Interp
Slide 14: Other Companies in the Chibougamau District
Other Companies in the Chibougamau District Trading at a fraction of the market cap of explorers in the region Potential for a big re-rating upon exploration success Market Cap1 C$4.63M C$24.8M C$51.5M C$55.2M Key Project(s) Muus Project Nelligan (25%) Corner Bay, TPK, (Fancamp & Muus Cedar Bay, Lac
Slide 15: Why Invest?
Why Invest? • Largest land position in area with 510 km2 • Redefined gold district with significant past Right Location production1 • Major new discoveries in one of the best mining jurisdictions in the world • 3 years to build up integrated 3D model • Understanding of geology and structural Right T
Slide 16: Contact Us
Aerial photo of target area on the Fancamp Property Contact Us Blue Thunder Mining Inc. 401 Bay Street Suite 2100, P.O. Box 55 Toronto, ON, M5V 2Y4 info@bluethundermining.com 1-647-848-1009 bluethundermining.com 16 TSXV:BLUE | OTCQB: BLTMF
Blue Thunder Mining — Investor Presentation (January 2022) on 6ix