Vrx Silica Ltd. · ASX:VRX

Vrx Silica — Ventnor Resources — RIU Explorers Conference 2012

53 slides from Vrx Silica's conference presentation, Feb 21, 2012

  1. Slide 1: RIU Explorers Conference February 2012

    For personal use only ASX: VRX RIU Explorers Conference February 2012 Bruce Maluish, Managing Director www.ventnorresources.com.au

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This projects summary was prepared with due care and attention and is current at the date of the presentation. The summary is not an offer or recommendation to purchase or subscribe for securities in Ventnor Resources Limited or to retain any securities currently hel

  3. Slide 3: Exploration Projects

    Exploration Projects For personal use only • Thaduna/Green Dragon Copper Project • Warrawanda/Nickel Hills Nickel Project • Georgina Basin IOCG Project

  4. Slide 4: Exploration Projects

    For personal use only Exploration Projects

  5. Slide 5: Thaduna/Green Dragon

    Thaduna/Green Dragon For personal use only • 175 Kms Nth Meekatharra • 4PLs covering 604 Ha 2 ELs covering 17 blocks • Sandfire Resources De Grussa 40km west • Significant first, second and third phase results • Fourth phase underway

  6. Slide 6: Thaduna

    For personal use only Thaduna

  7. Slide 7: Thaduna/Green Dragon

    For personal use only Thaduna/Green Dragon

  8. Slide 8: Thaduna/Green Dragon

    For personal use only Thaduna/Green Dragon

  9. Slide 9: Typical Hydrothermal Copper Geology

    Typical Hydrothermal Copper Geology For personal use only

  10. Slide 10: Thaduna

    Thaduna For personal use only • Mining and production completed 1971 • Prior production 30,290 t @ 8.7% Cu • Historic drilling 9m @ 5.22% Cu from 80m

  11. Slide 11: For personal use only

    For personal use only

  12. Slide 12: Thaduna

    Thaduna For personal use only • First phase April 2011 included: – 16m @ 3.47% Cu from 80m; – 4m @ 4.37% Cu from 87m and – 7m @ 5.70% Cu from 75m.

  13. Slide 13: Thaduna

    Thaduna • Second phase July 2011: For personal use only – 5m @ 4.21% Cu from 30 m; – 3m @ 4.47% Cu from 121m; – 5m @ 5.10% Cu from 100m; – 4m @ 3.85% Cu from 122m and – 11m @ 5.57% Cu from 100m.

  14. Slide 14: Thaduna

    Thaduna • Third phase November 2011: For personal use only – 10m @ 7.53% from 134m – 32m @ 3.10% from 127m • Phase 4 Drilling underway

  15. Slide 15: Thaduna after 2nd phase

    Thaduna after 2nd For personal use only phase

  16. Slide 16: Thaduna after 3rd phase

    Thaduna after 3rd phase Announcement: 24 January 2012 For personal use only • 37 metres at 2.61% Cu from 111 metres (THRC113) – including 10 metres at 7.53% Cu from 134 metres downhole; • 62 metres at 2.19% Cu from 125 metres (THRC114) – including 32 metres at 3.10% Cu from 127 metres downhole and e

  17. Slide 17: Thaduna Project January 2012

    For personal use only VENTNOR RESOURCES LIMITED Thaduna Project January 2012 250 metres & 3 drilled

  18. Slide 18: Thaduna

    For personal use only Thaduna

  19. Slide 19: Core from THRC057

    For personal use only Core from THRC057

  20. Slide 20: Core from THRC057

    For personal use only Core from THRC057

  21. Slide 21: Core from THRC057

    For personal use only Core from THRC057

  22. Slide 22: Thaduna Copper Geology

    Thaduna Copper Geology For personal use only

  23. Slide 23: Thaduna Project Mineralisation Relative to Tenement Boundary

    For personal use only 771000mE 772000mME (BY 500 metres © Phase 1 & 2 drilling © Phase 3 drilled © Planned Drilling 773000mE Mineralised Zone 7175000mN. VENTNOR RESOURCES LIMITED Thaduna Project Mineralisation Relative to the Tenement Bou December 2011

  24. Slide 24: Green Dragon

    Green Dragon For personal use only • Mining undertaken at same time as Thaduna and ceased 1971 • Prior production 9,100 t @ 5.2% Cu • Historic drilling 10m @ 5.4% Cu from 97m

  25. Slide 25: Green Dragon

    For personal use only Green Dragon

  26. Slide 26: Green Dragon

    Green Dragon For personal use only • First phase drilling April 2011: – 3m @ 5.16% Cu from 64m, – 5m @ 7.19% Cu from 44m, – 2m @ 3.15% Cu from 79m, – 5m @ 2.25% Cu from 85m

  27. Slide 27: Green Dragon

    For personal use only Green Dragon

  28. Slide 28: Green Dragon

    Green Dragon For personal use only • Second phase July 2011: – 2 m @ 9.00% Cu from 85 m; – 4m @ 2.98% Cu from 44m; – 4m @ 7.86% Cu from 60m; – 5m @ 6.07% Cu from 80m; – 12m @ 5.07% Cu from 64m and – 5m @ 5.93% Cu from 88m.

  29. Slide 29: Green Dragon

    Green Dragon • Third phase November 2011 announced 21 February 2012: For personal use only – 5m @ 6.07% Cu from 80m; – 12m @ 5.07% Cu from 64m; – 5m @ 5.93% Cu from 88m; – 6m @ 10.96% Cu from 37m and – 9m @ 4.00% Cu from surface. • Phase 4 Drilling underway

  30. Slide 30: Section 774900mE

    For personal use only 7181300mN 7181200mN [J Mineratised Zone ~ Ventnor Resources Li Section 774900mE February 2012 7181100mN 100 metres 710.28 ~310.23 1214.99 ssoRL|

  31. Slide 31: Section 774940mE

    For personal use only 7181200mN % % % a Legend 5/6.07 Xx 5m @ 6.07% Cu +1% Cu 714.43 7m @ 4.43% Cu 40.2% Cu [J] Mineratised Zone me Ventnor Resources Limited Section 774940mE February 7181100mN 7181000mN 7180900mN. Surface 100 metres

  32. Slide 32: Green Dragon

    For personal use only Green Dragon

  33. Slide 33: Thaduna

    For personal use only Thaduna

  34. Slide 34: Warrawanda and Nickel Hills

    Warrawanda and Nickel Hills For personal use only

  35. Slide 35: Warrawanda

    Warrawanda For personal use only • 60 kms Sth of Newman • 10 Pl’s 1202 Ha; 1 EL 17 km2 • Previous shallow exploration • EM survey April 2011 targets selected • Drilling undertaken July 2011 • 13 holes for 2,494 metres

  36. Slide 36: Warrawanda

    For personal use only Warrawanda

  37. Slide 37: For personal use only

    Chrysophase ig Cover Pyrite + Cu —-» Chalcopyrite Pyrrhotite + Ni —-» Pentlandite Mag Sensitivity ——

  38. Slide 38: For personal use only

    For personal use only

  39. Slide 39: Warrawanda TMI

    For personal use only Warrawanda TMI

  40. Slide 40: Warrawanda Drill Targets

    Warrawanda Drill Targets For personal use only

  41. Slide 41: Warrawanda Drill Results

    Warrawanda Drill Results  A massive east-west ultramafic intrusion 15 kilometres For personal use only long, up to 400 metres wide with ~0.2% nickel background values  Nickel grades up to 0.50%, iron and sulphur - Mt Keith style mineralisation  Nickel grades up to 0.58%, iron and cobalt - Indian

  42. Slide 42: Nickel Hills

    Nickel Hills For personal use only • 6 km Nth of Warrawanda - 2 EL’s 82km2 • Occurrences of copper and nickel sulphides in rock chips • EM and magnetic survey identified a Banded Iron Formation with a strike length of 7.5 kilometres • Drill targets selected for 2012

  43. Slide 43: Nickel Hills TMI

    For personal use only Nickel Hills TMI

  44. Slide 44: Georgina Basin

    Georgina Basin For personal use only • 200 km SW Mt Isa • 8 EPMs - 2,034km2 - granted Sept 2011 • Mt Isa inlier well endowed with IOCG and massive sulphide deposits • Coincident magnetic and gravity anomalies

  45. Slide 45: Georgina Basin

    For personal use only Georgina Basin

  46. Slide 46: Georgina Basin

    For personal use only Georgina Basin

  47. Slide 47: GBDD01 gravity and magnetic anomaly

    GBDD01 Suizes a 600m Depth to Possible Basement Contact Gravity Anomaly Magnetic Anomaly Proposed Depth 1200m Gravity Anomaly

  48. Slide 48: For personal use only

    For personal use only

  49. Slide 49: For personal use only

    For personal use only

  50. Slide 50: Georgina Basin Exploration

    Georgina Basin Exploration For personal use only • Collect higher resolution gravity, magnetic and radiometric data • Compile 3-D inversion of the gravity, magnetic and radiometric data from the survey and analyse for anomalies • Follow up with targeted deep diamond orientation drilling in 2012

  51. Slide 51: Capital Structure

    Capital Structure For personal use only Issued Shares Options Total 61.8 M 25.4 M Cash on hand $5.7 M @ Feb 2012 Market Cap @ 70c $41.4 M

  52. Slide 52: Competent Persons Statement

    Competent Persons Statement For personal use only The information in this presentation that relates to Exploration Results is based on information compiled by Mr David Reid who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Reid is an employee of Ventnor Resources L

  53. Slide 53: Contact

    Contact For personal use only Bruce Maluish Managing Director Lvl 1, 6 Thelma Street West Perth WA 6005 E: brucem@ventnorresources.com.au M: 0418 940 417 P: 08 9226 3780