    Boston & New York City Investor Meetings May 17 & 18, 2012

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    1 Forward Looking Statements www.bpzenergy.com NYSE & BVL: BPZ This Presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934.These forw

  3. Slide 3: BPZ Energy in Peru

    Slide 3: BPZ Energy in Peru

    2 BPZ Energy in Peru www.bpzenergy.com NYSE & BVL: BPZ Focus Oil & Gas Four Blocks Working interests: Block Z-1: 51% * Onshore: 100% Acreage 2.2 million gross acres Current Production Corvina & Albacora ** Oil Fields Offshore Exploration Multiple Plays * JV partnership signed in April 2012, subject

  4. Slide 4: More About Us

    Slide 4: More About Us

    3 More About Us www.bpzenergy.com NYSE & BVL: BPZ NYSE & BVL Ticker BPZ Market Capitalization (1) $ 390 MM Shares Outstanding 116 MM 2011 Proved Oil Reserves (2) 35 MMBO 2011 Avg. Daily Production (3) 3,775 BOPD gross 1Q 2012 Avg. Daily Production 3,880 BOPD gross 2012 Capital & Exploratory Budget $

  5. Slide 5: Strengthening the Foundation

    Slide 5: Strengthening the Foundation

    4 Strengthening the Foundation www.bpzenergy.com NYSE & BVL: BPZ Installed reinjection equipment on the Albacora platform Implemented gas cap reinjection at Corvina with positive results Artificial lift programs in both fields Fabrication of the new CX-15 platform underway Completed seismic interpre

  6. Slide 6: Oil Reserve History

    Slide 6: Oil Reserve History

    5 Oil Reserve History www.bpzenergy.com NYSE & BVL: BPZ Note: Represent 100% of Block Z-1 Proved, Probable and Possible reserves for 2009-2011. On December 31, 2008, the SEC adopted the final rules regarding amendments to current Oil and Gas reporting requirements. The amendments were designed to mo

  7. Slide 7: 2012 Key Initiatives

    Slide 7: 2012 Key Initiatives

    6 2012 Key Initiatives www.bpzenergy.com NYSE & BVL: BPZ Achieving commerciality at Albacora oil field Optimizing oil production via reservoir management and artificial lift Developing 23 MMBO of Corvina PUDs from new CX-15 platform Exploring onshore and offshore Unlocking asset value

  8. Slide 8: Achieving Commerciality at Albacora

    Slide 8: Achieving Commerciality at Albacora

    7 Achieving Commerciality at Albacora www.bpzenergy.com NYSE & BVL: BPZ Steps to Commerciality Equipment placed on platform Installation and tie-ins complete Testing complete Extension of flaring permits received Final permit to commission equipment

  9. Slide 9: Optimizing Oil Production

    Slide 9: Optimizing Oil Production

    Optimizing Oil Production 8 www.bpzenergy.com NYSE & BVL: BPZ Corvina Field Gas cap reinjection underway Reservoir performance shows marked improvement Continue artificial lift program Albacora Field A-14XD well producing oil naturally Continue artificial lift program

  10. Slide 10: The New CX-15 Platform

    Slide 10: The New CX-15 Platform

    The New CX-15 Platform 9 www.bpzenergy.com NYSE & BVL: BPZ First Buoyant Tower in Peru $77 MM project cost 24 slots Production and reinjection equipment already included CX-15 and CX-11 platforms connected via 4 subsea pipelines Anticipated drilling every 6-8 weeks $10 MM-$12 MM drill costs per well

  11. Slide 11: Developing Corvina's MMBO of PUDs: The New CX-15 Platform

    Slide 11: Developing Corvina's MMBO of PUDs: The New CX-15 Platform

    Developing Corvina’s 23 MMBO of PUDs 10 www.bpzenergy.com NYSE & BVL: BPZ The New CX-15 Platform Contracts for fabrication signed and work underway Transport and install new platform in 3Q 2012 Commence New CX-15 drilling campaign 4Q 2012 Hull Top Section Cellar Deck Production Deck

  12. Slide 12: Exploring Onshore Blocks

    Slide 12: Exploring Onshore Blocks

    Exploring Onshore Blocks 11 Blocks XIX & XXIII Mancora Gas, Heath & Eocene Oil 3D Seismic EIA for Block XIX Conduct 3-D seismic on Block XIX 2-D and 3-D seismic interpretations completed on Block XXIII Drilling EIA approval for Block XXIII Drill exploration commitments Launch Partnering Process Bloc

  13. Slide 13: And Exploring Offshore Block Z-1

    Slide 13: And Exploring Offshore Block Z-1

    And Exploring Offshore Block Z-1 Overview 3-D seismic EIA granted Survey underway with 80% complete Complete 3-D seismic survey Process and interpret data Future exploration via New Joint Venture 12 www.bpzenergy.com NYSE & BVL: BPZ

  14. Slide 14: Unlocking Block Z-1 Value

    Slide 14: Unlocking Block Z-1 Value

    Unlocking Block Z-1 Value 13 www.bpzenergy.com NYSE & BVL: BPZ New Joint Venture Summary BPZ Energy retains 51% participating interest. Administrative, regulatory, government and community related duties. Pacific Rubiales (PRE) assumes 49% participating interest. Technical and operational duties in

  15. Slide 15: JV = Catalyst for Value Creation

    Slide 15: JV = Catalyst for Value Creation

    JV = Catalyst for Value Creation 14 www.bpzenergy.com NYSE & BVL: BPZ Current and Future Benefits Partnership with PRE already underway! Enhanced operational, technical and financial support Cash advances to BPZ ongoing before government approvals BPZ share of 2012, 2013, and some, if not all of 201

  16. Slide 16: Corporate & Social Responsibility

    Slide 16: Corporate & Social Responsibility

    Corporate & Social Responsibility 15 www.bpzenergy.com NYSE & BVL: BPZ Investing with Social Inclusion

  17. Slide 17: Catalysts for Growth

    Slide 17: Catalysts for Growth

    Catalysts for Growth 16 www.bpzenergy.com NYSE & BVL: BPZ

  18. Slide 18: Conclusion

    Slide 18: Conclusion

    Conclusion 17 The BPZ team will be recognized for excellence in exploring, developing and producing oil and gas in the Americas. For additional information please contact: A. Pierre Dubois Investor Relations & Corporate Communications BPZ Energy 580 Westlake Park Blvd., Suite 525 Houston, Texas 7707

  19. Slide 19: Appendix – GAAP Reconciliation

    Slide 19: Appendix – GAAP Reconciliation

    Appendix – GAAP Reconciliation 18 Reconciliation of non-GAAP measure The table below represents a reconciliation of EBITDAX to the Company’s net income (loss), which is the most directly comparable financial measure calculated in accordance with generally accepted accounting principles in the United

  20. Slide 20: Appendix - JV Approval Process

    Slide 20: Appendix - JV Approval Process

    Appendix - JV Approval Process 19 www.bpzenergy.com NYSE & BVL: BPZ Approval Up to 12 month process expected Review by Perupetro, Ministry of Energy and Mines, Ministry of Economy and Finance as well as President of Peru. Non-approval If BPZ existing Bank Loans are not fully repaid by the terminatio