  1. Slide 1: Plutonic Gold Belt

    Plutonic Gold Belt Exploration success and optionality to increase processing capacity – reducing risk to ± 200koz pa May 2026 A S X : CY L

  2. Slide 2: Simple portfolio – two large strategic gold belts underpinning long-term organic growth

    Simple portfolio – two large strategic gold belts underpinning long-term organic growth CATALYST METALS LIMITED Strong balance sheet and existing operations provide a strong foundation to achieve ±200koz production and ±2Moz Reserve targets Group Production AISC (2026 guidance) Group Reserves Group

  3. Slide 3: Corporate Overview

    Corporate Overview CATALYST METALS LIMITED Capital Structure (at 18 May 2026) Balance Sheet Share Price A$5.46 Cash Available Liquidity Shares on Issue 261m A$277m A$377m Market Capitalisation A$1.4bn (Incl. undrawn corporate revolving debt facility of A$100m) Cash and Bullion (at 31 March 2026) A$2

  4. Slide 4: The Plutonic Gold Belt

    The Plutonic Gold Belt Endowment and infrastructure to support ± 200koz pa

  5. Slide 5: Existing, latent infrastructure and sunk capital

    Existing, latent infrastructure and sunk capital CATALYST METALS LIMITED Allows for faster development at lower cost 40km Haul Road K2 Underground (UG) Mine 50km Ramp up Underutilised central 20koz pa average production processing plant 1.4 Mt/2 Mtpa Cinnamon Studies/approvals TBA Airstrip Expanded

  6. Slide 6: A 10-year plan underwritten by Reserves

    A 10-year plan underwritten by Reserves CATALYST METALS LIMITED Resource drill outs underway to aiming to increase Reserves Gold Production (koz) Pipeline Resources Hermes, Triple P, Parrot/Rosella 200koz pa Average annual production and grade1,2 165-185 Old Highway 35koz 4.6g/t A$2,750/oz to 130-15

  7. Slide 7: Infrastructure and endowment

    Infrastructure and endowment CATALYST METALS LIMITED The consolidated belt provides ore sources to allow Plutonic to return to a ±200koz pa production hub The early years A forgotten belt Reinvigorating Plutonic (av. 225koz pa) (av. 87koz pa) (200koz pa) Significant investment across Belt Harvesting

  8. Slide 8: Long-term foundations

    Long-term foundations Setting the platform to ± 200koz pa

  9. Slide 9: Optionality to increase Plutonic’s mill throughput

    Optionality to increase Plutonic’s mill throughput PLUTONIC GOLD MINE Low capital expansion opportunity further de-risks path to ±200koz annual production • Study undertaken evaluating increasing existing processing capacity from 2Mtpa to between 2.5Mtpa to 3.0Mtpa • Study assessed refurbishing seco

  10. Slide 10: Second mill creates optionality

    Second mill creates optionality PLUTONIC GOLD MINE Second processing circuit creates optionality for longer term plan Two scenarios considered: PP1 circuit (operating) PP2 circuit (care & maintenance) 1 Two standalone circuits – PP1 and PP2 2 • Utilise upgraded PP1 crushing circuit to feed parallel

  11. Slide 11: Haul road operational

    Haul road operational PLUTONIC GOLD MINE Connecting satellite mines to the central processing plant K2 mine 10km Trident mine ASX:CYL Cinnamon (5km) 11 Plutonic processing plant 30km 11

  12. Slide 12: Building the pipeline, creating optionality

    Building the pipeline, creating optionality CATALYST METALS LIMITED Recent acquisitions consolidate historically fragmented and underexplored region • ~190km near contiguous land package • Haul road access to Plutonic Processing • Fragmented ownership history – limited modern exploration Plant Fortn

  13. Slide 13: Growing Resources at four key deposits

    Growing Resources at four key deposits Predominantly surface exploration focussed on growing Resources and Reserves

  14. Slide 14: Cinnamon – Resource Growth Target

    Cobalt Cinnamon – Resource Growth Target Resource pending PLUTONIC GOLD MINE A sixth potential underground ore source Pit optimisation at A$3,200/oz Based on historic drilling Cinnamon Plutonic Resource 3.0Mt at 1.5g/t Au for 145koz Processing Plant 6m at 8.4g/t Au via 25km existing 19m @ 2.1g/t Au

  15. Slide 15: Cinnamon underground - Resource Growth Target

    Cinnamon underground - Resource Growth Target PLUTONIC GOLD MINE Repeat conglomerate units - potential for stacked higher-grade zones at depth Pit optimisation (unmined) at A$3,200/oz N Based on historic drilling Cinnamon Cross Section 100m Target zone 200m Shear Targeting repeats ASX:CYL Siltstone

  16. Slide 16: Cinnamon Trend

    Cinnamon Trend PLUTONIC GOLD MINE East Prickley Structural complexity creates attractive exploration targets West Prickley 10km Cobalt 9km Kookaburra • +10km conglomerate unit runs along Cinnamon centre of belt 8km • Largely untested below 70m ASX:CYL Legend Skyhawk 7km Mafic Conglomerate (sediment)

  17. Slide 17: Old Highway – Resource Growth Target

    Old Highway – Resource Growth Target PLUTONIC GOLD MINE Plutonic processing plant Targeting doubling of the current 4 year mine life at Main 400, which lies within a broader, untested, 4km strike Old Highway West Resource pending Main West Old Highway Main 250 Resource pending Unmined 1.0Mt at 1.6g/

  18. Slide 18: Old Highway – Resource Growth Targets

    Old Highway – Resource Growth Targets PLUTONIC GOLD MINE Plutonic processing plant +4km of target areas – intersection of shear and wacke host Primary target where wacke Fault intersects shear zone Old Highway Central 400 OP = 0.1Mt at 2.8g/t Au for 13koz UG = 0.9Mt at 4.6g/t Au for 140koz Fault ASX

  19. Slide 19: Plutonic Main – Resource Growth Targets

    Plutonic Main – Resource Growth Targets PLUTONIC GOLD MINE New areas in mine plan de-risk Plutonic as a baseload ore source Plutonic Exploration target processing plant Resource • Future Reserve growth at Plutonic Main development targets • Progress to date converting Baltic Deeps into LOM • Complet

  20. Slide 20: Trident – Growing Resources

    Trident – Growing Resources PLUTONIC GOLD MINE 20km ~800koz and growing; further Reserves expected from conversion of inferred to indicated Plutonic processing plant Open pit development completed April 2026 Plutonic processing plant 30km UG setup underway Indicated 527koz at 6.4g/t 21m at 5.1 g/t A

  21. Slide 21: Replacing depletion at two operations

    Replacing depletion at two operations Targeting low-cost, near mine Reserve replacement

  22. Slide 22: Plutonic East – replacing depletion

    Plutonic East – replacing depletion PLUTONIC GOLD MINE 20km Low-cost replacement of depleted ounces Plutonic processing plant 7m @ 11.1g/t Au 2m @ 6.2g/t Au 2m @ 9.8g/t Au 7m @ 2.3g/t Au 4m @ 5.7g/t Au 14m @ 2.1g/t Au 16m @ 3.3g/t Au ASX:CYL 3m @ 7.3g/t Au • Single drill rig conducting grade control

  23. Slide 23: K2 – replacing depletion

    K2 – replacing depletion PLUTONIC GOLD MINE 20km Recent drilling informing target areas Plutonic processing plant Resource development target ASX:CYL Immediate Resource development target Resource development target Planned LOM stopes Existing development • Limited historical drilling outside of exi

  24. Slide 24: Greenfield exploration focus at Plutonic

    Greenfield exploration focus at Plutonic Momentum building behind increasingly sophisticated, well-funded, consistent exploration team

  25. Slide 25: Growth in deposits under Catalyst ownership

    Growth in deposits under Catalyst ownership CATALYST METALS LIMITED Few holes at depth in 2023, but showed the potential for mineralisation to continue at depth Trident Cinnamon 2023 2023 Mineralisation envelope Reserves doubled Mineralisation envelope to 397koz Higher grade UG zone discovered Grade

  26. Slide 26: Triple P

    Triple P CATALYST METALS LIMITED 20km Trying to replicate Trident and Cinnamon success Plutonic processing plant • One of the +40 open pits from the 1990’s without follow up drilling at depth • Increasing understanding of structural complexity as team continues work Historic open pit production1 183

  27. Slide 27: Parrot

    Parrot CATALYST METALS LIMITED 20km Trying to replicate Trident and Cinnamon success Plutonic processing plant • Historic intercept of 8m at 6.5g/t never followed up Historic open pit production1 406kt at 2.3g/t for 30koz ASX:CYL 27 27 (1) Sourced from internal production records (2) Refer to ASX an

  28. Slide 28: Rosella

    Rosella CATALYST METALS LIMITED 20km Trying to replicate Trident and Cinnamon success Plutonic processing plant • Untested below 100m along mineralised trend Historic open pit production1 159kt at 2.0g/t for 10koz ASX:CYL 28 28 (1) Sourced from internal production records (2) Refer to ASX announceme

  29. Slide 29: Project pipeline – considerable pipeline along a heavily mineralized belt

    Project pipeline – considerable pipeline along a heavily mineralized belt CATALYST METALS LIMITED +40, shallow open pits – mined in 1990’s Target Resource Project Exploration Production identification definition development Overthrust Callop 90% of historical drilling Corridor Fifi Catfish <100m Bar

  30. Slide 30: Appendices

    Lae LAD fA Appendices

  31. Slide 31: Group Reserves and Resources

    Group Reserves and Resources APPENDICES Reserves3,4 Proven Probable Total Ore Reserve Tonnes (Mt) Grade (g/t Au) Ounces (koz) Tonnes (Mt) Grade (g/t Au) Ounces (koz) Tonnes (Mt) Grade (g/t Au) Ounces (koz) Plutonic Belt high-grade - - 3.3 4.9 518 3.3 4.9 518 Plutonic Belt low-grade - - 14.8 2.1 1,02

  32. Slide 32: Disclaimers

    Disclaimers CATALYST METALS LIMITED IMPORTANT NOTICE AND DISCLAIMER This investor presentation (the Presentation) has been prepared by Catalyst Metals Limited (ASX: CYL) (Catalyst or the Company). SUMMARY INFORMATION This Presentation contains summary information about Catalyst its respective subsid

  33. Slide 33: Disclaimers

    Disclaimers CATALYST METALS LIMITED FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS Some statements in this Presentation regarding estimates or future events are forward-looking statements. They include indications of, and guidance on, future matters. Forward-looking statements include, but are no

  34. Slide 34: Contact

    Contact Craig Dingley Catalyst Metals E: investors@catalystmetals.com.au T: +61 8 6324 0090